New Technologies, ancient civilization, history, sport minded, music, guitar and dancing
1) Management: 14 years. and 4 months.
2) Engineering
3) Projects
a) Telecom Cell Sites (Greenfield & Rooftop Sites)
Tower Conversion, Relocation, and NFTK
- Wireless/FOC
b) Highrise Buildings
- Mototrade Building and Galleon Condo
c) Residential Houses
Mid- and High-End Subdivisions and Villages
d) Supermarkets retail, and restaurants
- Shopwise and Shopwise Express
Andok's Outlets and Restaurants
Mall Retails and Outlets
e) Hotels and Casinos
City of Dreams (Belgrade)
f) Malls
Ayala Mall Feliz, Unison Shopping Mall
Podium Mall (outlets)
g) Hotels, Resorts, and Residential
Camaya Coast
Las Cabanas El Nido Beach Resort
h) Warehouses, Commissaries, etc.
Camel Warehouse
Andok's South Warehouse and Commissary
i) BPOs and Offices
Sitel, Convergys, and Various Offices
PBCOM Offices
j) Power Stations
NGCP Quezon Province Station
k) Billboards
Sun Cellular, Bench, and San Miguel
l) Schools and Universities
UE Lualhati Engineering Building
m) Properties, Demolitions, and Egress
Transnational and CW Home Depot
n) Pavement, Roads, and Bridges
Legazpi to Sorsogon, Bicol
o) Land and Site Developments
Various Projects
p) Airports
New Manila International Airport
q) Office Furniture and Cabinets
Various Projects
r) Hospitals
Chinese General Hospital
s) Bored Piles
The City of Dreams and Ortigas Residential Building
t) Renovation and Extension of Buildings
Pfizer Account Office
Manila Water Engineering Office
u) Fish Ports
Navotas and Iloilo Fish Ports
4) Telecommunication End2End and Data Center: 11 years and 3 months
5) Health, Safety and Environment (3 years)
6) Space Planner: 1 year and 2 months
7) Site Acquisition Works and Permitting for 3 Years
PROJECT HANDLED: NEW MANILA INTERNATIONAL AIRPORT
PROJECT HANDLED:
Residences of Galleon: Post-Tension Project, 58-Storey Building
Chinese General Hospital Garden Suites (Beam-Free Stress)
National Project Manager/Acting Project Director:
Support/Secondary Micromanagement:
PROJECTS HANDLED:
1) UE Engineering Building.
2) NGCP Quezon Province , Power Sub Station
Client: CW HOME DEPOT, Makati Branch
As a property manager ,
As a project manager,
PROJECTS HANDLED:
1) SHOPWISE SUPERMARKET SAN FERNANDO,
2) SHOPPWISE SUPERMARKET GUA‑GUA
3) SHOPWISE SUPERMARKET EXPRESS FRIENDSHIP CLARK
4) SHOPWISE SUPERMARKET MALOLOS
PROJECTS HANDLED: BEACH RESORT: 8HECTARS LAS CABANAS
Assigned/Handled Projects:
Fit-outs, Cabinets and Interior Furniture
PROJECTS HANDLED:
1) TAKE OUT AND RESTAURANT ANDOKS LITSON OUTLETA
2) BATANGAS 2ND WAREHOUSE AND COMMISSARY 7 HECTARS STATION
PROJECTS HANDLED:
1) HIGH-END RESIDENCE HOUSES
2) BPO OFFICES
3) OFFICES RENOVATION
Handling: East and South Area from Center of Tabuk Project: Mobility (CME Telecom) Agency: EUROSEARH UK
AutoCAD Design Operator, Document Control and Site Land Surveyor & Estimator
1) Designation: AutoCAD Operator
♦ created drawings for civil and electrical details.
2) Designation: Document Control
♦ managed the issuance of document numbers and correspondence control reference numbers.
♦ Maintained a master list and master file of all original documents.
♦ Administratively checked the quality of document packages for accuracy and consistency.
♦ Oversaw the production, issuance, and distribution of documents.
♦ Monitored daily updates of the documentation database (e.g., the submittal life cycle).
♦ Prepared and provided document submittal status reports to clients, consultants, and individual package owners.
♦ Interfaced with clients, consultants, and package owners regarding documentation issues as they arose.
♦ Performed miscellaneous job-related duties as necessary.
3) Designation: Site Land Surveyor & Estimator
♦ Determined the exact locations for GSM and microwave antennas and equipment shelters at proposed cell sites.
♦ Assessed the feasibility of constructing STC cell sites at proposed locations.
♦ Investigated and determined if existing buildings could structurally support additional loads.
♦ Measured and determined the exact dimensions of building features such as parapets, slabs, beams, and columns for structural analysis.
♦ Requested as-built drawings from building owners for accurate design of tower base frames and computation of structural stability.
♦ Informed building owners and administrators in advance or during site visits.
♦ Prepared all technical and commercial documents, including as-built plans and structural computations.
♦ conducted independent site surveys and investigations when necessary.
♦ Prepared estimates and conducted surveys to determine materials, labor, and equipment needed for changes/extra work, and prepared quantity take-offs for estimating purposes.
♦ Designed access roads.
Word Processing: Expert
Project Planning, Scheduling & Control (PRIMAVERA)
New Technologies, ancient civilization, history, sport minded, music, guitar and dancing
RESUME OBJECTIVE:
I am seeking a challenging role in a forward-thinking company where my skills and experience can be effectively utilized. I have a proven track record of success working with cross-functional teams and aspire to bring project management excellence to ABC Corp, utilizing my organizational abilities to implement time-saving strategies for executives.
Executive Master in Disaster Risk and Crisis Management
Leadership Acceleration Program (LEAP)
Water Treatment Construction and System
Project Planning, Scheduling & Control (PRIMAVERA)
Tremble 2004 GARMIN TOTAL STATION
Staad Pro 2004 (Structural)