Summary
Overview
Work History
Education
Skills
Timeline
Rowena Caliao

Rowena Caliao

Project Engineer
Dasmarinas Cavite

Summary

Detail-oriented, organized and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Hardworking and passionate job seeker with strong organizational skills eager to secure engineering position. Ready to help team achieve company goals. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

14
14
years of professional experience

Work History

Project In Charge Engineer

Green Chameleon Construction Corporation
09.2018 - Current
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Determined and scheduled priorities as required to progress engineering work.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Delivered concise instructions to technical team to maintain quality control.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Analyzed system development efforts using potential ROI and associated liability figures.
  • Performed constructability reviews of construction bid documents for coordination purposes.
  • Assisted with cost proposal development and customer presentations.
  • Delivered regular compliance reports to drive process improvement and corrective measures.

Project In-Charge Engineer

Maxilite International Construction Corporation
02.2012 - 05.2017
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Captured technical schematics for use in project planning and execution.
  • Coordinated sampling and analysis tasks to verify quality of finished products.
  • Interacted with subject matter experts to develop training material and tools for personnel.
  • Tested and analyzed equipment design and performance feasibility to determine potential ROI.
  • Performed preventative maintenance to keep tools and equipment functional.
  • Developed cost estimates and project specifications for proposals.
  • Prepared action plans for problematic processes and assets.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Illustrated potential obstacles when conducting site assessments for planned projects.
  • Wrote, reviewed and edited technical document in accordance with template requirements.

Site Engineer - Plumbing /Sanitary Engineer

Irvine Construction Corporation
06.2011 - 01.2013
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Oversaw quality control and health and safety matters for construction teams.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Developed safety awareness program consisting of construction safety audits and safety meetings.
  • Gathered data, incorporating into drawings, schematics and maps.
  • Compiled and presented reports explaining project details to non-technical stakeholders.
  • Applied engineering principles to troubleshooting and followed up on defined corrective actions to prevent reoccurrences.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Acted as contact for client's communication with field personnel.
  • Facilitated construction by mapping out utility installations and establishing reference points, grades and elevations.
  • Supervised various municipal works and modernization projects and performed line and grade surveys.

Assistant Engineer- Microsystem

Advance Microsystem Corporation
01.2010 - 05.2011
  • Determined budget, manpower, schedule and material needed to successfully execute projects.
  • Adhered to timelines to meet quality assurance targets.
  • Assisted in development, design and execution of projects.
  • Provided technical assistance to staff when needed.
  • Assessed scope and requirements to assist with project design determinations.
  • Collaborated with senior engineers on projects and offered insight.
  • Shadowed designers and engineers to learn ways to implement methodologies.
  • Participated in failure analysis and debugging report activities.

Education

Bachelor of Science - Computer Engineering

University of The East, Samson Road, Caloocan City, Philippines
04.2001 -

Skills

undefined

Timeline

Project In Charge Engineer - Green Chameleon Construction Corporation
09.2018 - Current
Project In-Charge Engineer - Maxilite International Construction Corporation
02.2012 - 05.2017
Site Engineer - Plumbing /Sanitary Engineer - Irvine Construction Corporation
06.2011 - 01.2013
Assistant Engineer- Microsystem - Advance Microsystem Corporation
01.2010 - 05.2011
University of The East - Bachelor of Science, Computer Engineering
04.2001 -
Rowena CaliaoProject Engineer