Summary
Overview
Work History
Education
Skills
Work Preference
Work Availability
Affiliations
Certification
Interests
Timeline
Generic
Roberto Razo

Roberto Razo

Project Manager
San Fernando,Pampanga

Summary

.

Seasoned Specialist offering 35 years of comprehensive Project Management experience in Geothermal, Solar & Wind, interpreting and implementing Engineering & QA/QC quality assurance standards and investigating customer complaints and non-conformance issues. Practiced and knowledgeable professional possessing excellent problem solving and analytical skills paired with strong knowledge of international standards such as ASME, ANSI, BSI, JIS, AWS, ASHRAE, & QA terms, tools and methodologies. Committed to improving overall business processes. Dependable Project Manager with track record of success in field, attention to detail and proactive mindset. Seeks opportunities to improve processes and workflows for team benefit. Conscientious, hardworking and excels at multitasking in fast-paced environments.

Overview

32
32
years of professional experience
3
3
Language

Work History

Experience Project Manager

Aecom
Jakarta
12.2020 - 12.2023
  • Built and established strong partnerships with teams, vendors, and contractors
  • Created project plans with established timelines, assigned to appropriate teams, and managed workflow throughout construction
  • Led meetings with internal team members, consultants, and contractors
  • Forecasted, scheduled, and monitored project timelines, personnel performance, and cost efficiency
  • Developed solutions to project risks and issues, meeting quality and timeline goals and objectives
  • Managed contracts with vendors and suppliers by assigning tasks and communicating expected deliverables
  • Identified needs and coordinated resource allocation to deliver quality standards on time and within budget
  • Conducted periodic inspections of job sites for quality and progress
  • Created team objectives and roles with specific goals outlined for each individual
  • Prepared cost estimates for projects of varying sizes
  • Drove continuous improvement of the project delivery process by providing strong leadership
  • Made changes to project scope and cost and implemented the most effective change management processes to keep the project up-to-date
  • Reviewed project risks and devised proactive strategies to avoid potential roadblocks
  • Generated and tracked change orders and other contractual modifications affecting budget and schedule
  • Modified project plans when needed to better align with organizational objectives
  • Focused on project monitoring and management by developing forecasts and tracking expenses
  • Drafted project construction schedule and updated as the job progressed
  • Furnished project updates to various stakeholders, informing them of strategy, adjustments, and progress
  • Determined project staffing needs and led resource management
  • Reviewed budget and subcontractor estimates in detail and analyzed them for accuracy with the scope of work relevancy in mind.

Project Manager

SGC Power Consulting
12.2017 - 12.2022
  • Review the Contractor's detailed project control program based on the Critical Path Method (CPM) together with bar charts, curves, and detailed reports of critical activities, percentage completion, interface points, etc for the design, procurement, and construction of the civil, mechanical, and electrical works
  • Prepare and continuously review the Project Risk management and Project Execution plans
  • Assist the client in identifying risks in earlier phases of the project cycle and defining risk mitigation measures
  • Coordinate work on activities to be undertaken by Client including approval of all engineering and design-related construction
  • This includes design review for all Contract Lots
  • Review and approve Lot I steam field Contractor's site construction drawings, facilitate site discussions with the Contractor on the IFC drawings as submitted, and make appropriate changes where necessary to suit site construction
  • Review and approve the Contractor's design information, drawings, calculations, and reports for compliance with Specifications, codes, and standards, and sound engineering practice for the Power Plant EPC Contract Review and approve the Contractor's design information, drawings, calculations, and reports for compliance with Specifications, codes and standards, and sound engineering practice for the High Voltage Substation and Transmission contract
  • Assist, support, co-ordinate, supervise, make decisions, and issue instructions for all engineering and design related to the construction activities to ensure compliance with required specifications, quality assurance, to ensure and the safety of the project
  • Provide suitably qualified site staff to supervise the construction, installation, testing, and commissioning of the works and approve performance tests including the pressure testing of vessels
  • Examination and \approval of the contractors' design proposals for compliance with various contracts and specifications, to ensure compatibility with an interface between various contracts
  • The site staff should be able on their own to undertake design reviews and make changes as necessary to suit site construction conditions for all the Contracts
  • In addition, provide qualified staff to provide environmental support and administration roles including safety supervision and Contract Administration
  • Examine and approve the contractor's design information, drawings, and reports for compliance with specifications, codes, standards, and sound engineering practices
  • Examine and approve the contractor's energy efficiency strategy including proposed specifications, codes, and standards to ensure it conforms to best engineering practice
  • Coordinate energy efficiency studies and audits as necessary and ensure that suitable reports are produced
  • Give all necessary instructions to the contractor, provided the SGC shall not without prior approval of the Client give any instructions which in the opinion of SGC are likely to substantially increase the cost of, or delay the completion of the works
  • Inspect and witness acceptance testing during the manufacture of electrical, mechanical machinery, process equipment, and plant before supply for incorporation in the works
  • Ensuring that relevant and adequate operation and maintenance training programs for client staff are carried out at the manufacturers' factory
  • Monitor the progress of the project and update implementation schedules
  • Therefore, update costs, and project cash flow requirements and prepare reports to clients at regular intervals in agreed formats
  • Prepare monthly, quarterly, and annual or other regular reports as required by clients, Financiers, and other stakeholders
  • Hold regular meetings with the Employer and contractors to review the implementation progress
  • Prepare and distribute minutes of such meetings
  • Upon evidence of possible or impeding negative impact on project schedule, cost, integrity, quality, and progress, propose and implement remedial measures in consultation with the client as necessary
  • Identify opportunities for contractor's claims against client and take immediate remedial action to forestall such claims
  • Report the same to the client
  • Receive and verify the Contractor's invoices, issue certificates for payment according to the conditions of the contract for works, and advise the client when payments are due
  • Prepare change orders/variations and evaluate claims, if any, by the provisions of the contract
  • Arrange for delivery to the client on completion of the works such records as as-built drawings, manufacturers' manuals, and O&M instructions as are necessary to enable the client to operate and maintain the facilities
  • Ensuring that relevant and adequate operation and maintenance training programs for client staff are carried out at the site
  • Provide both site and home office-based staff during the 12-month plant guarantee period to meet client requirements
  • After the works, issue Takeover Certificates and Project Completion Reports
  • Provide clients with relevant technical and financial reports, which may be required from time to time
  • Assess the adequacy of spares and consumables provided by the contractors to support the project operation of the steam fields, the power plants, the substations, and the transmission systems
  • Assess the adequacy of training materials and time prepared by the Contractors to enable the operations and maintenance staff to take over and safely operate the Steamfields, Power plants, substation, and HV transmission line
  • Establishment, review, and update of the project management system, including Risk Management and HAZOP study, and procedures to monitor and control the cost and schedule to enable timely corrective measures
  • Arrange for the orderly and timely transfer of all intellectual property accruing from the project to the client who remains the owner of the same and retains the right to use it at will without further reference to any party except where specifically agreed
  • This will include design data, calculations, reports; drawings and their basis; etc
  • The property will be provided in both hard and soft (in CD) format
  • Coordinate and ensure smooth the formal takeover of the project by the Operations and Maintenance staff
  • Assist the client in the Preparation of various reports as may be required by Financiers and other stakeholders during all phases of the Project
  • Managed contracts with vendors and suppliers by assigning tasks and communicating expected deliverables
  • Identified needs and coordinated resource allocation to deliver quality standards on time and within budget
  • Conducted periodic inspections of job sites for quality and progress
  • Created team objectives and roles with specific goals outlined for each individual
  • Drove continuous improvement of the project delivery process by providing strong leadership
  • Made changes to project scope and cost and implemented the most effective change management processes to keep the project up-to-date
  • Focused on project monitoring and management by developing forecasts and tracking expenses
  • Furnished project updates to various stakeholders, informing them on strategy, adjustments, and progress
  • Determined project staffing needs and led resource management
  • Drafted project construction schedule and updated as the job progressed
  • Reviewed budget and subcontractor estimates in detail and analyzed them for accuracy with the scope of work relevancy in mind
  • Built and established strong partnerships with teams, vendors, and contractors.

Project Manager

Solar Renewables, SGC - Garissa County
03.2015 - 08.2017
  • Manage the project team for the Engineering Design, Procurement, Construction, Testing, and Commissioning of the plant
  • Hands-on experience in Land Acquisition activities such as carrying out site feasibility studies, identifying and selecting the most optimum site for project installation, understanding the Land due diligence process, familiarity with land acquisition policy framework including land-ceiling acts, conversion to non-agricultural use, forest land approval process, etc
  • Providing engineering support for PV solar-specific engineering issues and value engineering opportunities based on the project-specific risk profile
  • Manage and control all technical issues of minutes of meetings and agreements between the EPC Contractor, Project Team Members, Participants, and the customer as well as technical consultants and authorities
  • Vast Experience in managing various types of Permits, Licenses, and Approvals (PLAs) required for setting up, construction, and commissioning of a Renewable energy project and Ensuring proper quality control and cost of all engineering activities including Engineering subcontractors
  • Lead and provide technical inputs to site selection assessment, feasibility studies, FEED, tender preparation, and negotiation for Owner's Engineer projects
  • Provide support for technical issues linked to overall schedule problems and define appropriate activities for a recovery plan with respective lead engineers
  • Manage the Project Engineering team including Internal partners, and engineering subcontractors, so that the design is according to the applicable rules, regulations codes, and standards and according to good engineering practice as well as about Environmental aspects and Health and Safety of the Site Personal, Operators, maintenance personnel, and third parties
  • Manage the delivery of solar PV owner's engineer and advisory consultancy projects for clients and ensure they are delivered on time and budget and to a high level of quality
  • Generated and tracked change orders and other contractual modifications affecting budget and schedule.

Project Manager

Indonesia Power
Jakarta
12.2014 - 03.2015
  • Identified needs and coordinated resource allocation to deliver quality standards on time and within budget
  • Spearheaded the inspection and assessment of damaged major equipment and auxiliaries in the Power Plant
  • Recommend to the Owner rehabilitation strategy, develop engineering solutions and prepare the necessary engineering design and drawings, prepare the tender documents
  • Manage the project team for the Engineering Design, Procurement, Construction, Testing, and Commissioning of the plant
  • Manage and control all technical issues of minutes of meetings and agreements between the EPC Contractor, Project Team Members, Participants, and the customer as well as technical consultants and authorities
  • Ensure proper quality control of all engineering activities incl
  • Engineering subcontractors
  • Provide support for technical issues linked to overall schedule problems and define appropriate activities for a recovery plan with respective lead engineers
  • Provide support for technical issues linked to overall schedule problems and define appropriate activities for a recovery plan with respective lead engineers
  • Manage the Project Engineering team incl
  • Internal partners, and engineering subcontractors so that the design is according to the applicable rules, regulations codes, and standards and according to good engineering practice as well as about Environmental aspects and Health & Safety of the Site Personal, Operators, maintenance personnel and third parties
  • Created team objectives and roles with specific goals outlined for each individual.

Project Manager/Power Generation Plant Manager

GDE
Bandung
03.2012 - 12.2014
  • Forecasted, scheduled, and monitored project timelines, personnel performance, and cost efficiency
  • Manage the take-over of the Project Engineering from the tender team
  • Review the technical contractual requirements analyze the standards and specifications and prepare a detailed engineering execution strategy
  • Manage the Project Engineering team incl
  • Internal partners, and engineering subcontractors, so that the design is according to the applicable rules, regulations codes, and standards and according to good engineering practice as well as about Environmental aspects and Health and safety of the Site personnel, Operators, maintenance personnel and third parties
  • Ensure the fulfillment of the technical contractual requirements, including the project requirements for standards and specifications, documentation considering commitments to the Customer, site, and Partners, etc
  • Manage and control all technical issues of minutes of meetings and agreements between the Partners, Participants, and the customer as well as technical consultants and other authorities
  • Report the engineering project status according to the established requirements
  • Define the engineering strategies for contract fulfillment in line with the project strategy
  • Raise in due time deviation requests to the contractual requirements to achieve or improve cost and schedule and associated risks
  • Perform technical risk assessment and corresponding risk reviews
  • Responsible for the engineering budget including cost of subcontracted design services
  • Support the project management to get milestone payments achieved
  • Ensure that the reference design is used to a maximum extent and approve deviations for the reference design respective tender design only after proper validation and after consultation with the PD
  • Prepare and control the planning and progress measurement for all engineering activities such as managing time and resources to ensure a properly engineered product from tenders development through project execution; support the preparation of a detailed engineering system schedule (STS); Monitor and report engineering expenditures
  • Ensure proper quality control of all engineering activities incl
  • Engineering subcontractors
  • Ensure that the engineering as well as the sequence of engineering is optimized with construction
  • Always optimize technical solutions, overall cost, and project schedule
  • Assess, approve, and expedite technical aspects of change orders
  • Control supplier selection process and support procurement in the negotiations with suppliers
  • Compile and check the project engineering file (PEF) and provide input to the project management file (PMF)
  • Drove continuous improvement of the project delivery process by providing strong leadership.

Service Group Manager

GHD Pty Ltd
Makati
03.2010 - 04.2012
  • Provided outstanding service to new and long-standing customers by attending closely to concerns and developing solutions
  • Prepare proposals for Renewable Energy such as hydro, wind, geothermal, and biomass power projects
  • Spearheaded design of major power plant equipment such as steam turbine generators, boilers, cooling towers, vacuum systems, cooling water systems, condensers, and other major power plant equipment
  • Conducts FEED and Detailed engineering design of various power projects such as hydro, biomass, coal-fired power plants, and geothermal power plants
  • Acted as lead owner engineer for the GPPPI 2x17.5 MW biomass power project in Mina Iloilo city
  • Feasibility and Prefeasibility Study of various Run Off river Mini-Hydro Power projects in the Philippines such as Upper and Lower Tumauini, Isabela of Quadriver Energy Corporation, Bubunawan 2 Run-of-River Hydroelectric Power Plant of First Gen Mindanao Hydro Power Corporation
  • Detailed Feasibility Study Cabulig Hydro Electric Power Project, Cagayan de Oro
  • Involved in the preparation of a detailed feasibility study for the proposed 8MW hydropower project which includes the design of hydraulic structures such as intake gates and trash racks
  • Provides detailed CAD drawings, consolidation of documents, and packaging of the study
  • Responded to phone and online customer service requests within designated turnaround time to improve customer satisfaction ratings.

Project Management Specialist (POWER)/Consultant

World Bank, Dili, Timor Leste
01.2008 - 02.2010

Project Management Specialist

  • Working with the long-term safeguard specialist, ensure all relevant environmental and social safeguard assessments and management/mitigation plans are prepared and implemented to the standard required by the Government and according to good international practices, including (a) preparing an annual matrix at the start of each year describing all safeguarding issues to be considered for each program/project in that year's work program, for sign-off by the team leader, (b) prepare scope of work and terms of reference for short-term safeguard specialists, (c) manage subsequent outsourcing of safeguard consultant services, and (d) manage the outsourcing of all subsequent safeguard implementation;
  • B.) Technical Adviser to Utility Board
  • Provide advice on the desirable technical knowledge and skills for Board Members Specify and establish systems and reporting requirements to monitor compliance of the management contractor and the Government on their respective technical obligations and responsibilities under the management contract
  • Provide advice to the utility board on the performance of each party against their respective technical obligations and responsibilities under the management contract, and in the case of the management contractor, assess and advise on the performance against the technical KPIs in the management contract (including the adequacy of the information systems for recording performance)
  • Advise the Utility Board on steps to remedy any failure by one of the parties to the contract to meet their respective obligations and responsibilities under the management contract Advise the Utility Board regarding power development plans, capex programs, and operational strategies prepared by the management contractor
  • Advise the Utility Board on the technical aspects of any changes to the management contractor proposed by the management contractor, the Government, or the Utility Board Advise the Utility Board in its overall oversight of the Utility.

Project Manager/Consultant

  • Aliambata Gas Seep Harvesting Project
  • Responsible for the procurement of works, goods, and services needed to implement the Gas Seep Harvesting Project
  • Coordinate and cooperate closely with the Energy Services Delivery Project (ESDP) Project Advisor and the National Directorate for Water & Energy Policy as well as the National Directorate for Corporate Services and EDTL for the Ministry of Natural Resources, Minerals and Energy Policy
  • Review designs and construction drawings and check if the proposed designs are adequate to meet the objectives
  • Assists in the evaluation of qualifications and/or proposals of consultants
  • This includes the establishment of adequate evaluation committees, collection of evaluation reports from the individual committee members, and organization of an evaluation meeting to discuss the individual evaluations and to come to a consensus evaluation
  • Preparation of evaluation report and obtaining the required approvals review installation submitted by the suppliers of works and goods
  • Witness the commissioning of installed equipment and confirm that systems work as specified
  • Address any problems according to the rules and procedures established for this
  • Prepare brief monthly progress reports for both the government and the World Bank
  • Prepare an end-of-assignment report, documenting activities, outputs, and outcomes.

Engineering Manager

SKM Philippines
05.2005 - 08.2007
  • Manage and supervise various local and international projects on Geothermal Power Plants
  • Design of various major facilities of geothermal power plants
  • Design of Material handling facilities for Coal, and minerals for Local and International Mining Industries
  • Project management, during construction of various projects in UPI (Chevron) in Tiwi and Makban Geothermal Power Plants such as MGES (condenser vacuum system) project, brine reinject ion line, steam line, pressure relief system, controls, and instrumentation system, 4160 medium voltage upgrade, steam/water separator, rock mufflers, silencers
  • Project Consultant of Kamojang IV 60 MW Geothermal Power Project in Indonesia
  • Involved in the preparation of a detailed feasibility study of the Catuiran Hydro Electric Power Project, Mindoro as a hydro design engineer
  • Design, recommended turbine size and type to be used on the project based on available water flow
  • Introduced development schemes to the proposed project
  • Provides schematic structural drawings of the powerhouse based on the turbines to be used
  • Assist in the recruitment of consultants for new project requirements
  • Prepare project management procedures
  • Prepare detailed engineering designs for new projects in refineries, power plants, industrial plants, hospitals, hotels, and various infrastructure projects
  • Continuously driving improvement of the team's capabilities in project management, official processes, and procedures
  • Actively implementing and setting up processes in projects to ensure optimal results
  • Verifying fulfillment of Project Managers, R&O management, process, and MIS reporting
  • Actively validating the internal process to onboard the projects into the development stage to bring it to ready to ready-to-build status and finally hand over the completed operational project to the Asset Management team
  • Commercial governance – project reviews, forecasting, and resource management to ensure excellence in project delivery
  • Reviewing the project portfolio in the country and presenting status and KPIs to the Steering Committee and the Leadership team
  • Support in the preparation of Energy tenders, bids, and pre-qualification questionnaires, providing methodology, resource estimates, and input to the program
  • Provide the Project Management/Project Development interface during due diligence of projects, whether from the buy-side, sell-side, or in financing situations, borrower-side
  • Seek out, identify, and evaluate new RE investment opportunities generated by local developers using strong local network relationships
  • Maintain an ongoing understanding of the overall energy market and utility and regulatory environment and analyze the impacts of market and regulatory changes on future business
  • Develop a network of professional relationships with regional & local developers and resources, as well as with relevant regulatory agencies and industry participants
  • Interaction with financial institutions and banks to fulfill the condition's precedent related to the disbursement of funds during the project execution phase
  • Review and provide inputs to term sheets and contracts, including agreements for development services, equipment supply, power purchase agreements (PPAs), leases, EPC contracts, and O&M agreements
  • Prepare project-specific elements of internal approval papers for presentation to the Board/Investment committee during the development and construction stage of projects

Project Manager

MW Mindoro Wind Farm, PNOC-EDC
Makati
03.2003 - 04.2005
  • Review and evaluate technical documentation, either related to wind turbine technology or other engineering-related workstreams
  • Support with the general design of wind farm projects and with Technical
  • Due Diligence activities
  • Assist the indigenous people community and provide them with a livelihood program in the form of maintaining a tree nursery and tree plantation
  • Assist with the drafting of the EPC Bid document to be distributed to the prospected Bidders
  • Provide a cost estimate for the EPC contract cost, capital, and O&M cost to the project
  • Manage the installation of the 2-wind mast or Meteorological towers (MET) equipped with anemometers, wind vanes, temperature, pressure, and relative humidity sensors for wind data gathering, wind flow modeling, wind data management, and wind resource assessment of the proposed site
  • Manage the Design and Construction of the Project site's temporary access road and temporary facilities and PNOC-EDC site office
  • Coordinate and manage the Right of Way negotiation to land owners affected by the transmission route and wind site development plan
  • Installation of a temporary 13.8 Kv distribution line to supply power requirements to the site office and construction site
  • Recruitment of several skilled and non-skilled workers within the project site area consisting of several barangays with coordination from the local government units
  • Attend barangay and municipal meetings whenever required by the Local
  • Government units to assist in the local and municipal programs and projects
  • Undertake energy and uncertainty production assessments for different layouts and turbine configurations, which might include site visits, wind and production data processing, quality checking, correlation analysis, wind flow and wake modeling, review of energy losses, statistical analysis, and reporting
  • Support technical, land acquisition, and permitting teams and workstreams by providing analyses and producing detailed reports that review the feasibility of sites for development, including the feasibility studies, layout optimization/micro siting, site meteorological measurements, shadow flicker assessment, noise modeling, and visual impact assessment optimization/micro siting, site meteorological measurements, shadow flicker assessment, noise modeling, and visual impact assessment

Project Manager

MW Burgos Wind Farm, PNOC-EDC
Makati
05.2001 - 04.2004
  • Manage the Design and Construction of the Project site access road and temporary facilities and PNOC-EDC site office
  • Manage the installation of the various wind masts or Meteorological towers equipped with anemometers, wind vanes, and sometimes temperature, pressure, and relative humidity sensors for the wind data gathering, wind flow modeling, wind data management, and wind resource assessment of the proposed sit
  • Manage the Right of Way negotiation to land owners affected by the transmission route and wind site development plan
  • Manage the installation of a 13.8 Kv distribution line to supply power requirements to the site office and construction site, nearby villages, and Barangay
  • Recruitment of several skilled and non-skilled workers within the project
  • Site area consisting of about 6 barangays with coordination from the local government units
  • Attend barangay and municipal meetings whenever required by the Local
  • Government units to assist in the local and municipal programs and projects
  • Undertake energy and uncertainty production assessments for different layouts and turbine configurations, which might include site visits, wind, and production data processing, quality checking, correlation analysis of wind flow and wake modeling, review of energy losses, statistical analysis, and reporting
  • Review and evaluate wind turbine models, and recommend optimal design/layout configurations aiming to minimize LCOE
  • Support technical, land acquisition, and permitting teams and workstreams by providing analyses and producing detailed reports that review the feasibility of sites for development, including feasibility studies, layout optimization/micro siting, site meteorological measurements, shadow flicker assessment, noise modeling, and visual impact assessment
  • Undertake technical analysis of data (including wind measurement or production data) to plan and manage wind measurement systems and campaigns; evaluate, rank, and recommend candidate sites for wind development; forecast future energy yield of wind farms for different scenarios; evaluate and recommend turbine models aiming to reduce LCOE for each project
  • It is expected that multiple projects will be handled simultaneously, with eventual site visits
  • Undertake site condition assessments for different turbine types which include the elements above but also a review of extreme wind speed, ambient, and wake-induced turbulence intensity, wind shear, and temperature range
  • Plan, recommend, monitor, and control wind measurement campaigns and systems, ensuring IEC compliance and/or good industry practice
  • Support technical, land acquisition, and permitting teams and workstreams by providing analyses and producing detailed reports that review the feasibility of sites for development, including the feasibility studies, layout optimization/micro siting, site meteorological measurements, shadow flicker assessment, noise modeling, and visual impact assessment
  • Review and evaluate technical documentation, either related to wind turbine technology or other engineering-related workstreams
  • Support with the general design of wind farm projects and with Technical Due Diligence activities
  • Produce written reports and other documentation and present them to the senior management or external stakeholders
  • Undertaking analysis of operating wind farm data sets to assess the performance of the wind farm and to identify opportunities for improvement
  • Assist with the coordination of technical activities and designs with personnel in other business units and departments within the local and regional offices;
  • Attend meetings with clients, consultants, and contractors to coordinate and supervise various wind-related activities;
  • Follow market trends, keeping up to date with the latest, state-of-the-art tools and techniques and industry best practices
  • Undertaking analysis of operating wind farm data sets to assess the performance of the wind farm and to identify opportunities for improvement
  • Organize social participation in the surrounding local community and coordinate with local government units regarding some community projects

Project Manager/Field Design Implementing Manager

PNOC-EDC
Makati
04.1992 - 03.2001
  • Responsible for overseeing the design of major geothermal facilities and equipment such as steam/water separators, 1st & 2nd flash vessels, water drums, brine pumps, steam turbine generating sets, safety relief devices, rock mufflers & diffusers, silencers, piping system, cooling tower, compressors, standby diesel generator sets, pressure vessels, heat exchangers, through conduit valves, HVAC of the control room, sprinkler system
  • Responsible for the construction implementation and headed the commissioning team for the start-up, flushing, testing, and commissioning of the various geothermal power plants:
  • Provide overall technical leadership and expertise in the detailed design and engineering of the power plant Ensuring that the contractor(s) provides all contract documents that are power plant engineering/design related
  • Provide information, procedures, and other support to expeditiously solve problems in the development of the detailed design of the power plant deliverables
  • Supervised the design, procurement, construction, testing, and commissioning of various major equipment and facilities such as Steam
  • Turbines, cooling towers, vacuum pumps, steam-water separators, scrubbers, 1st &2' flash vessels, water drums, silencers, brine diffusers, the piping system, safety devices, rotating equipment such as compressors, brine pumps

Education

Bachelor of Science - Mechanical Engineering

Holy Angel University
02.1977

Skills

  • Verbal and Written Communication
  • Performance Monitoring
  • Project Management
  • Work Planning and Prioritization
  • Vendor Selection
  • Technical Presentations
  • Documentation and Reporting
  • Productivity Improvement
  • Contract Negotiation Expertise
  • Vendor Sourcing
  • Document Management
  • Risk Management
  • Quality Assurance and Control
  • Safety Protocol
  • Quality Assurance

Work Preference

Work Type

Contract WorkFull Time

Work Location

HybridOn-Site

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Affiliations

· Think Geoenergy

Member · Jan 2015 - PresentMember · Jan 2015 - Present

· Renewable Energy

Member · Jan 2013 - PresentMember · Jan 2013 - Present

· Geothermal Energy

Member · Mar 2012 - PresentMember · Mar 2012 - Present

· Global Green Power Green Power PLC

Member · Jan 2010 - PresentMember · Jan 2010 - Present

· ADB Consultant

Member · Jan 2009 - PresentMember · Jan 2009 - Present

· Philippine Society of Mechanical Engineers

Director, Makati Chapter · Jun 1997 - PresentDirector, Makati Chapter · Jun 1997 - Present

· Geothermal Energy Association Member

· PMP Project Management Member -Jan 2016 – Present Member Jan 2016 – Present

· Think Geoenergy,

Certification

  • Licensed Mechanical Engineer - 1978
  • Trainings & Seminars
  • Project Management Certificate May 25-26 2006 SKM Geothermal
  • Corrosion Monitoring April 18, 1984 PNOC-EDC
  • Geothermal Wastewater Disposal Technology Feb29-March 2, 1988 Bechtel National Inc.
  • IRD Mechanalysis Vibration Technology Oct 9, 1981 IRD Mechanalysis Inc
  • H2S Abatement and Sulfur Recovery technology Sept 22, 2000 Eisenmann Corp.
  • Danflo Surge Control Valves technology July 18, 1989 Fisher-Oil Tools
  • Nash Hybrid Vacuum System Feb 11, 1993 Nash International Company
  • Computer Conciousness Seminar July 4-6, 1988 PNOC-EDC
  • Triflex March 31, 1995 Specialist Information System
  • Project Management workshop Certificate April 21-27, 2001 Kepner Trgoe/PNOC-EDC
  • Problem Solving & Decision Making June 13-28, 1993 PNOC-EDC
  • Crossby Relief Valves Aug 14, 1992 Crossby/PNOC-EDC
  • Rotork Controls and Instrumentation Jan 7-14, 1997 Rotork Singapore/PNOC
  • Gas & Arc Welding Seminar Jan 14-March 20, 1990 Welding Research and Training Institute
  • Triflex application to Static and Dynamic Analysis May 12-30, 2001 Specialist Information System
  • Rotork Valve Actuators March 7-14, 1997 Rotork Singapore/PNOC
  • ADL Pipeline and Ease 2 Oct 23, 2009 Specialist Information System
  • Rotork Electrical Actuators, Pakscan Master Station and Pakscan 2 wire Control System Jan 7-9, 1997
  • Rotork Singapore/PNOC Welding Inspection and Quality Control Jul 11-15,1983 Welding Industries of the Philippines

Interests

Renewable Energy

Climate Change

Carbon Capture

Timeline

Experience Project Manager

Aecom
12.2020 - 12.2023

Project Manager

SGC Power Consulting
12.2017 - 12.2022

Project Manager

Solar Renewables, SGC - Garissa County
03.2015 - 08.2017

Project Manager

Indonesia Power
12.2014 - 03.2015

Project Manager/Power Generation Plant Manager

GDE
03.2012 - 12.2014

Service Group Manager

GHD Pty Ltd
03.2010 - 04.2012

Project Management Specialist (POWER)/Consultant

World Bank, Dili, Timor Leste
01.2008 - 02.2010

Engineering Manager

SKM Philippines
05.2005 - 08.2007

Project Manager

MW Mindoro Wind Farm, PNOC-EDC
03.2003 - 04.2005

Project Manager

MW Burgos Wind Farm, PNOC-EDC
05.2001 - 04.2004

Project Manager/Field Design Implementing Manager

PNOC-EDC
04.1992 - 03.2001

Project Management Specialist

Project Manager/Consultant

Bachelor of Science - Mechanical Engineering

Holy Angel University
Roberto RazoProject Manager