Detail-oriented individual with exceptional communication and project management skills. Proven ability to handle multiple tasks effectively and efficiently in fast-paced environments. Recognized for taking proactive approach to identifying and addressing issues, with focus on optimizing processes and supporting team objectives.
· Received / check carefully if the materials are complete.
· Review the TSSR given by our SE.
· Survey the location of our scope of work like DCDU new AMB / 5G antenna booster.
·Install new DCDU, AMB, AAU to proper location.
· Power tapping the power cable of DCDU to Rectifier.
· Hot swap Eltek rectifier to Huawei Rectifier
·Integration Lnr2600
·.Labelling all Sector.
·Troubleshooting major alarms or Swap sector.
· ISDP QA/QC 5G wireless and Huawei Rectifier.
·.RPAT and PAT representative.
· Received / check carefully if the materials are complete.
· Review the TSSR given by our SE.
· Survey the location of of our scope of work like DCDU, AMB / 5G antenna booster.
·Install new DCDU, AMB, and AAU to proper location.
· Power tapping the power cable of DCDU to Rectifier.
· Hot swap Eltek rectifier to Huawei Rectifier
·Integration Lnr2600
·.Labelling all Sector
·Troubleshooting major alarms or Swap sector.
· Antenna swap to 12 port antenna to 8 port antenna.
· RRU swap - Nokia Equipment to Huawei Equipment
·Installation of DCDU, BBU from indoor.
· Power tapping from DCDU to Eltek Rectifier.
·Installation of RRU (RRU L850, L700, 2100, 1800, 900, 2300) from outdoor.
· Filter Installation 900 and L850.
·Diplexing high band and low band technology (L700 & L850, 1800 & 2100, 1800 & 2300).
· Swap Sector rectification.
·Troubleshooting / Alarm clearing all bands.
·Knowledgeable in USING Site master.
· Clean up/ Rectification. Rectify all punch list of site
· ISDP QC/QA for PrePAt and PAT acceptance.
·Documentation after ISDP QA/QC L1 Approoved.
-Refarming cut over and antenna swap to 8-port/ Quad port 2 port antenna
· RRH Installation (FRGY, FRCG, FHDB)
· Power tapping system module and rf module
· Diplexer installation lowband and high band
· Diplexing high band technology U2100 and G1800, L2100 and G1800 depending on G1800 trx configuration
· Diplexing low band technology GU900 and L850
· Labelling of all technology installed for easy tracking and troubleshooting by site owner
· Filter Installation for 900 and 850
· Swap Sector rectification
· IBS new site G1800 hardware installation system and rf module and integration, functionality test using android phone and old nokia device 3 sectors
· IBS new site U2100 hardware installation system and rf module and integration, functionality test using android phone and old nokia device 1 carrier per sector
· IBS new site L2100 hardware installation system and rf module and integration. Functionality test using laptop and android phone.
· G1800 (FXEA/FXEB), U2100 (FRGT), and GU900 (FXDA) RRU Relocation to outdoor (tower side)
· G1800 hardware expansion additional FXEB/FXEA
· U900 installation system module and rf module (FHDB), New U900 integration, U900 rf sharing with G900
· GU900 rf module swap from FXDA to FHDB
· U2100 and L2100 rf split/ standalone
· New L850 integration, L2100 and L850 common system
· Filter Installation 900 and L850.
·Troubleshooting / Alarm clearing all bands.
· (PAT)Taking site photos, getting modules serial numbers and sketch drawing of the site, Knowledgeable in USING Site master
· Clean up/ Rectification. Rectify all punch list of site
· Team Leader Huawei L700 Project.
· Using ISDP application (Android Phone)
· PrePat and PAT representative.