Summary
Overview
Work History
Education
Skills
Timeline
Rey Ryan Biong

Rey Ryan Biong

Construction Leadman
Medina

Summary

  • Highly experienced and knowledgeable individual in the field of 69kv and 13.2kv Distribution Lines as well as Under-Build and Open Secondary Lines for more than 20 years.
  • With an extreme desire to learn and grow, who will take on roles with proficiency and focus on productivity in a fast-paced environment.
  • Demonstrates work ethic, good communication skills and team player.
  • Able to cope with the physical demands of the role while adhering to the safety practices at work.
  • Can work flexi/overtime as the need arises;

Overview

23
23
years of professional experience

Work History

CONSTRUCTION LEADMAN (DX-Lines; 69kV,13.2kV&220V)

Misamis Oriental II Electric Service Cooperative, Inc. (MORESCO II)
Medina, Misamis Oriental
05.2013 - Current
  • Leads in Installing transmission and distribution lines between power plants and individual buildings or homes;
  • Leads in Digging trenches or climbing poles to repair or maintain underground and overhead electrical cables;
  • Prepares safely and accurately work sites with grounding tools; warning signs and secures working areas;
  • Leads in a team “Task Force” Power Restoration Rapid Deployment for the immediate restoration of power in the Province of Aklan and Two Towns of Antique after the onslaught of Typhoon Ursula;
  • Operate diggers, bucket trucks, hand tools near and around electrical distribution lines;
  • Install primary and secondary overhead and underground electrical systems;
  • Install and Banked Transformers (1Phase; V-Phase and 3Phase) on Pole or Pad with ratings from 10kva; 15kva; 25kva; 37.5kva; 50kva; 75kva and 100kva;
  • Coordinates with teammates in resolving various technical problems;
  • Submits weekly accomplishment report to the Direct Supervisor;

LINEMAN (Line Maintenance)

Misamis Oriental II Electric Service Cooperative, Inc. (MORESCO II)
Medina, Misamis Oriental
02.2001 - 05.2015
  • Responsible in maintaining efficient; effective and reliable Distribution Line;
  • Engage in 13.2kv Distribution Line constructions as well as trouble shooting;
  • Engage in Lateral Line construction as well as trouble shooting;
  • Engage in Digging, Pole Erection and Line Dressing;
  • Engage in KWHr Meter installations for new connections and replacements of defective KWHr Meter;
  • Engage in Clearing of Trees that disturb Distribution Lines;
  • Engage in maintaining Distribution Lines a safe and free from obstructions.
  • Accomplish assigned work orders involving line rehabilitation and maintenance for customer’s request;

Education

High School Diploma -

MEDINA NATIONAL COMPREHENSIVE HIGH SCHOOL, Medina, Misamis Oriental, Philippines
04.2001 -

Skills

Defensive Driving

undefined

Timeline

CONSTRUCTION LEADMAN (DX-Lines; 69kV,13.2kV&220V) - Misamis Oriental II Electric Service Cooperative, Inc. (MORESCO II)
05.2013 - Current
MEDINA NATIONAL COMPREHENSIVE HIGH SCHOOL - High School Diploma,
04.2001 -
LINEMAN (Line Maintenance) - Misamis Oriental II Electric Service Cooperative, Inc. (MORESCO II)
02.2001 - 05.2015
Rey Ryan BiongConstruction Leadman