Summary
Overview
Work History
Education
Skills
Training
Timeline
Generic
Renato Teoxon Pacistol

Renato Teoxon Pacistol

Cainta

Summary

Dedicated railway professional with

Dependable professional with strong background installing, maintaining, and repairing systems and components. Maintains equipment safety and performance with in-depth inspections and corrections. Dedicated to quality and always professional.

Overview

17
17
years of professional experience

Work History

Technician

Light Rail Transit Authority Line 2
Pasig City
09.2023 - Current
  • Perform the preventive and corrective maintenance activity of the Line 2 system
  • Good Housekeeping during the shift schedule
  • Attend to emergency calls through radio, telephone, cellphone, and other
  • Communicate on system and coordinate with the Leadman
  • Perform regular / daily monitoring, inspection and checking of assigned Line 2 systems

Locomotive Operator / Shunter

Ulrich Engineering & Railworks Pte Ltd
10.2020 - 02.2023

Locomotive Operator / Shunter

BCV Corporation Pte Ltd. (P-Way Trackworks Pte Ltd.)
10.2017 - 03.2020
  • Locomotive operation, reforming wagons and point throwing.
  • Loading, unloading and delivery of track work materials.
  • Continuous communication with trackwork duty controller and station supervisor for the safe passage within the railway environment.
  • Report any abnormalities of the equipment and other safety issues.
  • Operated various types of machinery, demonstrating versatility and adaptability in diverse work environments.

Works Train Station Supervisor

Gates PCM Construction Ltd
06.2016 - 01.2017
  • Control and monitor work party activities inside Defined area.
  • Conduct thorough inspection on station platform and track side.
  • Working closely with Person in-charge of the work party and duty controller.
  • Assist train movement and point throwing.
  • Ensuring safety inside the defined area in Mainline/TSA/Depot.

Locomotive Operator / Shunter

Gates PCM Construction Ltd
04.2015 - 06.2016
  • Operate the Locomotive safely in the Railway Environment.
  • Transport trackwork materials.
  • Work closely with the Duty Controller
  • Ensuring safety is given priority inside Railway Environment

Workstrain Operator/ Shunter

Gates PCM Construction Ltd
07.2014 - 03.2015
  • Locomotive operation, shunting, reforming wagons, pointing throwing.
  • Cable laying and cable pulling.
  • Working closely with the PICs and with cable laying crew, station supervisor and duty controller.

Train Driver A

Light Rail Transit Authority Line 1
Pasay City
04.2009 - 06.2014
  • Operate assigned trains as per timetable and instruction, observes all train signals and safety rules
  • Observe behavior of passengers aboard the train and ensure their compliance with rules and regulations
  • Reports all abnormalities observed on the terminal along revenue line to control center
  • Enhanced passenger safety through regular equipment inspections and adherence to safety protocols.

Education

Bachelor in Public Administration -

Pamantasan ng Lungsod ng Maynila
Manila City

Secondary Education -

Sacred Heart Academy
Garchitorena, Camarines Sur

Garchitorena Central School
Garchitorena, Camarines Sur

Skills

  • Timetable Management
  • Train Locomotive Operation
  • Teamwork
  • Collaborative Problem Solving
  • Decision - Making

Training

  • Non-Commercial Train Driving Program for Light Maintenance Section-MTT Rolling Stock Personnel, 09/23/24, 10/12/24
  • Hydrema 912 Road Rail Dumper Truck Retooling Course Program, 01/11/23
  • Secatol Concreting Rail Vehicle Operation Training Course, 01/15/29
  • WSQ Workplace Safety & Health Management In Construction Industry, 04/18/21
  • WSQ-Operate Lorry Crane Course, 12/11/19, 12/12/19
  • Quality Customer Service for Frontline Personnel (Delivering Great Customer Service), 11/11/13
  • CTCI Locomotive Operator/Shunter Course (CKG & Kt-23 Locomotive), 04/01/15, 04/30/15
  • Refresher Course on Intervention & Hauling Procedures, And Safety - Related Concerns for Operations Personnel, 04/16/13
  • Equip Million Leaders Mandate (Leadership, Teamwork and Stewardship), 04/30/12
  • Retooling Course Program Appreciation Course on ISO 9001 Quality Management System (QMS) And Reiteration Of Operations Guidelines and Procedure for Iso Compliance, 11/19/09
  • Line1 Train Driving Technical Training Program (BN/Acec, Adtranz & Kinki Sharyo Trains), 12/08/08, 02/13/09

Timeline

Technician

Light Rail Transit Authority Line 2
09.2023 - Current

Locomotive Operator / Shunter

Ulrich Engineering & Railworks Pte Ltd
10.2020 - 02.2023

Locomotive Operator / Shunter

BCV Corporation Pte Ltd. (P-Way Trackworks Pte Ltd.)
10.2017 - 03.2020

Works Train Station Supervisor

Gates PCM Construction Ltd
06.2016 - 01.2017

Locomotive Operator / Shunter

Gates PCM Construction Ltd
04.2015 - 06.2016

Workstrain Operator/ Shunter

Gates PCM Construction Ltd
07.2014 - 03.2015

Train Driver A

Light Rail Transit Authority Line 1
04.2009 - 06.2014

Bachelor in Public Administration -

Pamantasan ng Lungsod ng Maynila

Secondary Education -

Sacred Heart Academy

Garchitorena Central School
Renato Teoxon Pacistol