Licensed Civil Engineer with 6+ in total years of experience. 1 year as a Project in-charge of construction of a water park, 3+ years as a Site/QC Engineer in an IMS Accredited and AAA Category Construction Company classified by PCAB specializing in Land Development Works 2+ year as a Project Engineer for a refutable Developer in the philippines.
Project Handled:
1. Hillsview Royale Phase 5. A mass housing project (2511 socialized housing Units)
2. The Palm Residences Phase 1. A mass hosing project. (1352 economic housing units)
Project Handled:
1. Foressa Mountain Town Phase 1A and Lodge Project.
A residential mountain estate Development of Aboitizland located in Balamban Cebu.
2. Passibol Village 4 and Pasinaya Central. A mass housing project of Raemuland Corporation located in Naic Cavite.
Project Handled:
1. Aqua planet Entrance, phase 1 and phase 2.the largest waterpark in the philippines located in Clark pampanga.
Supervise and monitor field works, related to Land Development and housing project in Accordance to existing quality control plan of the project, Supervise field and laboratory testing such as Field Density Test Compressive Strength of concrete samples and rebar testing, Prepare accomplishment report, Assist the QC head to prepare Quality Control Plan and construction methodology of the project, Serve as the contractor representative during inspections with client representative, Documentation of construction activities, Monitor owner supplied materials (OSM) such as DSB, cement, etc. utilization during construction, Assist the Project In-charge to Secure Turnover and Certificate of Completion for every project finished. Possess a B.S. in Civil Engineering from a reputable State University. A good communicator. Takes work seriously and deliver my best consistently. Seeking a challenging career with a progressive organization that will provides an opportunity to leverage my expertise, abilities & competency., Supervise all existing projects, Schedule manpower and materials deliveries, Secure Turnover and Certificate of Completion for every project Finished