- Keep an eye on all relevant safety objectives and legal requirements
- Interpret clients’ requirements
- Identify engineering problems and ensure solutions are implemented
- Evaluate, organize and priorities workload within a schedule
- Liaise with third party contractors to ensure all equipment is fit for purpose
- Completes engineering projects by organizing and controlling project elements
- Develops project objectives by reviewing project proposals and plans and conferring with management
- Determines project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, and reviewing bids from contractors
- Determines project specifications by studying product design, customer requirements, and performance standards
- Completes technical studies and prepares cost estimates
- Confirms product performance by designing and conducting tests
- Determines project schedule by studying project plan and specifications, calculating time requirements, and sequencing project elements
- Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems
- Controls project plan by reviewing design, specifications, and plan, scheduling changes, and recommending actions
- Controls project costs by approving expenditures and administering contractor contracts
- Prepares project status reports by collecting, analyzing, and summarizing information and trends, recommending actions
- Maintains safe and clean working environment by enforcing procedures, rules, and regulations
- Maintains project database by writing computer programs, entering, and backing up data
- Maintains product and company reputation by complying with federal and state regulations
- Contributes to team effort by accomplishing related results as needed
MAJOR PROJECTS HANDLED- TIALOC:
1) Electrical & Mechanical
- PG8 Q3'18 LRP CAPACITY UPGRADE (CUB 1) 2019- 2020
- PG8 Q3'19 LRP PB & Oct'19 CR (CUB 2) 2020 - 2021
All the above projects were successfully handed over to customers (INTEL PG8) without any major escalations, violations, injuries, issues.
2)Aspen Glove Phase 1 (2021)
The scope was to carry out Test & Commission and prepare handover Doc.
- To perform Insulation Test, Continuity Test, Polarity Test this is to verify any wire or equipment faulty.
- To carry out simulation test on Gen Set for Power Failure (800KVA)
- Performs operational, preventive maintenance and checklist on all Plant facilities equipment & systems.
3) Sustion (Simmtech) Batu Kawan (2021)
The scope was to Hook up a total of 249 Tools at this new plant at Batu Kawan which need to run concurrently with Base Build Construction.
- To Prepare the hookup tools Schedule.
- Project duration is 3.5 Months start date 1st Jan2022 -18th April 2022
- To perform Insulation Test, Continuity Test, Polarity Test this is to verify any wire or equipment faulty.
4) AMS OSRAM KUL2 Kulim (2022 Present)
The scope was to installation few Package.
- Package F 23A DDUPS 2 unit 11KV
- Package M 66D 2 unit 11KV Genset
- Package F21 B Bus Duct Installation to support production at EPI L1 & FAB L2.
- Attending on line FAT for TX, Switch Gear, Genset .
- Delivery and arrange all the TX, Genset, DDUPS , Switch Gear and MSB
- To carry out Test & Commission and prepare handover Doc.