Prepare inspection requests for Mechanical components and submit them to the consultant
Install project mechanical equipment, such as cooling towers, tanks, and generators
Provide daily status reports to the Project Engineer while ensuring safety compliance
Prepare the Permit to Work (PTW) paperwork
Preparation and review of Job Safety Analysis.
Mechanical/Structural Supervisor
Daewoo E & C Co.
04.2007 - 01.2009
Requested RFIs, modification orders, and material receipts
Ensured that projects meet high-quality requirements by examining plans and specifications
Adhered to project timetables and plans while finishing work ahead of schedule
All project closeout documentation were submitted in accordance with the contract
Developed contract job task bundles and gathered quality assurance and control documents
Equipment and support were provided to construction professionals in order to carry out project plans.
Panel Inventory Controller
SCAD Services (S) Pte., Ltd
03.2005 - 07.2006
Assumed operational tasks as allocated by the Supervisor to guarantee smooth production
Manual labour was used to meet daily output targets
Weekly machine checkups and maintenance
Completed the designated tasks as instructed by the immediate superior
Additional duties were carried out when needed
Maintain inventory records, such as receiving reports, check sheets, and inspection records
Scanned and barcoded all entering and exiting items.
QA/QC Document Controller
Mohammad Al-Mojil Group
01.2003 - 03.2004
Log, transmit, and file communication data
Update computer monitoring programs
Copy and disseminate plans, data, reports, and processes
Issue and keep track of standard processes and standards
Create, file, and record project quality records
Copy and compile documents and data
Compile Certification Dossiers for customer transition after project completion
Prepare daily, weekly, and monthly Quality Statistical Reports as instructed by the QA/QC Supervisor/Manager to meet project objectives
Prepare daily, weekly, and monthly Quality Statistical Reports as instructed by the QA/QC Supervisor/Manager to meet project objectives
Monitoring construction activity helped to prioritize onsite worker safety
Quantities were tracked throughout the project to ensure they met production rates
Efficiently recorded and rejected improper material deliveries on site
Accurately reported project progress to management.
Education
BS in Electrical Engineering - undefined
Colegio dela Purisima Concepcion
Roxas City, Philippines
01.1995 - 04.2000
Skills
Material requisition
Accomplishments
Turnaround Project at Petro Rabigh Phase 1, Rabigh, K.S.A: Removal and installation of new vessels. Replacement of Tube Bundles, gate valves, and pipe spools. Vessel internal cleaning.
Petro-Rabigh Phase 2 Project, Rabigh, K.S.A: Installation of 3 units of Molten Salt Reactors. Installation of various vessels (with internals) and pumps.
Gas to Liquid Project at Oltin Yol, Uzbekistan: Installation of Reformer. Installation of various vessels (with internals) and pumps.
Ruwais Refinery West Restoration Project at ADNOC-Ruwais, UAE: Removal and installation of various vessels, motors, pumps, etc. Installation, repair, and cleaning of columns, vessels, towers, and internals.
QAFCO 5&6 Project at Qatar Fertilizer Company, Messaieed, Qatar: Installation of 36 units of back-to-back Induced Draft Closed Cooling Towers. Installation of various vessels (with internals) and pumps.
Organizationalaffiliations
Integrated Institute of Electrical Engineers (IIEE) - member
Philippine Society for Nondestructive Testing, Inc.