An experienced Mechanical Engineer with history of working in a non-stop cement manufacturing industry. With strong background on Maintenance Operations, Project Management and Implementation, Root Cause Analysis, Permit-to-work System and Safety Standards, System Organization and Management. Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in cement industry equipment maintenance and leadership role. Tolerant and flexible to different situations, decision making and critical thinking, self-motivated, initiative, high level of energy, responsible, organization and prioritization skills, competent verbal and communication skills, can work under pressure, willingness to improve and learn new things.
Front Line Leadership, Supervisory skills and Communication
undefined· Project In-charge: Haz-Waste Co-Processing Plant (Oil Sludge Feeding Facility) Erection to Commissioning (Lafarge Republic Inc.-Batangas, Philippines), July-October 2012
· Project In-charge/Supervisor: Installation Symmetro-Gearbox for 55Tph Cement Milling Line No.2 (Lafarge Republic Inc.-Batangas, Philippines)- August 2012
· Project In-Charge: Construction and Erection of Coal covered storage Facility wth capacity of 8000 m3, (Lafarge Republic Inc.-Batangas Plant) April-Nov 2013
· Project In-charge: 3x Replacement of Kiln Shell Segment of Rotary Kiln dia. 4.2m with a Clinker Capacity of 3200 TPD, (Republic Cement and Building Materials Inc.), Batangas, Philippines
1. 15.2meter Length shell mid-segment including Girth Gear installation-.July 2013
2. 4.5 meter-Length kiln shell inlet section including feed-end seal assembly-August 2017
3. 2 meter –length kiln shell outlet section including outlet seal assembly-October 2019
· Project In-charge/Supervisor: Upgrade of 4 Units Overhead Crane (2-17T and 2-10T) - Conversion from Hydraulic Controlled Grabbing into Mechanical Clamshell, Crab assembly and upgrade of controls (17T)-2014 - Conversion of Lattice Type Girder crane into Box Girder and end Carriage upgrade (2-10T) - 2015 - Upgrade of End Carriage and control, cabin and electricals (17T) – 2013
· Project In-charge: Upgrade Compressed air System loop of Pyro-processing line and Coal Plant and integrate 3 unit of new compressors (2-90KW and 75KW) with dryer and receiving tank , (Republic Cement and Building Materials Inc.), Batangas, Philippines– 2014
· Project In-charge: Upgrade of Compressed air System loop of Cement Milling line and integrate1 unit of new compressor(132KW) with dryer and receiving tank, (Republic Cement and Building Materials Inc.), Batangas, Philippines– 2014
· Project Incharge/Supervisor: Cement packing plant upgrade and automatic Palletizer Integration, (Republic Cement and Building Materials Inc.), Batangas, Philippines- 2014
· Project In-Charge Optimization and Upgrade of Industrial Water System network into Close-Loop system to optimize and conserve water usage (Raw Milling process, Pyroprocess and Coal Plant) , (Republic Cement and Building Materials Inc.), Batangas, Philippines- 2015
· Contributor and team member of Republic Cement Capacity Upgrade Project from 3200TPD to 3600TPD capacity upgrade, (Republic Cement and Building Materials Inc.), Batangas, Philippines-October 2018- January 2019
· Lead Execution Manager in Annual plant turn-around with consistent record of high as 96%-100% completion rate of Planned Projects and Mechanical Maintenance Activities within prescribe schedule, (Republic Cement and Building Materials Inc), Btangas Philippines, 2018-2023