Experienced in conducting precise site surveys and data analysis. Broad experience in using surveying tools and software to enhance project accuracy and efficiency. Knowledge of regulatory safety compliance and communication skills to ensure smooth project execution.
Overview
29
29
years of professional experience
1
1
Certification
Work History
Sr. Project Surveyor
HK Airfield Lighting Limited
02.2023 - 11.2024
Establish horizontal and vertical control points by TS traverse and digital leveling on designated areas to be use as references during installations of AGL’s (Airfield Ground Lightings) base cans, mid cans and other airfield facilities on runway and taxiways.
Set out and mark locations of AGL for excavation and installation using GPS.
Set out reference marks by TS to be use as stations for installation of AGL’s underground base cans and mid cans on runway and taxiways.
Pre and post concrete survey set out orientation and elevation of installed AGL’s underground base cans using Topcon robotic total station and digital level.
Chief Surveyor
Sumitomo Mitsui Construction Co., Ltd.
05.2019 - 02.2023
Establish main horizontal and vertical control points and markers by GPS static survey, TS traverse and digital leveling throughout the 14 kilometer elevated rail line and stations to be use as references in the subsequent phase of construction.
Identify site boundaries and ROW for construction alignments by GPS using primary control network as reference.
Execute survey works for the construction of 14 hectare area that will serve as production and fabrication site of precast segments, batching plants, site offices, stock yard and other temporary facilities.
Pre and post clearing and grubbing topographic survey throughout the whole rail line construction site.
Horizontal and vertical alignments survey check of structures from bored pile casting to sub structure formworks installation prior to concreting.
Execute main control quarterly monitoring by GPS static and digital leveling survey.
Surveyor
Engineering Surveys Limited
06.2013 - 07.2016
Operate on a daily basis multiple surveying instruments in setting out horizontal and vertical alignment of underground train station structures and utilities from rock excavation to structural formworks installation.
Topographic survey of underground areas to be drilled and be blasted during excavation process.
Execute underground rock profile surveys prior to excavation.
As-built surveys of tunnel and underground concrete structures as per engineer’s request.
Download survey data’s to computer and process daily survey reports.
Land Surveyor
Malphrus TCI Limited
06.2007 - 11.2010
Setting out the horizontal alignment and vertical profile of 5700 foot paved Jet Strip using GPS, Automatic Level and Laser.
Layout and staking out roads horizontal and vertical alignment, location of fire hydrants, transformers, electrical and communication vaults, flushing connections, gate valves, lot corners, driveways and other underground utilities connecting to various home sites.
Determine the precise geographic locations of existing underground water supply, sewer and irrigation systems, electrical and communication conduits, pipe fittings, gate valves and other utilities using GPS.
As built surveys of roads, installed underground utilities, pipe fittings, gate valves and other structures related to water supply, sewer, irrigation, electrical and communication systems using GPS.
Coordinate with the consultant survey engineers and conduct field surveys where alignments, distances, elevations, angles and contours are to be implemented on site during construction.
Land Surveyor
Arabtec Construction L.L.C.
07.2004 - 07.2006
Establish horizontal and vertical survey control points throughout the project site to be use as references in setting out the raft foundations, columns, beams, core wall, slabs, utilities and other structures of the building.
Compute and prepare all survey data’s to be implemented at the field based on approved plans.
Set the massive foundation alignment of the building and assist in the excavation to attain the desired depth and size of the foundation.
Setting out horizontal and vertical alignment of raft foundation, core walls, columns, slabs and beams prior to formworks installation.
As built survey of all core walls, columns, slabs and beams. Monitor the raft foundation settlement and column shortening.
Technical Executive (Survey Department)
Jurong Town Corporation
07.1998 - 07.2002
Supervise and carry out joint surveys to insure that all engineering, land and hydrographic surveys for reclamation project are completed efficiently and effectively.
Processing, checking, filing and updating of plans, survey documents and reports submitted by the contractor from the surveys.
Calibrate and maintain survey equipment.
Do survey computations.
Accomplish and compile the Survey Department monthly progress report by the end of each month.
Perform other technical functions in support of civil engineering activities.
Instrumentman
D.M. Consunji, Inc.
09.1995 - 07.1998
Establish horizontal and vertical control points throughout the project site using Total Station and Automatic Level.
Prepare all necessary survey data’s to be implemented at the field.
Computations of survey data’s based on approvedplans.
Construction layouts and monitoring of coordinates.
Execute routine engineering and topographical surveys.
Relocating missing boundary markers installed by geodetic surveyor.
Conduct field surveys and operate survey instruments and computer equipment.
Sales General Manager (Greater China) at Eluomeng HK Limited (Element 14 HK)Sales General Manager (Greater China) at Eluomeng HK Limited (Element 14 HK)
Marketing Manager at Forton Enterprises Limited (Vinda Paper Industrial (HK) Co Limited)Marketing Manager at Forton Enterprises Limited (Vinda Paper Industrial (HK) Co Limited)