Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Additional Information
Languages
Work Availability
Timeline
Generic
Marichelle S. Casado

Marichelle S. Casado

Cebu City, Cebu,CEB

Summary

I am a global Filipino professional with 20+ years of proven expertise in architecture, interior fit-out, technical coordination, and construction execution, delivering successful projects across diverse sectors and international markets.

Throughout my career, I have consistently transformed complex concepts into seamless, on-time, and high-quality outcomes by leading multidisciplinary teams, ensuring compliance with industry standards, and streamlining operations for maximum efficiency. My strong foundation in construction project management allows me to set ambitious yet achievable goals, provide clear guidance, and resolve challenges proactively to keep projects on track.

Passionate about quality, collaboration, and operational excellence, I bring a results-driven, solutions-oriented approach that aligns with organizational objectives and delivers measurable impact for clients and stakeholders.

Overview

23
23
years of professional experience
2
2

Licensure

23
23

Certification

Work History

Design Technical Head - Regional Design Manager

SM Prime Holdings
Philippines
09.2021 - Current

Provide regional technical leadership and engineering governance for civil and architectural works across SM Supermalls in the Visayas, ensuring infrastructure safety, operational efficiency, and compliance with engineering standards.

Key Responsibilities

  • Lead technical governance for civil and architectural engineering works across regional mall assets
  • Oversee planning, review, and implementation of CapEx and OpEx infrastructure projects
  • Provide engineering evaluation for leasing requests and tenant fit-out works
  • Lead technical assessment and resolution of structural, architectural, and infrastructure concerns
  • Coordinate with Mall Operations, consultants, contractors, and regulatory agencies for project execution and compliance
  • Contribute to engineering standards, infrastructure resilience strategies, and technical governance initiatives
  • Corporate Leadership Roles
  • Technical Head – Disaster Response Initiatives
  • Provide engineering leadership for disaster preparedness, structural assessments, and recovery strategies for all malls affected by typhoons, flooding, and seismic events.
  • Technical Head – Roof Management Committee (RMC)
  • Lead engineering oversight and technical governance for roof system integrity across more than 90 SM Supermalls nationwide, supporting long-term infrastructure reliability and preventive maintenance planning.

Property and Asset Manager

Jones Lang Lasalle (JLL)
Philippines
01.2020 - 07.2021
Key Responsibilities & Achievements
  • Delivered end-to-end property management services, ensuring smooth daily operations, 24/7 emergency response readiness, and year-round facility reliability.
  • Tracked and reported weekly target accomplishments against overall project and operational schedules, supporting performance transparency and client alignment.
  • Managed common area and building maintenance, addressing tenant concerns and service requests promptly to maintain high occupancy satisfaction.
  • Implemented and enforced House Rules, policies, and administrative guidelines in compliance with client approvals and regulatory requirements.
  • Ensured full compliance with statutory regulations, permits, licenses, and occupational health, safety, and security standards through regular audits and reporting.
  • Developed and executed emergency response plans, mitigating operational risks and ensuring business continuity during critical incidents.
  • Led predictive and preventive maintenance programs, improving equipment reliability and coordinating engineering solutions with service providers.
  • Supported major corrective works and improvement projects through technical evaluation, coordination, and execution oversight.
  • Prepared and managed annual operating expense (OPEX) and capital expenditure (CAPEX) budgets to support efficient property operations.
  • Oversaw monthly billings for association dues, utilities, and assessments, and processed vendor payments with complete documentation and approvals.
  • Acted as managing agent for outsourced services including security, housekeeping, landscaping, and pest control; monitored performance and contract compliance.
  • Maintained strong tenant relationships, ensuring adherence to building rules while promoting a safe, well-managed, and professionally operated property environment.

Snr. Project Manager

Euro Towers International Inc.
Philippines
01.2018 - 12.2019

Key Responsibilities & Achievements

  • Led cross-functional coordination with internal departments, consultants, contractors, and external stakeholders to ensure smooth daily operations and timely project delivery.
  • Planned, organized, led, and controlled all project phases to meet approved scope, schedule, budget, quality, and safety requirements.
  • Established realistic project goals, milestones, and execution strategies aligned with business and client objectives.
  • Directed, coached, and mentored project engineers and site supervisors, improving clarity of roles, accountability, and overall team performance.
  • Monitored project progress through regular reviews, proactively identifying risks, issues, and deviations, and implementing corrective actions to achieve targets.
  • Developed and executed effective internal communication strategies to ensure alignment across all management levels and project teams.
  • Implemented best practices, standardized workflows, and quality controls to improve efficiency, consistency, and execution outcomes.
  • Evaluated existing processes, procedures, and performance metrics; provided data-driven recommendations for continuous improvement.
  • Collaborated with senior leaders on project implementation guidelines, manpower planning, and resource allocation to support delivery requirements.
  • Managed and evaluated external service providers and contractors, including scope development and negotiation of terms to ensure value, compliance, and performance.
  • Exercised independent judgment and discretion in matters of significance, balancing risk, cost, quality, and schedule to protect project and organizational interests.

Local Project:

  • Vivaldi Residences

Technical Group Head

Filinvest Land Inc.
Mindanao, Philippines
01.2017 - 12.2017

Key Responsibilities & Achievements

  • Led cross-functional coordination across departments to ensure smooth daily operations and uninterrupted project execution.
  • Acted as primary liaison with external stakeholders, consultants, and contractors on critical project deliverables.
  • Provided clear direction to project engineers-in-charge and supervisors on targets, schedules, and performance expectations.
  • Motivated, coached, and guided teams; assigned tasks aligned with individual skills to maximize productivity and accountability.
  • Monitored daily actual progress versus targets, proactively identifying gaps, risks, and corrective actions.
  • Drove achievement of KPIs across PSQDCE (People, Safety, Quality, Delivery, Cost, Environment/Equipment) standards and procedures.
  • Ensured timely completion of all assigned tasks while maintaining required quality, safety, and cost controls.
  • Set realistic and practical project goals aligned with execution capacity and business objectives.
  • Developed and implemented effective internal communication strategies to ensure alignment across all management levels.
  • Established tools and performance evaluation methods to track individual and team effectiveness.
  • Built, standardized, and enforced best practices to improve consistency, efficiency, and execution quality.
  • Reviewed processes, procedures, and performance metrics; provided data-driven recommendations for continuous improvement.
  • Collaborated with leadership on implementation strategies, manpower planning, and resource allocation.
  • Evaluated and managed external service providers and contractors, including scope development and negotiation of commercial terms.
  • Exercised independent judgment and discretion in matters of significance affecting project delivery, risk, and outcomes.

Local Projects Handled:

  • 8 Spatial Davao, Ma-a
  • The Veranda (Luxury Resort Condominium), Kembali Coast, Kaputian, Samal Island
  • Centro Spatial, Bolton Extension
  • One Oasis Davao, Ecoland
  • Maldives Oasis, CM Recto St., Talomo

Fit-out Manager

Austal
Australia
05.2015 - 12.2016

Key Responsibilities & Achievements

  • Led cross-functional coordination to ensure smooth daily operations and uninterrupted fit-out execution.
  • Acted as primary liaison with external stakeholders, suppliers, and service providers on critical fit-out deliverables.
  • Coordinated directly with the General Manager on production issues, progress updates, and resolution of constraints.
  • Provided clear direction to supervisors on deadlines, production targets, and quality expectations.
  • Prepared detailed material take-offs, build plans, and fit-out schedules aligned with overall project timelines.
  • Planned and optimized manpower requirements in line with build sequencing and productivity targets.
  • Managed efficient budget allocation and implemented value engineering initiatives to control costs without compromising quality.
  • Generated daily and weekly production targets, resource plans, and detailed schedules to support on-time delivery.
  • Motivated, coached, and communicated with site teams to drive performance and accountability.
  • Conducted training for tradespersons and apprentices to improve workmanship, safety, and productivity.
  • Assigned tasks and monitored outputs to ensure goals were consistently achieved.

International Project:

  • ADNOC High-Speed Catamaran Vessel (2 units, 57-meter length)

Snr. Architectural Head

Datem Incorporated
Manila, Philippines
02.2014 - 05.2015

Key Responsibilities & Achievements

  • Led, developed, and coordinated architectural teams throughout all project phases, ensuring alignment from design development to site execution.
  • Liaised closely with design consultants, subcontractors, suppliers, clients, and project teams to resolve technical and coordination issues efficiently.
  • Ensured all architectural works were executed in strict compliance with approved drawings, specifications, safety standards, and project schedules.
  • Conducted design content reviews, technical specification checks, and buildability assessments to optimize constructability and quality.
  • Managed architectural documentation, drawing control, and information distribution to maintain accuracy and version integrity.
  • Coordinated with consultants on technical clarifications and design resolutions to support uninterrupted construction progress.
  • Enforced safe construction practices and high-quality workmanship across all architectural works.
  • Generated daily and weekly production targets, resource plans, and detailed schedules aligned with the overall project program.
  • Supported site teams in resolving design-related issues and provided on-site architectural supervision and guidance.
  • Implemented value engineering initiatives to improve cost efficiency without compromising design intent or quality.

Local Projects:

  • Savoy Hotel, Boracay
  • Belmont Hotel, Boracay

Design Engineering Manager

Depa Ltd
United Arab Emirates
12.2011 - 12.2013

Key Responsibilities & Achievements

  • Led and coordinated multidisciplinary design-engineering teams throughout all project phases, from concept review to site execution.
  • Acted as primary liaison with design consultants, subcontractors, suppliers, client teams, and project staff to ensure design alignment and timely approvals.
  • Reviewed interior design concepts and performed design content checks, technical specification reviews, and constructability/buildability assessments.
  • Checked and approved CAD designers’ drawings and subcontractors’ shop drawings prior to consultant submission.
  • Coordinated closely with subcontractors and suppliers, ensuring production strictly followed approved drawings, samples, and specifications.
  • Worked with structural, MEPF, and other trades to develop coordinated working drawings for site implementation.
  • Managed material sample submissions, ensuring compliance with drawings, specifications, and approval requirements with complete documentation.
  • Supported site teams in resolving design-related issues, providing practical, cost-effective technical solutions.
  • Maintained drawing registers, shop drawing logs, and approval trackers to ensure program compliance.
  • Prepared and monitored impact logs arising from RFIs, IRs, shop drawing comments, material approvals, and client correspondences.
  • Conducted site evaluations against as-built drawings, investigated technical issues, and recommended viable engineering solutions.
  • Organized and facilitated design and technical workshops as required to resolve coordination challenges and drive decisions.

Iconic International Landmark Projects:

  • Qasr Al Watan Presidential Palace, Abu Dhabi
  • Baku Flame Towers (Fairmont Hotel), Azerbaijan
  • Blue Diamond Hotel, Luanda
  • Regent Emirates Pearl Hotel (Grand Hyatt), Abu Dhabi

Head Architect - Coordinator

Shimizu Corporation
Singapore
09.2010 - 11.2011

Key Responsibilities & Achievements

  • Led architectural planning, design coordination, and document control across all project stages, ensuring accuracy, compliance, and timely approvals.
  • Managed architectural and finishing submissions, including shop drawings, material samples, technical submissions, and RFIs; tracked approval status and consultant responses.
  • Ensured all works were executed in strict accordance with approved drawings, specifications, and project schedules.
  • Prepared and maintained detailed schedules for architectural and finishing drawing submissions to support construction sequencing.
  • Reviewed and checked architectural, finishing, and shop drawings for quality, constructability, and coordination prior to issuance.
  • Led, developed, and coordinated project teams throughout the full delivery cycle, providing clear direction and technical guidance.
  • Liaised closely with design consultants, subcontractors, suppliers, client teams, and project staff to resolve design and site coordination issues.
  • Conducted site supervision to ensure design intent, workmanship quality, and compliance with approved documents.

International Projects – High-End Residential Developments

  • Urban Resort Condominium, Singapore – 2 Towers (18 & 20 storeys)
  • Urban Suites Condominium, Singapore – 3 Towers (20 storeys)

Snr. Project Manager-Coordinator & Mktg Consultant

GTH Engineering & Construction Pte Ltd
Singapore
08.2007 - 08.2010

Key Responsibilities & Achievements

  • Established and maintained strong coordination with clients, architects, consultants, main and sub-contractors, suppliers, engineers, site supervisors, and field teams to ensure seamless project execution.
  • Reviewed architectural, structural, and subcontractor quotations to ensure technical compliance and support subcontract award decisions.
  • Ensured all works were executed in strict accordance with approved drawings, specifications, safety standards, and project schedules.
  • Liaised with consultants for technical clarifications and design resolutions to support uninterrupted construction progress.
  • Enforced safe construction practices and quality workmanship through regular site supervision and coordination.
  • Supervised site activities and workforce deployment to meet productivity and delivery targets.
  • Performed end-to-end project management functions, including coordination, monitoring, reporting, and issue resolution.
  • Supported marketing and logistics activities related to project delivery and procurement.
  • Prepared progress claims, progress reports, and tender documentation for ongoing and new projects.
  • Designed and prepared shop drawings and as-built drawings to support construction accuracy and project close-out.

International Projects:

  • Marina Bay Sands Integrated Resort
    - Event Plaza
    - Lower & Upper Promenade
    - SkyPark Infinity Pool
    - ArtScience Museum
    - Hotel & Casino
  • Marina Bay Waterfront Promenade (Urban Redevelopment Authority)
  • 2-Storey Detached Dwelling House with Swimming Pool – 47 Merryn Road
  • 2-Storey Detached Dwelling House with Attic, Basement & Swimming Pool – 4 Tai Yuan Heights
  • 3-Storey Detached Dwelling House with Swimming Pool – 16 Lewis Road
  • 5-Storey Light Industrial Factory Complex – Serangoon North Ave 5 & 6
  • Toa Payoh Methodist Church

Architectural Designer - Coordinator

Architects Espina, Perez-Espina & Associates (AEPEA)
Manila, Philippines
06.2005 - 07.2007

Key Responsibilities & Achievements

  • Architectural design, planning and initial structural coordination.
  • Preparation of contract documents, specifications, BOQs, cost estimates and bidding documents.
  • Technical studies, pre-design analysis and project proposal support.
  • Architectural drafting and MEPF, utilities and lighting coordination using AutoCAD.
  • Field supervision to ensure design compliance and quality standards.
  • Project management, scheduling and coordination.
  • Interior design, space planning and landscaping concepts.
  • Establish professional rapport and maintain coordination with clients, contractors and suppliers.

Local Projects:

  • 3BR Condominium Unit Renovation, Pacific Place, Ortigas Center, Pasig City, Manila
  • Beneficial PNB Bldg Renovation, Davao City, Davao
  • Condominium Unit Renovation, Parc Chateau, Ortigas Center, Pasig City, Manila
  • SOS Children’s Village, Calbayog City, Samar
  • 3-Storey Residential Bldg. (Balisado Residence), Portofino Heights, Bacoor, Cavite
  • Mid-Rise Condo/Commercial Complex, Brgy. Kapiligan, Quezon City, Manila
  • Warehouse Building, Malolos, Bulacan
  • New Hope Foundation Church, Cainta, Rizal
  • Kamay Kainan Restaurant, Las Piñas, Laguna
  • Positano Clubhouse, Davao
  • V.M. Potenciano Medical Center Renovation, 163 EDSA, Mandaluyong City, Manila
  • ABRIO Subdivision, Ayala Land Inc.(Hardscape), Santa Rosa, Laguna
  • Sulpicio Parking Structure, Binondo, Manila
  • 3-Storey Residential Building, Phase 10, Ma. Luisa Estate Park, Busay, Cebu City, Cebu
  • 4-Storey Residential/Commercial Bldg., Salinas Drive, Lahug, Cebu City, Cebu
  • La Nueva Supermarket, Lapu-Lapu City, Mactan Is., Cebu 5-Storey Condotelle, Salinas Drive, Lahug, Cebu City, Cebu

Technical Coordinator

POIEL Engineering & Management Services
Cebu, Philippines
03.2003 - 05.2005

Key Responsibilities & Achievements

  • Preparation of contract documents, procurement and bidding requirements, design reports and CLUPs (Comprehensive Land Use Plan).
  • Development of technical, economic, and financial feasibility studies and project promotionals.
  • Preparation and layout of technical and construction working drawings using AutoCAD.
  • Preparation of digitized maps using AutoCAD and Arcview.
  • Establish professional rapport and maintain coordination with clients and contractors.
  • Conduct field surveys and site assessments.
  • Space planning and layout coordination.

Local Projects:

  • 3BR Condominium Unit Renovation, Pacific Place, Ortigas Center, Pasig City, Manila
  • Detailed Engineering Design & Construction Supervision of:

- Tago Municipal Water System Tago, Surigao del Sur

- Libagon Municipal Water System Libagon, Southern Leyte

  • San Isidro Public Market, San Isidro, Leyte
  • Salcedo Municipal Water System Economic & Financial Feasibility Study Salcedo, Samar
  • Basay Municipal Water System Bidding Documents, Economic & Financial Feasibility Study Basay, Negros Oriental
  • DAI/EcoGov Conversion of Thematic Maps of Selected LGUs (Local Government Units) in Central Visayas into Digital Files (DENR Project)

Education

Bachelor of Science - Architecture

University of San Carlos
Cebu City, Province Of Cebu, Philippines
10-2004

Master of Science - Construction Management

Polytechnic University of The Philippines - Open University
Manila, Metro Manila, Philippines

J.D. - Law

University of Southern Philippines Foundation
Cebu City, Province Of Cebu, Philippines
2030

Skills

  • Regional Engineering Leadership
  • Infrastructure Governance & Asset Sustainability
  • Disaster Recovery & Infrastructure Resilience
  • CapEx & OpEx Infrastructure Management
  • Structural & Architectural Technical Oversight
  • Engineering Risk Assessment & Decision Support
  • Cross-Functional Stakeholder Leadership

Accomplishments

  • Rapid Disaster Recovery – Typhoon Odette
  • Led engineering recovery operations for SM City Consolacion following severe flash flooding caused by Typhoon Tino.
  • Through coordinated engineering mobilization and restoration planning, successfully reopened the mall within 10 days, surpassing the previous internal recovery benchmark achieved during the reopening of SM City Naga.
  • This achievement was recognized across EDD Operations as a benchmark for rapid disaster recovery and operational resilience.
  • Organizational Leadership – Strengthening EDD–Mall Operations Collaboration
  • Reformed the working relationship between Visayas Design Operations and Mall Operations, bridging operational gaps and establishing stronger collaboration between engineering and operational teams.
  • Internal customer feedback recognized this impact: “The Technical Head / RDM reformed the Visayas Design Operations, bridging the gap between EDD and Mall Operations and strengthening collaboration across teams.”
  • Performance Recognition
  • Consistently received “Exceptional” Key Performance Indicator (KPI) ratings for four consecutive years for leadership impact in engineering governance, operational collaboration, and infrastructure resilience.

Certification

Architecture Licensure Examination Passer/Registered & Licensed Architect (RLA)
Professional Regulation Commission (PRC)
Issued: July 2016

Master Plumber Licensure Examination Passer/Registered MP
Professional Regulation Commission (PRC)
Issued: March 2007

Construction Safety Course for Project Managers (Certification) Accredited by the Commissioner, Ministry of Manpower
Venue: SCAL Academy (Singapore Contractors Association Ltd)
Issued: December 2008

Problem Solving & Decision Making
Guthrie-Jensen Consultants
Issued: April 2017

Pollution Control Officer
Environmental Counselors Inc.
Issued: February 2021

Writing Formal Business Letters and Emails
Project Management Institute
Issued: October 2020

Business Writing Principles
LinkedIn
Issued: October 2020

Grammar Foundations
Project Management Institute
Issued: September 2020

Lean Six Sigma Yellow Belt
SM EDD (Engineering, Design and Development)
Issued: October 2024

- Finding your Time Management Style
- Productivity Tips: Finding your Productivity Mindset
- Adopting the Habit of Elite Performers
- The Six Morning Habits of High Performers
- Effective Collaboration Across Teams
- Essentials of Team Collaboration
- Creating Winning Teams
- How to Beat Burnout, Exhaustion and Stress
- Stop Stressing and Keep Moving Forward
- Overcoming Overwhelm

LinkedIn
Issued: March 2024

- Focus on What Matters and Minimize Distraction
- How to Manage Your Attention and Your Priorities
- Effortless: Make It Easy to Do What Matters (Book Bite)
- Tranquility by Tuesday: 9 Ways to Make Time for What Matters (Book Bite)
- Start More Than You Can Finish: A Creative Permission Slip (Book Bite)

LinkedIn
Issued: February 2024

Situational Leadership Training
SM EDD (Engineering, Design and Development)

Issued: August 2025

Additional Information

Skills:
• Proficient in Verbal & Written English Communications
• Effective Communicator with the ability to read, analyze, interpret and prepare:
- policies
- procedures and other business practices
- guidelines and documents
• Technically sound, Commercially & Contractually aware
• Customer Service
• Proficient in Microsoft Office
• Microsoft Project
• AutoCAD
• Arcview (Geographic Information System)
• IMOS
• Photoshop

Personal Traits & Attitude Towards Work:
• Passion for continuous learning and personal growth
• Extremely Hard Working & Team player
• Self-starter and Energetic
• Sociable & has Determined demeanor
• Strive for continuous excellence in quality work performance
• Successfully handled projects from start to finish

Demographics:
Date of Birth: April 29, 1981
Place of Birth: Cebu City, Cebu, Philippines

Languages

English
Bilingual or Proficient (C2)
Tagalog
Upper intermediate (B2)

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Design Technical Head - Regional Design Manager

SM Prime Holdings
09.2021 - Current

Property and Asset Manager

Jones Lang Lasalle (JLL)
01.2020 - 07.2021

Snr. Project Manager

Euro Towers International Inc.
01.2018 - 12.2019

Technical Group Head

Filinvest Land Inc.
01.2017 - 12.2017

Fit-out Manager

Austal
05.2015 - 12.2016

Snr. Architectural Head

Datem Incorporated
02.2014 - 05.2015

Design Engineering Manager

Depa Ltd
12.2011 - 12.2013

Head Architect - Coordinator

Shimizu Corporation
09.2010 - 11.2011

Snr. Project Manager-Coordinator & Mktg Consultant

GTH Engineering & Construction Pte Ltd
08.2007 - 08.2010

Architectural Designer - Coordinator

Architects Espina, Perez-Espina & Associates (AEPEA)
06.2005 - 07.2007

Technical Coordinator

POIEL Engineering & Management Services
03.2003 - 05.2005

Bachelor of Science - Architecture

University of San Carlos

Master of Science - Construction Management

Polytechnic University of The Philippines - Open University

J.D. - Law

University of Southern Philippines Foundation
Marichelle S. Casado