Electrician
Power Mechanical Marine Works
02.2025 - 09.2025
Chipping works for switches, outlet and f-das
Lay-out and installation of imc pipes for lightings, fire exit and f-das at substation and transformers area.
Wiring of lightings at Genset bldg. And the substation
Cable pulling from main post to substation (MVSG) to transformers 80mm² xlpe
Cable pulling at transformers to Genset bldg to MCC room 250mm² (trenches)
Testing and Megger of cablewire 250mm² to transformers, Genset bldg and MCC room.
Lay-out and installations for lightings and fire alarm at chlorine dosing room.
ReInstallation and fabrication works of cable tray ladder and perforated cable tray at MCC room at trench.
Fabrication installation of support at pumping station.
Installation of lightings fixture, switches and power outlet device at substation room.
Project: Levi Mariano pumping station and reservoir prjct.
Electrician/Terminator
First Delta Dynamic Const. corp
09.2024 - 02.2025
Termination works at MCC panel motor and control with drawing schedule as per basis.
Termination on LCP panel and control for motor and pump with a drawing schedule as per basis
Cable testing.
Termination works on blower at NST
Termination works on LCP panel for MOV. With a drawing schedule.
Installation of flexible LQt from cable tray to LCP panel.
Termination works at NST MCC room.
Termination work s on PLC panel Coagulation tank mixer B, C, D.
Distribution board for secondary treatment north, Distribution board for valves return and excess sludges pump motorized valved north A and B, Distribution board for valves - NV- Disinfection for gates, LCS- P 307 a&b refuse water pump 52.2kw 460v, LCS - P mix 361 - 1 B&C floculation tank mixer b - 37kw 460v, LCS - P mix 361 -1 A, floculation tank mixer, LCS - P mix 362 , A coaculation tank mixer 11kw 460v, LCS - P 374 , disinfection sampling pump 15kw 460v, LCS - P 611, pac loading pump 7.5kw 460v, Instruments, Testing and continuity or line cheking, cable pulling
Project: CAMANA Maynilad Water Reclamation Facilities
Electrician
EEI CORP.
09.2023 - 07.2024
Installation of cable trays upper level and ground floor at E and C Bldg. Unit 3 as per drawing basis.
Installation of impulse tubing through end bearing at GTG unit 3 (LUBE OIL) and fabrication of support.
Installation impulse tubing through burner (from fuel/water injection skid) at GTG Unit 3 and drawing review for basis.
Fabrication of support
Installation and fabrication of impulse tubing and support from transmitter w/ box enclosure at STG and HRSG/Unit 1,2,&3
Modification of tubing at GTG through burner at unit 1.
Modification of tubing (from transmitter HI and LO at auxiliary boiler unit 1.
Installation of tubing at CCW unit 2 and 3.
Installation of tubing from ammonia dosing skid to HRSG unit 2&3.
Project: Batangas Combined Cycle Power Plant 3x425 MW
Electrician
IPM
05.2022 - 02.2023
Genset operator on/off
Repair the line trouble at site
Operation maintenance at site
Logbook report written
Check and verify the unload deliveries of materials (received and issuance)
Inventory of materials
Participation segregation of garbage and cleaning promoting environment protection.
Cable pulling / cable dressing to pipe rack A-J. and substation.
Installation and fabrication of cable tray
Fabrication of support (Grinding and cutting)
Project: UGCC Ethylene plant project.
Electrician
JONG-HAP E&M LTD.
06.2012 - 06.2013
Rough – ins layout of RSC pipe above ceiling for lighting's only
Chipping works of power, data and tel.
Installation of MDP panel and panel boards lights fixtures wiring devices tel and data
Wiring and rewiring all lighting and power
Termination of panel.
Project: Shuweihat S3 ipp project
Contact person: Dominador delos Reyes
Electrician
CONTRACTING &CONSTRUCTION ENT. LTD.
10.2009 - 11.2011
Cable pulling and back filling at (SATORP Accommodation Camp).
Assist to the Q/C Engr. for checking isolation testing and read by using megger the cable
Assist on termination of MDP/SMDP and transformer at (Satorp Camp).
Wiring and installation of fire alarm, fire alarm devices and FACPS
Project: Jubail export refinery project.
Electrician
ROMAGO INC.
05.2006 - 03.2007
Rough- in layout (floor and above ceiling) for lightings, power, cctv, tel and data as per drawing plan basis.
Installation of cable tray in accordance or drawing plan.
Wiring of lightings, power, tel and data
Installation of lightings fixtures and power outlet devices, switch device
Fabrication of cable tray off-set
Termination works on panel boards connect the.
Project: Genpact 4,5&6 flr, diamond care solutions, Club-Tropicana.
Education
undefined
Asian Institute or Maritime Studies
01.1998
Skills
Cable installation
Electrical wiring
Circuit termination
Cable pulling
Panel installation
Lighting installation
PERSONAL INFORMATION
Date of Birth: March 27, 1976 Place of Birth: Solano-Nueva Vizcaya Civil Status: Married to Genalyn B. Celeste Age: 49 Height: 5’4” ½ Weight: 55kls. Religion: Roman Catholic I hereby certify that the above information is true and correct to the best of my knowledge and belief Marcelo C. David