Summary
Overview
Work History
Education
Skills
PERSONAL INFORMATION
Timeline
Generic
Marcelo C. David

Marcelo C. David

Electrician
Solano

Summary

Through are my experiences I am confidently to fulfill the job enthusiasm.

Overview

19
19
years of professional experience
1
1
Language

Work History

Electrician

Power Mechanical Marine Works
02.2025 - 09.2025
  • Chipping works for switches, outlet and f-das
  • Lay-out and installation of imc pipes for lightings, fire exit and f-das at substation and transformers area.
  • Wiring of lightings at Genset bldg. And the substation
  • Cable pulling from main post to substation (MVSG) to transformers 80mm² xlpe
  • Cable pulling at transformers to Genset bldg to MCC room 250mm² (trenches)
  • Testing and Megger of cablewire 250mm² to transformers, Genset bldg and MCC room.
  • Lay-out and installations for lightings and fire alarm at chlorine dosing room.
  • ReInstallation and fabrication works of cable tray ladder and perforated cable tray at MCC room at trench.
  • Fabrication installation of support at pumping station.
  • Installation of lightings fixture, switches and power outlet device at substation room.
  • Project: Levi Mariano pumping station and reservoir prjct.

Electrician/Terminator

First Delta Dynamic Const. corp
09.2024 - 02.2025
  • Termination works at MCC panel motor and control with drawing schedule as per basis.
  • Termination on LCP panel and control for motor and pump with a drawing schedule as per basis
  • Cable testing.
  • Termination works on blower at NST
  • Termination works on LCP panel for MOV. With a drawing schedule.
  • Installation of flexible LQt from cable tray to LCP panel.
  • Termination works at NST MCC room.
  • Termination work s on PLC panel Coagulation tank mixer B, C, D.
  • Distribution board for secondary treatment north, Distribution board for valves return and excess sludges pump motorized valved north A and B, Distribution board for valves - NV- Disinfection for gates, LCS- P 307 a&b refuse water pump 52.2kw 460v, LCS - P mix 361 - 1 B&C floculation tank mixer b - 37kw 460v, LCS - P mix 361 -1 A, floculation tank mixer, LCS - P mix 362 , A coaculation tank mixer 11kw 460v, LCS - P 374 , disinfection sampling pump 15kw 460v, LCS - P 611, pac loading pump 7.5kw 460v, Instruments, Testing and continuity or line cheking, cable pulling
  • Project: CAMANA Maynilad Water Reclamation Facilities

Electrician

EEI CORP.
09.2023 - 07.2024
  • Installation of cable trays upper level and ground floor at E and C Bldg. Unit 3 as per drawing basis.
  • Installation of impulse tubing through end bearing at GTG unit 3 (LUBE OIL) and fabrication of support.
  • Installation impulse tubing through burner (from fuel/water injection skid) at GTG Unit 3 and drawing review for basis.
  • Fabrication of support
  • Installation and fabrication of impulse tubing and support from transmitter w/ box enclosure at STG and HRSG/Unit 1,2,&3
  • Modification of tubing at GTG through burner at unit 1.
  • Modification of tubing (from transmitter HI and LO at auxiliary boiler unit 1.
  • Installation of tubing at CCW unit 2 and 3.
  • Installation of tubing from ammonia dosing skid to HRSG unit 2&3.
  • Project: Batangas Combined Cycle Power Plant 3x425 MW

Electrician

IPM
05.2022 - 02.2023
  • Genset operator on/off
  • Repair the line trouble at site
  • Operation maintenance at site
  • Logbook report written
  • Check and verify the unload deliveries of materials (received and issuance)
  • Inventory of materials
  • Participation segregation of garbage and cleaning promoting environment protection.
  • Project: 952 Umiray-Angat Transbasin Rehabilitation Prjct.

Electrician

PACIFIC INTL. INC.
02.2019 - 02.2021
  • Review the drawing plan or technical diagram.
  • Installation pf PVC pipes, J. box and utility box square box for lighting fire alarm, telephone and data CCTV
  • Chipping works wiring, box setting for power, tel and data.
  • Wiring and installation of lighting fixtures, power devices and fire alarm, tel and data and panel
  • Termination works on panel.
  • Grounding works (cap weld and burried grounding rog)
  • Project: Napa &P.N.A Bldg. and Pii warehouse extension

Electrician

IPM CONSTRUCTION DEVELOPMENT CORP.
02.2016 - 11.2018
  • Installation and assembled of circuit breakers and power breakers
  • Checking and rewiring the line trouble at site
  • Given drawing review and materials estimation
  • Lay-out if lightings and power for MWAS and military facilities bldg. Drawing issue as per guide.
  • Wiring of lightings and power
  • Installations of lightings fixture and wiring device such switches, outlet and panel boards.
  • Line checking (circuits) using multi tester analog.
  • Operations maintenance of all genset and submersible pump and hydro dynamo generator.
  • Project: 952 Umiray-Angat Transbasin Rehabilitation Prjct.

Electrician

DAESUN E & C CO. LTD.
09.2014 - 08.2015
  • Cable pulling / cable dressing to pipe rack A-J. and substation.
  • Installation and fabrication of cable tray
  • Fabrication of support (Grinding and cutting)
  • Project: UGCC Ethylene plant project.

Electrician

JONG-HAP E&M LTD.
06.2012 - 06.2013
  • Rough – ins layout of RSC pipe above ceiling for lighting's only
  • Chipping works of power, data and tel.
  • Installation of MDP panel and panel boards lights fixtures wiring devices tel and data
  • Wiring and rewiring all lighting and power
  • Termination of panel.
  • Project: Shuweihat S3 ipp project
  • Contact person: Dominador delos Reyes

Electrician

CONTRACTING &CONSTRUCTION ENT. LTD.
10.2009 - 11.2011
  • Cable pulling and back filling at (SATORP Accommodation Camp).
  • Assist to the Q/C Engr. for checking isolation testing and read by using megger the cable
  • Assist on termination of MDP/SMDP and transformer at (Satorp Camp).
  • Wiring and installation of fire alarm, fire alarm devices and FACPS
  • Project: Jubail export refinery project.

Electrician

ROMAGO INC.
05.2006 - 03.2007
  • Rough- in layout (floor and above ceiling) for lightings, power, cctv, tel and data as per drawing plan basis.
  • Installation of cable tray in accordance or drawing plan.
  • Wiring of lightings, power, tel and data
  • Installation of lightings fixtures and power outlet devices, switch device
  • Fabrication of cable tray off-set
  • Termination works on panel boards connect the.
  • Project: Genpact 4,5&6 flr, diamond care solutions, Club-Tropicana.

Education

undefined

Asian Institute or Maritime Studies
01.1998

Skills

Cable installation

Electrical wiring

Circuit termination

Cable pulling

Panel installation

Lighting installation

PERSONAL INFORMATION

Date of Birth: March 27, 1976 Place of Birth: Solano-Nueva Vizcaya Civil Status: Married to Genalyn B. Celeste Age: 49 Height: 5’4” ½ Weight: 55kls. Religion: Roman Catholic I hereby certify that the above information is true and correct to the best of my knowledge and belief Marcelo C. David

Timeline

Electrician

Power Mechanical Marine Works
02.2025 - 09.2025

Electrician/Terminator

First Delta Dynamic Const. corp
09.2024 - 02.2025

Electrician

EEI CORP.
09.2023 - 07.2024

Electrician

IPM
05.2022 - 02.2023

Electrician

PACIFIC INTL. INC.
02.2019 - 02.2021

Electrician

IPM CONSTRUCTION DEVELOPMENT CORP.
02.2016 - 11.2018

Electrician

DAESUN E & C CO. LTD.
09.2014 - 08.2015

Electrician

JONG-HAP E&M LTD.
06.2012 - 06.2013

Electrician

CONTRACTING &CONSTRUCTION ENT. LTD.
10.2009 - 11.2011

Electrician

ROMAGO INC.
05.2006 - 03.2007

undefined

Asian Institute or Maritime Studies
Marcelo C. DavidElectrician