Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Certification
Timeline
AssistantManager
Marcelino Bisco

Marcelino Bisco

Senior Manager
Taguig City

Summary

Encouraging manager and analytical problem-solver with talents for team building, leading and motivating, as well as excellent customer relations aptitude and relationship-building skills. Proficient in using independent decision-making skills and sound judgment to positively impact company success. Dedicated to applying training, monitoring and morale-building abilities to enhance employee engagement and boost performance. Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.

Overview

20
20
years of professional experience
9
9
years of post-secondary education
10
10
Certifications

Work History

Senior Manager

Trans-Tech Philippines Systems Corporation
Muntinlupa City
01.2022 - Current

Responsibilities:

• Deploy and manage the team to efficient use of customer support platforms.

• Manage national teams of management consultants focused on delivering data-driven insight, authoritative guidance, and tailored executive support.

• Develop an internal scorecard to help prioritize projects based on alignment with corporate goals and ROI

• Determine specifications for all integration with project work to be performed.

• Perform detailed pre-sales technical architecture and design reviews with the client.

• Champion pre-sales cost containment strategies that drastically reduce the cost of sales by promoting Internet base solution demonstrations.

• Establish and maintain long-term relationships with teams within the territory to ensure successful projects and profit for the company.

• Create and implement monthly and quarterly sales/business review processes for client accounts, resulting in Year Over Year sales increases.

Manager

Trans-Tech Philippines Systems Corporation
Muntinlupa City
08.2021 - 12.2021

Supervisory Responsibilities:

• Hires and trains regional and local sales managers and staff.
• Organizes and oversees the schedules, territories, and performance of regional and local sales managers.
• Conducts performance evaluations that are timely and constructive.
• Handles discipline and termination of employees in accordance with company policy.
Duties/Responsibilities:
• Provides leadership to the sales team.
• Motivates and encourages sales team to ensure quotas are met.
• Reviews and analyzes sales and operational records and reports; uses data to project sales, determine profitability and targets, and identify potential new markets.
• Identifies and analyzes customer preferences to properly direct sales efforts.
• Assigns territories and sets quotas for sales teams.
• Consults with potential customers to understand their needs; identifies and suggests equipment, products, or services that will meet those needs.
• Resolves customer complaints, staffing problems, and other issues that may interfere with efficient sales operations.
• Collaborates with executive leadership to develop sales quotas and strategies. • Prepares sales budget; monitors and approves expenses.
• Acts as company representative at trade association meetings

• Performs other duties as assigned.

Functions as Technical; (Power plants, Manufacturing plants and Buildings).

- Site survey and preparation of proposal for Electrical project requirements: HVSG Switchgear, MVSG Switchgear, LVSG Switchgear, VCB, private pole distribution transformer, Power distribution panels, Lightning panels, circuit breakers, TVSS and genset.

- Site survey, inspection and preparation of proposal for Process Automation control systems; process field instruments, analytical instruments, sensors, transmitter, valve (motorized and pneumatics), DCS, PLC and BMS Building management systems, SWAS Steam water analysis systems, CEMS continuous emission monitoring systems, plant historian, DENR integration etc.

- Site survey and preparation of proposal for Auxiliaries project requirements: CCTV, PA-BGM, FDAS, CATV, Access Security managements, Telephone systems, GPS systems.

- Site survey and preparation of proposal for Mechanical project requirements: FirePro mechanical, HVAC/R.

- Detailed Engineering Design or “DED” preparation of and the actual detailed engineering designs, plans/drawings and cost estimates, supported by design analysis and calculations, brochures, catalogues, and technical specifications

- Front End Engineering Design to prepare the project approach and basis of design for the system. to develop a good project cost estimate for budget authorization. to reduce the risk of the project. to estimate the project duration and schedule during the detailed design phase.

Assistant Manager

Trans-Tech Philippines Systems Corporation
Muntinlupa City
08.2018 - 07.2021

Activities Performed: Essential Functions and Responsibilities:

• Develops and services assigned territory, including geographic region proposed.
• Actively and consistently seeks new customers within Civil, Structural, Mechanical, Electrical and Process Instrumentation and control automation markets
• Research customers’ needs and resolves problems
• Visits customers and potential customers to develop relationships, follow up on leads, set grower trials, close sales opportunities, and provide technical information
• Meets established sales budget (revenue, profit, expense) goals
• Achieve key metrics (customer visits per weeks, prospect visits per week, trials conducted).
• Gives technical support in person, by email and phone
• Delivers sales presentations and closes sales in a professional manner
• Makes product recommendations and presentations to growers, distributors, and industry organizations in order to educate and inform.
• Input’s customer activities, competitive intelligence, and industry information daily.
• Submits expense reports weekly
• Follows-up in a timely manner to voicemail and email requests from management, peers, and other internal and external customers
• Manages major accounts; establishes long-term, ongoing relationships with multiple people in a customer’s organization.
• Travels with distributor sales representatives as well as travels alone to visit end user customers.
• Attends industry and distributor trade shows
• Provides feedback to internal teams as well as with sales peers regarding competition, pricing, and marketing opportunities.
• Diligently communicates with industry leaders and enhances T-TPSC and ALLFAST image
• Maintains and shares an understanding of industry trends and technical developments that affect target markets
• Provides special updates to Management as is appropriate or requested
• Provide weekly updates of individual sales forecast to Manager as part of T-TPSC and ALLFAST process
• Participates in scheduled Sales Conference calls
• Responsible for initiating 1:2:1 meeting with Manager.

Senior Supervisor Engineer

Trans-Tech Philippines Systems Corporation
Muntinlupa City
02.2017 - 08.2018

Responsibilities;

- Develop and execute the operations projects with multiple project engineers and managers within the region including engineering, procurement, EPCM, owner’s team, and external construction management consultants.

-Responsible for project functions included but not limited to Project Management, Site Management, Project
Control Management, Engineering Management, Procurement,Construction Management, etc. are all coordinated and properly staffed to meet the project(s) goals.
-Ensure accurate and timely reporting standards are maintained throughout the project(s).
-Coordinate and communicate projects group as needed on major projects in the Region.
-Coordinate with regional and site management on status, significant trends and changes of approved projects.

-Establish the working relationship with operations management needed to facilitate the coordination and
execution of project work, such that the operational impact is minimized.
-Ensure safety and QA/QC programs are established by all parties and maintained and conduct reviews of
detailed design drawing and specifications.
-Monitor engineering progress against budget and forecasted schedule.
-Participate in and lead risk assessments and actively manage the risks of the projects and the business. Prepare project estimates, budget, schedules and execution plans.
-Preparing the engineering budget, project schedules and project control budgets for instrumentation and control
automation projects.
-Prepare and submit reports on the progress and status of the project Maintain effective and on-going communications with construction and contractor management teams Assist with project QA/QC and commissioning systems and documentation.
-Perform other project engineering and project management related duties.

Project Manager

Trans-Tech Philippines Systems Corporation
Muntinlupa City
07.2017 - 03.2018

Activities Performed: Coordinate internal resources and third parties/vendors for the flawless execution of projects
• Ensure that all projects are delivered on-time, within scope and within budget
• Assist in the definition of project scope and objectives, involving all relevant stakeholders and ensuring technical feasibility
• Ensure resource availability and allocation
• Develop a detailed project plan to monitor and track progress
• Manage changes to the project scope, project schedule and project costs using appropriate verification techniques
• Measure project performance using appropriate tools and techniques
• Report and escalate to management as needed • Manage the relationship with the client and all stakeholders
• Perform risk management to minimize project risks
• Establish and maintain relationships with third parties/vendors
• Create and maintain comprehensive project documentation
• Meet with clients to take detailed ordering briefs and clarify specific requirements of each project
• Delegate project tasks based on junior staff members’ individual strengths, skill sets and experience levels
• Track project performance, specifically to analyze the successful completion of short and long-term goals
• Meet budgetary objectives and adjust project constraints based on financial analysis
• Develop comprehensive project plans to be shared with clients as well as other staff members
• Use and continually develop leadership skills
• Attend conferences and training as required to maintain proficiency
• Perform other related duties as assigned
• Develop spreadsheets, diagrams and process maps to document needs

Assistant Project Manager

Wonderama Industrial Controls Corporation
Mandaluyong City
03.2016 - 03.2017

Responsibilities;
-Working Closely with Contractor project personnel and other contractors/vendors in coordination of project roles and responsibilities, task will include:

Documentation of construction activity Review of Submittal and related documents Review of RFQ’s, Purchase Orders and Requisitions Coordinate Field and Factory Acceptance Testing Activities Interpret Contract Documents Review RFI’s both Internal and External ones generated by others.
Review PLC and HMI programs and Displays to correlate with BID Document Control
-Work Independently in difficult and complex tasks.
-Generate general correspondence (Internal and External) and complex reports.
-Work pro-actively in identifying project needs/requirements that can be dealt with or without supervision
-Prepare Cost Estimates and Proposals for Change Order within the project assigned.
-Prepares Project Schedules in coordination with the contractors’ Master Project Schedule document
-Maintains the project schedule by monitoring project progress, coordination activities resolving problems that arise.
-Prepares Project Status reports by collecting, analyzing, and summarizing information and trends, recommending action in timely manner.
-Perform inspections in the Field of instrumentation and Controls, structural, mechanical, electrical and plumbing equipment and installation details to identify deficiencies versus contract documents.
-Present key Deliverables to the contractor and other end users and be able to communicate expertise to current and future clients.
- Maintains Clean and safe working environments by enforcing procedures, rules and regulations
-Maintain Company Reputation by complying with state and Federal regulations

Instrumentation and Control Engineer

Agonpacific Philippines Inc.
Makati City
10.2014 - 02.2016
  • Revised instrumentation guidelines to address exceptions and provide clarification, where needed.
  • Designed automation concepts and protocols for diagnostic testing and simulation purposes, applying Good Automated Manufacturing Practice (GAMP) protocols.
  • Drafted full piping and instrumentation diagram (P&ID) documents for use in [Type] industry.
  • Created process controls for use in [Type] design and production tasks.
  • Monitor the EPC Contractor's progress in design, procurement, fabrication, manufacture, shipping, and construction, installation, commissioning and testing against the contractual schedule. All monitoring tasks shall be carried out in the Site. Any delays should be identified at an early date and remedies agreed upon with the EPC Contractor.
  • Review the EPC Contractor’s plans for site management and monitor its staffing plan for efficient use of supervisory personnel, labour and materials and equipment on site. Monitor the EPC Contractor's material and equipment site receipt inspections.
  • Review any claims or change orders submitted by the EPC Contractor and provide the Owner with recommendations regarding action to be taken.Follow up implementation of variation orders raised by the Owner.
  • Provide the Owner with recommendations regarding "Mechanical Completion", "Ready for Commissioning", "Performance Tests", "Reliability Test", "Substantial Completion" and "Commercial Operation Date" per the terms of the EPC Contract.
  • Develop and maintain a punch list of open items and expedite their completion and closeout by the EPC Contractor.Hold and, when required, participate in regular weekly and monthly meetings with the EPC Contractor at the Site and call and conduct such other meetings as may be necessary.
  • Provide the Owner with recommendations regarding the imposition of liquidated damages should this become necessary as a result of EPC Contract delays or performance deficiencies.
  • Review the training material provided by the EPC Contractor prior to start of training of Owner's staff.
  • Check and Supervise for all Control and Instrumentation's plant related; DCS, PLC, Field instruments, Analytical instruments, Valves, SWAS, CEMS, WWTP control systems, coal handling systems, air compressor systems, ESP systems, Burner management systems, Turbine instruments, turbine control, UPS batteries systems, ash handling systems, BFP systems, Deaerator systems, Loop and Functional testing, logic and interlock testing, check all wiring systems etc, witness and check for popping test of SV, witness calibration of field instruments. Check all installation details, Check DCS program, Check engineering graphics for both DCS and PLC systems.

Deputy Project in Charge

DMCI SBU Power
Makati City
08.2013 - 09.2014

Project Engineering & Execution Responsibilities:
Detailed engineering and preparation of specification for various field instruments (level, pressure, flow &temp), Analyzers and control valves etc
-Preparation of material requisition for various instrumentation items like control valves, field instruments (level, pressure, flow &temp) and Analyzers etc.
-Preparation of junction box termination detailing, cable schedule, instrument air schemes, hook up drawings, instrument index and bill of materials ,P&ID review and Estimation of Instrument Air etc.
-Basic understanding and familiar with onshore/offshore oil & gas industries requirements and international code standards requirements like ATEX/CENELEC, NACE, API, ASME, ANSI, IEC, ISA, and NEC for design engineering related. Familiar with KKS Standards for Power Plant detailed design specifications.
-Knowledge on varies communication protocols like HART protocol, MODBUS protocol, Field bus protocol etc.
-Control Valve Sizing as per ISA.
-Orifice Plate sizing as per IS0 5167 standards and Flow Element Bore Calculations as per ISO 5167/BS 1042.
-Experienced in handling instruments in Hazardous areas as per CENELEC/ATEX & IS Standards and American standards and also other standards.
-Knowledge and Experienced of DCS-Distributed Control System OC6000e GE, software and Hardware installation and Function Block programming.

Project Attachment:
1x15 MW Circulating Fluidized Beds SMC Coal Fired Power Plant
Semirara Island, Caluya Antique Responsiblities;

Responsible on Material Management and QA/QC for Instrumentation and control monitoring and inspections.


Responsible on Project Monitoring, supervision on ITP Instruments and Test Plan for the whole plant BTG; Boiler, turbine and generator instruments installations, conduit and cable routing lay-out, cable tray installations, instruments impulse piping lay-out and tapping point for Flow, Pressure, Level and Temperature Instruments, Control valves, analyzers and local panel installations for turbine fuel system and etc.


Responsible on Project Monitoring, supervision on ITP Instruments and Test Plan for the whole plant BOP; Balance of Plants instruments installations, conduit and cable routing lay-out, cable tray installations, instruments impulse piping lay-out and tapping point for Flow, Pressure, Level and Temperature Instruments, Control valves, MOV, analyzers and local panel installations for chlorination plant, coal handling system, ash handling system, belt conveyor system, chlorination system, feed water system, sea water system, acid cleaning system, flocculants system, limestone system, circulation cooling water system, closed circulation cooling system and etc.

Monitoring of Daily work progress for the sub-contractor tasks, specify the proper installations for BTG and BOP’s instruments, control valves, JB local panel, control panel and etc. Check and inspections every area with ITP work flow if the work has been executed based on the method of statements and standards.


Responsible on DCS and PLC inspections based on the control system and design, inspections for the calibrations and testing method for instruments, loop testing, simulation and functional testing.

Coordination meeting with Sub Contractor CNEEC-China National Electric Engineering Company with regards on the engineering and design are concerns

Instrumentation and Control Engineer

Freelance
Taguig City
05.2013 - 07.2013

Project: SC Global Foods-Baybay Leyte Responsibilities:

Consultant on the instrumentation and control installations for the coco water process. Checked and inspections of various instruments installed in every area of equipment, supervised for the loop testing and continuity test and pre-commissioning.

Instrumentation and Control Engineer

PTCERNA Corporation
Makati City
03.2009 - 05.2013

Technical/Engineering Responsibilities:

Able to Interpret and understand Piping and Instrumentation Diagram (P&ID),Good understanding of Control Systems design deliverables/drawings, Able to develop plan or layout drawings, Familiar with materials, devices and instruments used in Control Systems (such as flow, level, temperature, pressure, analytical and other process instruments),Strong knowledge on Instrument Data specifications and model selection,Familiar with Control Systems specifications, American & European Codes and Standards, Able to perform design calculations Cable tray, Conduit, and Cable trench fill estimates and material take-off. Familiar with instrument specification and datasheets, Knowledge in DCS a system, PLC is a plus. Knowledge in AutoCAD, Knowledge of Control Systems design tools such as Intools, PDS. Computer literate (able to operate MS Excel, MS Word),Responsible for wiring termination, wiring layout, loop checking, Installation, Calibration, Testing and Commissioning on Field Instrument.

Pre-Sales and After-Sales Support and Responsibilities:

Production of responses to Requests for Information and Requests for Pricing. Development of Industry specific and
technical whitepapers, Work with Sales Personnel to provide product, business and technical knowledge in support of pre-sales activities. Responsible for staying abreast of product roadmap as well as understanding the scenarios, features and functions within each of the products and how these are applied to address business and technical problems. This includes interacting with Product Management and Development on an on-going basis to stay current. Ability to understand and capture business and technical requirements, Ability to multi-task and be able to represent multiple subjects and products. After-Sales is the ongoing relationship between the OEM and customer where services are rendered to the customer throughout the product life cycle to the end of life. This type of support typically includes warranty, upgrade and repair services.

Technician II- Instrumentaion and Control

Yokogawa Philippines
Quezon City
08.2008 - 02.2009
  • Improved operations through consistent hard work and dedication.
  • Received and processed stock into inventory management system.
  • Carried out day-to-day duties accurately and efficiently.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Interpret and understand Piping and Instrumentation Diagram (P&ID).Good understanding of Control Systems design deliverables/drawings. Able to develop plan or layout drawings. Familiar with materials, devices and instruments used in Control Systems (such as flow, level, temperature, pressure, analytical and other process instruments). Familiar with Control Systems specifications, American & European Codes and Standards. Able to perform design calculations Cable tray, Conduit, and Cable trench fill estimates and material take-off. Familiar with instrument specification and datasheets.Knowledge in DCS systems, PLC is a plus. Knowledge of AutoCAD R13/14/2000.Knowledge of Control Systems design tools such as Intools, PDS. Computer literate (able to operate MS Excel, MS Word, and MS Access).Responsible for wiring termination, wiring layout, panel installation for DCS Panel.Familiar with the DCS Hardware such as AI, AO, DI, DO MODULE, FCS and etc. And also Panel accessories such as terminal lugs, terminal block, and pvc duc.etc.Know how to print Using M1-PRO II printer for tagging and addressing all wires connected to any direction for easy implementation and troubleshooting purposes.Additional task performed as a material controller for DCS hardware, software, instrumentation equipments, panel accessories, and tube and pipe fittings materials.etc. Conduct Inventory and monitoring for all materials and stocks.Domain task is also conducted loop checking after panel assembled for FACTORY ACCEPTANCE TEST (FAT). To ensure all wiring connections and signal communication cable to the (DCS) Distributed control system is properly connected.

Control Systems Designer

Fluor Daniel Inc
Muntinlupa CIty
02.2008 - 05.2008

Job Description:

Marathon Petrochemical company-Louisiana, USA

-Wiring activity in SPI plant instrumentation intools

-Responsible for continue checking tag naming, tag loading, & conflict in wiring connections, continue review the wiring connection in DCS and SIS for loop generation, Modified all panel wiring connection in all unit area SULFUR B.

-Loop generation in SPI Smart plant instrumentation intools Responsible for continued generation of DCS loops with general DCS layout In all unit and SIS loops layout. Modifying
-Generated loops (smartext & other manual editing), continued revising blocks information (revision description, rev no.,date, drawing number, file no. And etc), continued checking for temperature loops, flow loops, pressure loops, level loops and analyzer loops.

Secretariat Staff

Philippine Instrumentation and Control Society
Mandaluyong City
06.2006 - 01.2007
  • Worked with customers to understand needs and provide excellent service.
  • Identified issues, analyzed information and provided solutions to problems.
  • Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
  • Exceeded goals through effective task prioritization and great work ethic.
  • Delivered services to customer locations within specific timeframes.
  • Worked to maintain outstanding attendance record, consistently arriving to work ready to start immediately.
  • Developed team communications and information for meetings.

Warehouse Staff

Cosmo Pack Inc
Mandaluyong City
05.2005 - 11.2005
  • Used hand-held devices and computers to record and monitor inventory levels and completed audits to uncover and address inaccuracies.
  • Operated pallet jacks and material moving equipment to receive and transport items from various warehouse locations.
  • Alternated goods in inventory by observing first-in and first-out approach to keep shelves organized and properly stocked.
  • Checked packages and merchandise for damage and notified vendors.
  • Loaded, unloaded and moved material to and from storage and production areas.
  • Placed incoming inventory in optimal storage locations to promote continued accuracy and easy retrieval.
  • Kept documentation and records accurate and up-to-date with latest data to prevent errors in processing or delivery.

Warehouse Checker/ Teamleader

Delmonte Philippines Inc
Taguig
04.2001 - 02.2005
  • Efficiently calculated figures and projections with minimal effort to support financial reporting obligations.
  • Produced annual budgets and weekly financial estimates to monitor productivity and gains/losses.
  • Responded diplomatically to questions from customers and general public about company finances.
  • Reconciled transactions and collected on accounts with outstanding balances while maintaining favorable professional connections.
  • Adhered to company regulations regarding workplace safety and employee health.
  • Maintained recycling collection sites to handle reclaimable waste from warehouse production.
  • Identified and removed Bad Order products not meeting outlined quality standards.
  • Reported discrepancies and shortages to help keep line on-track.
  • Checked loads to identify contents and unauthorized or highly regulated materials.

Education

Bachelor of Science - Computer Engineering

AMAUONLINE
Taguig City
05.2017 - 04.2021

Bachelor of Science - Instrumentation And Control Engineering

Rizal Technological University
Boni Ave., Mandaluyong City
06.2009 - 03.2012

Associate of Science - Instrumentation And Control Technology

Phil-Asia School of Instrumentation And Automation
Boni Ave., Mandaluyong City, Philippines
06.2006 - 08.2008

Skills

    MS Office(Excel, Word, Power point)

undefined

Accomplishments

  • Collaborated with team of 60 in the development and implementations of 1x15 MW Circulating Fluidized Beds SMC Coal Fired Power Plant
  • Collaborated with team of 90 in the development and implementations of SM200 Phase 1x100 MW Circulating Fluidized Beds Coal Fired Power Plant


Affiliations

  • ISA International Society of Automation
  • Philippines Instrumentation and Control Society

Certification

Certified [Instrumentation and Control Engineer], [Philippine Instrumentation and Control Society] - [12-16-2024]

Timeline

The Future of Performance Management, License # BE471453EF

10-2023

Senior Manager

Trans-Tech Philippines Systems Corporation
01.2022 - Current

Manager

Trans-Tech Philippines Systems Corporation
08.2021 - 12.2021

PROJECT MANAGEMENT; Solving Common Project Problems, License # 4277ACFB

09-2020

Assistant Manager

Trans-Tech Philippines Systems Corporation
08.2018 - 07.2021

Project Manager

Trans-Tech Philippines Systems Corporation
07.2017 - 03.2018

Bachelor of Science - Computer Engineering

AMAUONLINE
05.2017 - 04.2021

Senior Supervisor Engineer

Trans-Tech Philippines Systems Corporation
02.2017 - 08.2018

Assistant Project Manager

Wonderama Industrial Controls Corporation
03.2016 - 03.2017

Instrumentation and Control Engineer

Agonpacific Philippines Inc.
10.2014 - 02.2016

Deputy Project in Charge

DMCI SBU Power
08.2013 - 09.2014

Instrumentation and Control Engineer

Freelance
05.2013 - 07.2013

[BOSH (Basic Occupational Safety and Health training)September 5-9, 2011

09-2011

Hach Advance Boot Camp 2011 Process Program-March 22-26, 2011

03-2011

[Crison and HACH Training (Process) - [October 4-5, 2010]

10-2010

Service Training of HIAC LPC and MET-ONE Analyzer-Sept. 21-27, 2010

09-2010

[Instensive Riview of Instrumentation and Automation Course-50 hours

10-2009

Bachelor of Science - Instrumentation And Control Engineering

Rizal Technological University
06.2009 - 03.2012

Instrumentation and Control Engineer

PTCERNA Corporation
03.2009 - 05.2013

Certified [Instrumentation and Control Engineer], [Philippine Instrumentation and Control Society] - [12-16-2024]

10-2008

Certified [Instrumentation and Control Technician], [Philippine Instrumentation and Control Society] - [12-16-2024]

10-2008

Technician II- Instrumentaion and Control

Yokogawa Philippines
08.2008 - 02.2009

Control Systems Designer

Fluor Daniel Inc
02.2008 - 05.2008

Secretariat Staff

Philippine Instrumentation and Control Society
06.2006 - 01.2007

Associate of Science - Instrumentation And Control Technology

Phil-Asia School of Instrumentation And Automation
06.2006 - 08.2008

Warehouse Staff

Cosmo Pack Inc
05.2005 - 11.2005

[Accelerated of Instrumentation and Process Control- Measurement Course], [Phil-Asia School of Instrumentation and Automation] - [April 04-08, 2008]

04-2005

Warehouse Checker/ Teamleader

Delmonte Philippines Inc
04.2001 - 02.2005
Marcelino BiscoSenior Manager