Summary
Overview
Work History
Education
Skills
Timeline
List of Completed Projects
Generic

Lionel Celis Arceo

Quezon City

Summary

To leverage my technical expertise and leadership skills to drive innovation and deliver high-impact solutions. Focused on improving operational efficiency, enhancing project outcomes, and ensuring cost-effective designs, seeking to contribute to an organization where can manage complex engineering projects, lead cross-functional teams, and support sustainable growth through continuous process improvement

Overview

20
20
years of professional experience

Work History

Process Design Engineer - Design in Charge

Universal Robina Corporation- Global Engineering
07.2019 - Current
  • Orchestrated project feasibility studies and conceptual designs, evaluating technical, financial, and regulatory factors while developing high-level designs.
  • Oversaw basic design and budget estimations, creating project task lists and master plans.
  • Coordinated equipment procurement, preparing RFQs and directing the team in assessing process, packaging, and utility equipment.
  • Engineered and implemented manufacturing systems to optimize operational efficiency, minimize waste, and enhance product quality.
  • Directed design components of capital projects, managing project scopes, timelines, and budgets for facility upgrades and new equipment.
  • Championed the planning and design of plant layouts, focusing on line balancing and material flow.
  • Assessed and integrated innovative technologies to elevate production capacity and reduce expenses.
  • Designed production lines and layouts to guarantee compliance with food safety regulations.
  • Managed process mechanical and packaging design, overseeing electrical and civil designs to fulfill engineering standards.
  • Ensured adherence to industry standards and maintained comprehensive documentation for design projects.
  • Galvanized continuous improvement initiatives, optimizing processes, equipment, and layouts to address evolving industry demands.
  • Administered cost control measures for design projects, balancing budgets while prioritizing quality and safety.
  • Conducted risk assessments and resolved design-related issues to minimize production interruptions.

Lead Project Engineer - Local and Regional

Universal Robina Corporation- Corporate Engineering
09.2010 - 07.2019
  • Managed major projects from concept to completion, including site analysis and feasibility studies.
  • Developed and executed CAPEX budgets, ensuring expenditure control and project quality.
  • Directed the planning and design of plant layouts, emphasizing line balancing and material flow.
  • Oversaw process mechanical and packaging design, supervising electrical and civil designs to meet engineering standards.
  • Evaluated and sourced process and packaging equipment, preparing RFQs and performing assessments.
  • Supervised procurement processes to guarantee timely delivery of materials.
  • Led installation and commissioning of equipment and production lines.
  • Supervised contractors, ensuring strict adherence to safety standards (HACCP, GMP).
  • Mentored and guided a team of design engineers, collaborating with cross-functional teams to implement enhancements and resolve challenges.
  • Applied value engineering techniques to optimize resource utilization and material costs while maintaining quality.
  • Ensured fabrication designs aligned with operational objectives.
  • Executed process improvements to elevate efficiency and reduce waste.
  • Conducted project evaluations to ensure timely execution.
  • Led cross-functional teams in successful project commissioning.
  • Mentored engineering teams to align projects with organizational objectives.
  • Administered budget estimates and managed financial aspects, guaranteeing cost-effective solutions.
  • Analyzed projects for potential cost-saving opportunities.
  • Spearheaded initiatives to mitigate the environmental impact of manufacturing processes.
  • Ensured compliance with environmental regulations and sustainability objectives.
  • Oversaw system commissioning, verifying that all equipment and systems were installed and fully operational per design specifications.

Packaging Engineer

Universal Robina Corporation- Corporate Engineering
03.2006 - 09.2010
  • Managed the technical operations, maintenance, and servicing of various packaging equipment and their accessories.
  • Provided direction and support for reviews, evaluations, and recommendations involving the procurement and selection of equipment, ensuring all packaging machinery operated efficiently at optimum capacity.
  • Facilitated sourcing requirements for local and imported parts and equipment necessary for maintaining and enhancing production lines while minimizing inventory.
  • Advised maintenance teams on proper maintenance and servicing procedures for packaging equipment.
  • Invited suppliers to quote or bid, recommending approval for issuing POs and Proforma Invoices for parts, services, and equipment procurement.
  • Spearheaded the preparation of project proposals and the procurement of equipment for new projects and product development.
  • Identified and evaluated potential equipment suppliers effective for product packaging.
  • Prepared budgetary costs and technical analyses for equipment selection, presenting recommendations to the Senior Engineering Manager for approval by the Management Committee.
  • Developed final budgetary costs and technical analyses for selecting necessary equipment.
  • Led the implementation of packaging projects from installation through to commissioning.
  • Prepared Capital Expenditures budgets.

Education

B.S. - Mechanical Engineering

Tarlac State University
Tarlac City
03.2003

Skills

  • Project Management
  • CAD
  • Budget Estimates
  • MS Project
  • IPMS
  • BVOA
  • FMECA
  • Risk Management
  • Mitigation Plan
  • Plant Design
  • Strategic Planning & Implementation
  • Leadership

Timeline

Process Design Engineer - Design in Charge

Universal Robina Corporation- Global Engineering
07.2019 - Current

Lead Project Engineer - Local and Regional

Universal Robina Corporation- Corporate Engineering
09.2010 - 07.2019

Packaging Engineer

Universal Robina Corporation- Corporate Engineering
03.2006 - 09.2010

B.S. - Mechanical Engineering

Tarlac State University

List of Completed Projects

List of Completed Projects:

  • Noodle Pouch Line – Philippines – Cost Php 490M,Re
  • Refurbish Old Flour handling system -Philippines – Php 42M,
  • Choco coated Peanut line expansion – Philippines – Php 78M,
  • Noodle Cup Line – Philippines – Php 790M,
  • Noodle Pouch line (extra big) Phils – Php 590M,
  • Biscuit (hybrid) Line – Indonesia – Php 728 M,
  • Single and Double Layer Chocolate Line – Malaysia – Php 1.1B,
  • White coffee mixes – Philippines – Php 120M,
  • Noodle Pouch line-Philippines – Php 230M,
  • Noodle Pouch Line -Philippines – Php 250M,
  • Noodle Cup Line -Philippines – Php 380M,
  • Wafer Line – Philippines – 350M,
  • Wafer coated – (upgrade) -Myanmar – Php 45 M,
  • Nips Lentil (ala M and M ) Line – Philippines – Php190M,
  • Nips Lentil (ala M and M ) Line – Philippines – Php 470M,
  • Peanut coated Line -Philippines – Php 58 M


List of cost savings/Improvement Project :


  • C2 conversion from box to shrink-wrap - Php 3.5 /case,
  • Project Mercury – conversion from hot stamping code to thermal type- Php 1.5 /piece,
  • Conversion of paper labeller to OPP – Php 0.8 /Bottle, S
  • emi Automation end line packaging – 5M/year, Blending time for mixer – from 45 mins to 10 mins,
  • Bulk Delivery of Raw materials,
  • Biscuit Hybrid Line
Lionel Celis Arceo