Cel # +639260680375 / Philippine Cel # +639215692404 / Philippine Position desired TECHNICAL TRAINER/SITE SUPERVISOR
Overview
22
22
years of professional experience
9
9
years of post-secondary education
1
1
Language
Work History
Technical Skills Trainer
Megawide Construction Corporation
Foreman Supervisor
MDC First Balfour Joint Venture
Supervisor Foreman
Eurasia Marble and Granite Inc
Architectural Foreman
Leighton Contractor Philippine Inc
Office
Megawide Construction Corporation
08.2014 - Current
Module Developer of all Architectural Works as well as in Structural Works
Mentoring of Skilled Workers in Concordance with Company’s Work Methodology
Teaching Newly Hired Workers as well as Non-Skilled
Imparting Knowledge to Cadet Engineers and Architect
Duties and Responsibilities:
Develop schedule to assess training needs
Conduct employee surveys and interviews
Consult with other trainers, managers, and leadership
Track and compile collected data
Conceptualize training materials based on data and research
Communicate training needs and online resources
Create training strategies, initiatives, and materials
Test and review created materials
Maintain database of all training materials
Instruct employee training and onboarding
Conduct training through new materials
Review employee performance and learning
Structural Foreman
Philippine Sundt
Panay, Triangle Quezon City
12.2011 - 08.2014
Of Structural Works
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Supervision of fixing rebar for slab, beam, column & shear wall
Supervision of formwork alignment w/ use meva panel & accessories
Supervision of precast installation @ exterior walls, columns, stairs
Supervision of concrete pouring @ slab, columns & shear wall
Monitor of construction work schedule and accomplishment report
Coordination by site engineer for the other work implementation at the job site
Company :
Finishing Foreman
Wyeth Philippine
Laguna
10.2010 - 11.2011
Site Supervision of Architectural Works
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Demolishing wall partition & flooring tile
Layout of chb laying, plastering of wall partition, topping to prepare installation of vinyl tile.
Layout and prepare plastering at T and B for tile installation
Supervision of dry ceiling & dry wall partition lay out & installation
Supervision of metal studs installation to prepare gypsum board & hardiflex board
Supervision of topping to prepare for epoxy flooring finish
Monitor of construction work schedule and accomplishment report.0
Coordination by engineer for the other work implementation at the job site.
Works Supervisor
CKG. Citramegah Karya, Masonry, Ain Zara Tripoli Libya
01.2008 - 01.2010
Of Civil Works
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per grp to assigned at the job site area
Supervision of all manpower and monitor the schedule and accomplishment
Supervision of concrete pouring at slab, column, shearwall, retaining wall and stair
Supervision of lay out with buterboard to prepare for CHB laying
Monitor of the target schedule, and accomplishment report
Coordinating by Engineer for the other work schedule for implementation at the job site.
Site
Saint Luke Medical Center
Manila
01.2008 - 10.2008
Supervision of Structural Work
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Supervision of all manpower to formworks preparation, rebar layout, and concreting works at site
Monitor schedule of punch list close out
Monitor of construction work schedule and accomplishment report
Coordinating by engineer for the other work implementation at the job site.
Foreman
Makati Development Corporation
03.2006 - 01.2008
Site Supervision of Architectural works
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Supervision of dry ceiling & dry wall partition lay out & installation
Supervision of metal studs installation to prepare gypsum board & hardiflex board
Supervision of precast panel to install for wall partition @ perimeter area
Supervision to all manpower to preparation layout for CHB laying, plastering of wall partition
Topping to prepare for installation of wood Parquet and Vinyl Tile.
Layout and prepare plastering at T and B for tile installation
Monitor schedule of punch list close out
Monitor of construction work schedule and accomplishment report
Coordination by engineer for the other work implementation at the job site.
Site
The Shang Grand
Makati City
05.2005 - 03.2006
Supervision tile works and stone works
Duties and Responsibilities:
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Supervision to all manpower to preparation layout for CHB laying, plastering of wall partition, topping to prepare for installation of wood Parquet
Layout and prepare plastering at T and B for tile installation
Monitor schedule of punch list close out
Monitor of construction work schedule and accomplishment report
Coordination by engineer for the other work implementation at the job site.
Tile Setter
SKI FIRST BALFOUR Joint, Manansala Tower
Makati City
08.2004 - 04.2005
Tile works installation at T&B Area with preparation layout for mosaic installation @ shower area with tile trim termination.
Fin Mason
Project
Makati Development Corporation
03.2004 - 08.2004
Layout to preparation of CHB Laying Partition wall plastering
Floor topping Smooth Finish with rectification and Punch list works.
Mason & Tile Setter
SKI – KG Joint, The New Medical City, Meralco Compound. Ortigas
Pasig City
03.2003 - 03.2004
Site Supervision work at the area
Duties and Responsibilities:
Distribution of Manpower to assign the area
Perform of daily activities report
Supervise of masonry work assign the area
Coordination by Engineer and Foreman for the other works implementation at the jobsite.
Site Supervisor of Architectural works
FPIP
Batangas City
01.2002 - 03.2003
Conduct and toolbox meeting for company rules and regulation
Manpower distribution per group to assign at job site area
Supervision to all manpower to preparation layout for CHB laying, plastering of wall partition, topping to prepare for installation of wood Parquet and Vinyl Tile
Layout and prepare plastering at T and B for tile installation
Monitor schedule of punch list close out
Monitor of construction work schedule and accomplishment report
Coordination by engineer for the other work implementation at the job site.
Procurement Engineer/Procurement Manager at HYUNDAI ENGINEERING AND CONSTRUCTION CO. LTD. – MEGAWIDE CONSTRUCTION CORPORATION - DONGAH GEOLOGICAL ENGINEERING JOINT VENTURE (MALOLOS-CLARK RAILWAY PROJECT/ NORTH SOUTH COMMUTER RAILWAY) - PHILIPPINESProcurement Engineer/Procurement Manager at HYUNDAI ENGINEERING AND CONSTRUCTION CO. LTD. – MEGAWIDE CONSTRUCTION CORPORATION - DONGAH GEOLOGICAL ENGINEERING JOINT VENTURE (MALOLOS-CLARK RAILWAY PROJECT/ NORTH SOUTH COMMUTER RAILWAY) - PHILIPPINES
On the Job Training - Credit Collector at OCCCI- Metro Ormoc Community CooperativeOn the Job Training - Credit Collector at OCCCI- Metro Ormoc Community Cooperative