Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
Timeline
Junya Nagamine
Railway Interface Manager
Manila
Overview
30
30
years of professional experience
3
3
Languages
Work History
Interface Manager as Railway systems expert MMSP CP101
Shimizu-Fujita-Takenaka-EEI JV
02.2021 - Current
Implementing interface work between civil engineering / architectural design / MEPF design and Railway System design.
Coordination with PMC. Coordination of interfaces with other construction sections (CP102/CP107). Program coordination. Explaining the interface between the railway system and civil engineering contractors to our company.
Implementing risk management for interfaces.
Contact information for references
Head of Integration & Interface (Consultant)
EEI Corporation
05.2017 - 12.2020
As per Civil contractor, coordinate design Interfaces & Integration with Hyundai Rotem (System Supplier) for optimization of design, superimpose civil design and system.
Implementation of Risk management, resolve of design issues, control design and actual construction in the capacity of Head of Integration & Interface.
System Interface Expert
KATAHIRA & Engineer’s International
11.2016 - 05.2017
Provide Interfaces between Railway Systems and Civil design (Guideway, Super structure, Track Alignment, Station, Depot). Interfaces each sub-system (AFC, SCADA, Signaling, Telecom, Power supply, Traction Power, Rolling Stock).
Attending High level meeting with Client in the capacity of System Interface Expert.
Deputy General Manager
Samsung C&T Corp. Department of Civil Bidding Group Railway System Team
10.2011 - 03.2016
Provide expert technical consultation and responsibility in Railway Civil Bidding Department through tender documents, optimization, change management, also railways core systems interfaces, integration and site management in the capacity of Deputy General Manager.
Acting Manager
Mitsubishi Heavy Industries Co. Ltd. Transporting Systems & Advance Technologies Division
08.2008 - 08.2011
Provide verifications and validations for suppliers signaling control system, developed advanced signaling control system, review and modified for technical specifications, site management for railways system inspect and interfaces in the capacity of Acting Manager.
Senior Manager
Nippon Signal Co.Ltd. Quality Assurance Division Signaling Telemetry section
07.2005 - 07.2008
Provide development / commissioning / integration of CTC (Centralized Traffic Control) system, and site management as Operation Control Center and each Station signaling control for Taiwan High Speed Railway in the capacity of Senior Manager.
Manager
Japan Network Service Co. Ltd. Railway System Division Signaling Design Team
04.1995 - 06.2005
Provide programming / installing / commissioning / integration at railway systems for MRT / LRT / High Speed in the capacity of Manager.
Education
Higher degree first - undefined
Korea University Foreign Institutes
02.1994
Higher degree first - undefined
Yonsei University Korean Institute
02.1993
Higher degree first - undefined
Kokushikan University Mechanical Eng
03.1990
Higher degree first - undefined
Yukoukan Senior High school
03.1986
Skills
Team leadership
Affiliations
Membership of Japan Railway Engineer’s Association: since 2011
6. Adequacy for the Assignment
Detailed Tasks Assigned on Consultant’s Team of Experts:
Overall Project Implementation Program for Railway Project
Control for Construction and Installation
Interface Management (Railway systems and Civil Engineering / Tunnel / Stations /Building / Depot / Rolling Stock)
Implemented Various line in Tokyo Metro/High Speed Railway/Mining Railway/Dubai Metro/Riyadh Metro/Taiwan High Speed Railway/Airport Passenger Transmit vehicle (Hong Kong, Incheon Korea, Changi Singapore, Dubai UAE, Atlanta Miami and Dallas USA)
Leading of Bidding for Railway Projects
Procurement and Logistics Assistance
Project Management Consultancy (Interfaces with Civil and Railway Core System)
Review Tracks and Wayside Equipment
T & C for Railway Systems
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
Overview
Mr. Nagamine has over 30 years experienced exclusively on various railway projects for core system and interfaces with civil works such a Dubai Metro, Riyadh Metro, Taiwan High Speed Railway, Airport Passenger Transmitting systems, Tokyo Metro and High-Speed Railway in Japan. He has a deep understanding Train Control System (ATC, ATO, ATP, ATS, CTC, CBTC, Virtual Block, On-Board CB Signal, Train Integrity and Subsystems (SCADA, AFC, PSD, PS, Telecom, Power Supply, Asset Protections, Disaster Systems) also interfaces those systems with Civil engineering (Guideway, superstructure, Tunnel, Depot, Station and Utilities) . Specially, Design Interface with Construction these matters, he is implementation for coordination with Guideway and Track Works, Guideway and Installation Wayside Equipment’s (Railway Sub-Systems).
Timeline
Interface Manager as Railway systems expert MMSP CP101
Shimizu-Fujita-Takenaka-EEI JV
02.2021 - Current
Head of Integration & Interface (Consultant)
EEI Corporation
05.2017 - 12.2020
System Interface Expert
KATAHIRA & Engineer’s International
11.2016 - 05.2017
Deputy General Manager
Samsung C&T Corp. Department of Civil Bidding Group Railway System Team
10.2011 - 03.2016
Acting Manager
Mitsubishi Heavy Industries Co. Ltd. Transporting Systems & Advance Technologies Division
08.2008 - 08.2011
Senior Manager
Nippon Signal Co.Ltd. Quality Assurance Division Signaling Telemetry section
07.2005 - 07.2008
Manager
Japan Network Service Co. Ltd. Railway System Division Signaling Design Team