Summary

Detail-oriented Civil Survey Engineer with expertise in delivering precise stake-out, control, as-built, and layout surveys for civil and infrastructure projects. Ensures alignment with design specifications while upholding safety standards and compliance through diligent reporting. Leads survey operations for complex projects, effectively coordinating with teams to monitor site progress and support decision-making.

Overview

15
15
years of professional experience

Work History

Senior Civil Survey Engineer II

Sta. Clara International Corporation
Mandaluyong City
07.2020 - 09.2024
  • Assigned as Sr. Surveyor II in - charge of all data coordinate survey report stake out on-site location and elevation as per Design Drawing. South Luzon Expressway Toll Road 4. TR-4 is a 66.74-kilometre Expressway Road and a 6.9MW Hydroelectric power plant project in Barangay, Bitoon, Clarin Misamis Occidental Mindanao.
  • Executed construction surveys and various other types of surveys, including property and pre-engineering surveys, to support project requirements.
  • Conducted as-built surveys to verify compliance with design specifications, utilising forms for effective monitoring and reporting.
  • Establish vertical and horizontal control systems in the project.
  • Marked points based on the data from the issued for Construction (IFC) Plan provided by the Technical Services Department.
  • Performed all surveying activities for various projects.
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Implement Safety Precautions to prevent accidents while the work is in progress.
  • Delivered daily updates on job activities and site progress to ensure clear communication and alignment among project stakeholders.
  • Project Assignment: Laguna and all Hydroelectric power plant projects in Mindanao.
  • Position: Sr. Surveyor II

Surveyor

MRA Herrera Surveying Services
Imus
01.2019 - 07.2020
  • Assigned as Project Surveyor in - charge of high-rise Building, civil, structural, and architectural works for the following Building Structures Layout location and elevation as per Design Drawing.
  • Establish vertical and horizontal control systems in the project.
  • Layout points as per data provided on the issued for Construction (IFC) Plan from the Technical Services Department.
  • Carry out construction survey works and other types of survey (property surveys, pre- Engineering surveys, etc.)
  • Performed an as-built survey to document construction details and facilitate accurate reporting.
  • Performed diverse surveying functions to maintain project accuracy and compliance with relevant standards.
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Implement Safety Precautions to prevent accidents while the work is in progress.
  • Reported daily on job progress and site activities to keep stakeholders informed.
  • TPEX Tarlac Pangasinan Expressway.
  • Project Assignment: Cavite, Rizal, Bulacan, Laguna, Tarlac and Pangasinan

Civil Survey Engineer

F.S PHIL. CORPORATION
11.2017 - 11.2018
  • Assigned as Project Surveyor in - charge of civil, structural, and architectural works for the following Building Structures Layout location and elevation as per Design Drawing.
  • Carry out construction survey works and other types of survey (property surveys, pre-Engineering surveys, etc.)
  • Layout points as per data provided on the issued for Construction (IFC) Plan from the Technical Services Department.
  • Conduct an as-built survey for purposes of checking and reporting using the corresponding Forms for monitoring and recording.
  • Carry out construction survey works and other types of survey (property surveys, pre- Engineering surveys, etc.)
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Performed inspections and measurements on offshore platform.
  • Anchor Bolts Alignment and Elevation 2mm Tolerance
  • Conducted all surveying tasks.
  • Compile daily progress reports to track project milestones and enhance communication with stakeholders..
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Implement Safety Precautions to prevent accidents while the work is in progress.
  • Contractor: DAELIM PHILIPPINES INC.
  • Project Assignment: San Buenaventura 500MW Supercritical Power Plant project
  • Position: Surveyor
  • Certificate of Recognition: 5 MILLION SAFE MANHOURS
  • Address: Brgy. Cagsiay 1, Mauban Province of Quezon.
  • Contractor: DAELIM PHILIPPINES INC.
  • Project Assignment: San Buenaventura 500MW Supercritical Power Plant project
  • Position: Surveyor
  • Certificate of Recognition: 5 MILLION SAFE MANHOURS
  • Address: Brgy. Cagsiay 1, Mauban Province of Quezon.

Land Surveyor

Hanjun Construction Company
11.2015 - 08.2017
  • Assigned as Project Surveyor in - charge on High rise Building, Civil, structural, architectural works for the following Building Structures' Layout location and elevation Anchor Bolts Alignment as per Design Drawing.
  • Establish vertical and horizontal control systems in the project.
  • Layout points as per data provided on the issued for Construction (IFC) Plan from the Technical Services Department.
  • Carry out construction survey works and other types of survey (property surveys, pre- Engineering surveys, etc.)
  • Layout Location & Elevation of Foundation & Pedestal
  • Anchor Bolts Alignment and Elevation 2mm Tolerance
  • Ensured precise monitoring of bored piles location to maintain structural integrity.
  • Executed alignment of bolts on the piperack to meet engineering standards.
  • Conduct an as-built survey for purposes of checking and reporting using the corresponding Forms for monitoring and recording.
  • Oversaw all surveying tasks.
  • Managed offshore and dredging landfill operations, ensuring timely progress of project milestones.
  • Implement Safety Precautions to prevent accidents while the work is in progress.
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Generated daily updates on job status and construction site progress, enhancing communication and project tracking..
  • Conducted underground excavation activities to prepare site for construction.
  • Project Assignment: UGCC Ethylene plant Project (Uz-Kor Gas Chemical LLC)
  • Address: District, Republic of Karakalpakstan, Uzbekistan.
  • Position: Land Surveyor

Senior Civil Survey Engineer

F.S PHIL. CORPORATION
08.2012 - 09.2015
  • Assigned as Project Surveyor in - charge on High rise Building, civil, structural, architectural works for the following Building Structures' Layout location and elevation Anchor Bolts Alignment as per Design Drawing.
  • Executed surveying tasks to ensure project alignment with specifications and timelines.
  • Establish vertical and horizontal control systems in the project.
  • Layout points as per data provided on the issued for Construction (IFC) Plan from the Technical Services Department.
  • Conduct an as-built survey for purposes of checking and reporting using the corresponding Forms for monitoring and recording.
  • Carry out construction survey works and other types of survey (property surveys, pre- Engineering surveys, etc.)
  • Monitored locations of bored piles to ensure accurate placement during construction.
  • Oversaw operations at offshore and dredging landfills to facilitate project requirements.
  • Anchor Bolts Alignment and Elevation 2mm Tolerance
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Implement Safety Precautions to prevent accidents while the work is in progress.
  • Reported daily on job progress and site activities to maintain clear communication and project tracking.
  • Contractor: DAELIM PHILIPPINES INC.
  • Project Assignment: PETRON REFINERY CORPORATION Refinery Master Plan 2 Project (RMP2)
  • Address: Limay, Bataan
  • Position: Surveyor
  • Achievement Award: 4 MILLION SAFE MANHOURS
  • Substation 34.5KV
  • Substation RIB 2C
  • Substation RIB 2D
  • Substation RIB 2E

Civil Survey Engineer

BGC PHILBUILDERS Inc.
Clark / Medellin
07.2009 - 07.2012
  • Assigned as Project Surveyor in - charge on Relocation survey Layout location and elevation as per Drawing.
  • Establish vertical and horizontal control systems in the project.
  • Layout points as per data provided on the issued for Construction (IFC) Plan from the Technical Services Department.
  • Carry out construction survey works and other types of survey (property surveys, pre- Engineering surveys, etc.)
  • Conduct an as-built survey for purposes of checking and reporting using the corresponding Forms for monitoring and recording.
  • Coordinated and managed all surveying tasks on site, ensuring accurate project execution.
  • Ensure the safety of equipment and materials especially personnel during work hours in Compliance with environment, health, and safety rules and guidelines.
  • Conducted survey of underground manhole locations to ensure accurate mapping.
  • Established precise positioning for tee mounds to meet design specifications.
  • Performed survey to identify optimal alignment for cart paths, enhancing overall design integrity.
  • Identified and recorded locations for tee house, lake, bunker, and fairways.
  • Recorded project locations in Clark, Pampanga and Medellin, Cebu for accurate mapping.
  • Reported daily on job progress and site activities.
  • Project Assignment: 36 Holes Golf Course at Korean Country Club. 18 Holes Golf Course at Queens Island Golf Course.
  • Position: Project Surveyor

Education

Bachelor of Science in Civil Engineer - Don Honorio Ventura Technological State University

Don Honorio Ventura Technological State University
Bacolor, Pampanga
01-2012

Lanao School of Science and Technology Inc. -

Lanao School of Science and Technology Inc.
Maranding, Lala Lanao Del Norte
01-2006

San Antonio Elementary School - Lanao Del Norte

San Antonio Elementary School
Looc, Tubod Lanao Del Norte
01-2002

Skills

  • Civil 3D expertise
  • AutoCAD
  • Surveying equipment operation
  • Surveying calculations
  • Geospatial analysis
  • Microsoft Office proficiency
  • Collaboration
  • Multilingual communication

Personal Information

Age: 37

Custom Section

Tondo, Manila

References

  • Maebelle Rose Herrera, MRA Herrera Surveying Services., 0998-954-7572, 0956-886-5537
  • Roselle Sarile Garcia, Vice President, Daelim and FSPHIL,Corp., 0917-537-2359
  • Juan Paolo Santiago, Project Manager, BGC PHILBUILDERS., 0920-906-0773
  • Mr. Song Hanyong, President, Hanjun Construction., +82 32 328 8305
  • Mr. Alberto De Sagon, Sr. Project Manager, Sta. Clara International Corp., +63 9176550791

Timeline

Senior Civil Survey Engineer II

Sta. Clara International Corporation
07.2020 - 09.2024

Surveyor

MRA Herrera Surveying Services
01.2019 - 07.2020

Civil Survey Engineer

F.S PHIL. CORPORATION
11.2017 - 11.2018

Land Surveyor

Hanjun Construction Company
11.2015 - 08.2017

Senior Civil Survey Engineer

F.S PHIL. CORPORATION
08.2012 - 09.2015

Civil Survey Engineer

BGC PHILBUILDERS Inc.
07.2009 - 07.2012

Bachelor of Science in Civil Engineer - Don Honorio Ventura Technological State University

Don Honorio Ventura Technological State University

Lanao School of Science and Technology Inc. -

Lanao School of Science and Technology Inc.

San Antonio Elementary School - Lanao Del Norte

San Antonio Elementary School
June ray Herrera