Summary
Overview
Work History
Education
Skills
Certification
Personal Information
Timeline
Generic
JOSELITO C. VALENCIA

JOSELITO C. VALENCIA

Sta Rita

Summary

Possesses versatile skills in project management, problem-solving, and collaboration. Brings fresh perspective and strong commitment to quality and success. Recognized for adaptability and proactive approach in delivering effective solutions.

Overview

28
28
years of professional experience
1
1
Certification

Work History

QA/QC, Electrical Engineer

Ronmark Construction
01.2022 - 09.2022
  • Electrical Construction in line with MEPF and Civil.
  • Coordinate with the subcontractor on the installation of electrical equipment cables, control panels, power distribution system, extra low voltages such as CCTV, fire alarm system, local area network, PABX system.
  • Reviews the incoming daily work orders indicating maintenance and defect repairs required with the Planners, raises stored issue vouchers (SIV’s) for needed spareparts and obtains applicable work permits.
  • Allocate work to subordinates, checks progress, provide instructions and advise as necessary and ensure that all electrical tests and runs are carried out prior to handling back equipment or systems to the Operations Department.
  • Reports to Project Engineering Manager, Carries out assignments in accordance with establish work procedures and specialized technical standards. Work is subject to review and direction.
  • Client: AC Energy Corporation
  • Projects: San Marcelino 230 kV GIS Sub-Station

Senior Electrical Engineer

JER Consult CORP.
06.2019 - 12.2021
  • Project Management in line with MEPF and Civil.
  • Responsible to define the improvements, participate for coordination control and completion of projects ensuring company strategy, consistency, commitment and goals.
  • Responsible for overall direction, and to manage all related operation on site, thru project schedule, project standard such as; Engineering Standard, Material Standard, Design & Specification Standard.
  • Support Department Construction Manager in line with Electrical Engineering works interfacing with Architectural works.
  • Coordinate with design coordinator, engineer’s project representatives in all design issues.
  • Review design deliverables together with design coordinator and engineers to ensure order for submission.
  • Participate in technical design clarification, design meetings and construction project meetings.
  • Coordinate with project coordination team members, vendors and subcontractors with regards to workability and constructability of design.
  • Develop relations with planning engineer on design submission schedule and ensure timely design submissions.
  • Coordinate with document controller on design deliverables, CB, PMI, SI, etc. transaction to ensure smooth flow of documents for issuance to the contractors.
  • Issue CMOR, progressive punch list to concern contractor, participate and observe safety practices in construction area.
  • Provide QA, QC practices to address technical issues and establish method statements (MS), Inspection and Test Plan (ITP), based on Materials Standards, Engineering Standards, & Design.

Senior Electrical Engineer

I. A. Campbell and Associates Inc.
07.2016 - 12.2018
  • Construction Management in line with MEPF interface with Architectural/ ID & Structural
  • Responsible to define the improvements, participate for coordination control and completion of projects ensuring company strategy, consistency, commitment and goals.
  • Responsible for overall direction, and to manage all related operation on site, thru project schedule, project standard such as; Engineering Standard, Material Standard, Design & Specification Standard.
  • Support Department Construction Manager in line with Electrical Engineering works interfacing with Architectural works.
  • Coordinate with design coordinator, engineer’s project representatives in all design issues.
  • Review design deliverables together with design coordinator and engineers to ensure order for submission.
  • Participate in technical design clarification, design meetings and construction project meetings.
  • Coordinate with project coordination team members, vendors and subcontractors with regards to workability and constructability of design.
  • Develop relations with planning engineer on design submission schedule and ensure timely design submissions.
  • Coordinate with document controller on design deliverables, CB, PMI, SI, etc. transaction to ensure smooth flow of documents for issuance to the contractors.
  • Issue CMOR, progressive punch list to concern contractor, participate and observe safety practices in construction area.
  • Provide QA, QC practices to address technical issues and establish method statements (MS), Inspection and Test Plan (ITP), based on Materials Standards, Engineering Standards, & Design and Specification Standards.

QA/QC – Project Electrical Engineer

Saudi Engineering Group International
07.2012 - 12.2015
  • Review the Quality Plan and the Quality System of participating contractor and sub-contractor.
  • Reporting quality activities.
  • Follows up corrective and preventive actions.
  • Update and maintains quality records as required.
  • Developing system to ensure the quality of work and or services that are designed and produced to meet the customers requirements and satisfaction.
  • Prepare internal and external audit schedule and arrange the audit accordingly.
  • Assures the internal and external conformities have a preventive and corrective actions.
  • Client: Saudi Electricity Company
  • Projects: Dhahiyah Sub-station 115/13.8 kV, 24BD 115/13.8kV S/S, 380/132/13.8kV Madain BSP, 380kV Duba- Madain OHTL, 380kV Duba- Tabuk OHTL, 380/132/33/13.8kV Umlujj BSP

Instrument Supervisor

Daewoo Engineering and Construction
11.2011 - 04.2012
  • Responsible for the supervision in the installation of Instrument fittings, secondary cables, tubing, airline and Steam tracing tubing.
  • Cable tray installation.
  • Review shop drawings, such as P & ID.

Electrical Engineer

Tareg Al Jaafari Contracting Est.
07.2010 - 07.2011
  • Review Shop Drawings and make some revision.
  • Designing Panelboard schedules and calculate for the Loads.
  • Coordinate with the subcontractor on the installation of electrical equipment cables, control panels, power distribution system, extra low voltages such as CCTV, fire alarm system, local area network, PABX system.
  • Reviews the incoming daily work orders indicating maintenance and defect repairs required with the Planners, raises stored issue vouchers (SIV’s) for needed spareparts and obtains applicable work permits.
  • Allocate work to subordinates, checks progress, provide instructions and advise as necessary and ensure that all electrical tests and runs are carried out prior to handling back equipment or systems to the Operations Department.
  • Reports to Project Engineering Manager, Carries out assignments in accordance with establish work procedures and specialized technical standards. Work is subject to review and direction.
  • Coordinates between 5 to 6 subcontractor per site.

QA/QC – Site Electrical Engineer

Anel Qatar & Electrosis Qatar Joint Venture
02.2009 - 12.2009
  • Preparation for testing and inspection for the installed electrical installation from cable ladder, cable tray, steel trunking, PVC ductings, trench, wire mesh for grounding, termination of wires, from LV to HV connections, lightning protection, etc.
  • Supervises the installation, maintenance, repair and testing of a wide range of electrical equipment (including LV, MV, ELV).
  • Monitors work execution and provides guidance to ensure conformity to statutory and company regulations.
  • Deals personally with more complex maintenance and participates in shutdown and turnaround maintenance and planning activities.
  • Reviews regular reports provided by the contractors to assess work progress and status, highlights discrepancies or areas requiring improvement and assists them in resolving problems encountered.
  • Reviews consumption, discusses interchangeability with Electrical Engineers and prepares detailed list of requirement.

QA/QC-Electrical Supervisor

Contracting & Construction Ent. Ltd.
02.2007 - 06.2008
  • Work hand in hand with the management in implementing Quality Control Procedures and in solving quality related Issues.
  • Monitor project QA/QC activities during the Construction Phase and ensure that construction quality programs are implemented at site and quality objectives achieved.
  • Review and approve technical submittals for construction materials.
  • Review material submittals and check their compliance with project specifications, approved drawings and relevant standards.
  • Reviews Method Statements and construction procedures quality documents of suppliers and sub-contractors, including approval of these documents, when required develop the same to support the site’s requirement.
  • Prepare Method Statements for the project.
  • Participate in vendor/supplier assessments as required and carry out quality system and compliance check at vendors/suppliers premises.
  • Provide feedback to the management with reasons on construction, subcontractors and vendor’s quality control performance.
  • Monitor and maintained updated register of documents in relation to quality, and made reports for the same.
  • Coordinate with all departments and project coordinators to addressed all quality related issues are settled and closed.
  • Guide the site as applicable to ensure adequate head office support is provided to their site teams.
  • Represents the QAQC Department to ensure continual practice and representation.
  • In charged in the over all construction of the projects.
  • Coordinate with sub – contractors evaluated their accomplishments and ensured that their work is done with quality and within project schedule.
  • Prepare estimates. Evaluated the proposals of each contractors, compared these with the in – house estimates and recommended to the president the tender most advantageous to the company.
  • Prepare shop drawings using AutoCAD.

Electrical Site coordinator

Penta-Shimizu-Toa Joint Venture
01.2005 - 01.2007
  • Coordinate with the subcontractor on the installation of electrical equipment (including LV and MV) generators, motors, transformers, cables, control panels, power distribution system, switchgears, motor control center, extra low voltages such as CCTV, fire alarm system, local area network, PABX system and Building Management System.
  • Reviews the incoming daily work orders indicating maintenance and defect repairs required with the Planners, raises stored issue vouchers (SIV’s) for needed spareparts and obtains applicable work permits.
  • Allocate work to subordinates, checks progress, provide instructions and advise as necessary and ensure that all electrical tests and runs are carried out prior to handling back equipment or systems to the Operations Department.
  • Reports to Project Engineering Manager, Carries out assignments in accordance with establish work procedures and specialized technical standards. Work is subject to review and direction.
  • Coordinates between 5 to 6 subcontractor per site.

Electrical Supervisor

J. L. Ong Construction
12.2003 - 12.2004
  • Supervision on Electrical Installation on Appartelle’s Mansion House & Commercial Buildings.
  • Follows up on the installation of materials and wiring as per plans and diagrams ensuring that installation conform to correct methods and safety procedures.

Technical Engineer

H. W. Electric Philippines
11.1998 - 05.2000
  • Electrical installation of wires and cables through the Panel board of synchronizing generators.
  • Termination of control wires in manual and auto transfer switches.
  • Alignment and installation of panel enclosure through the busduct.
  • Assembly of MCCB, low and medium voltages.
  • Installation of busbars through the ACB to the busduct loads.
  • ACB assembler.

Field Engineer

MERALCO
06.1997 - 10.1998
  • Electrical inspection for the service of residential commercial, and industrial establishments.
  • Inspector of rated loads on houses buildings and other Establishments.

Electrical Technician

ACCRO ENGINEERING
05.1996 - 05.1997
  • Electrical installation of wires and fixtures.
  • Repair and replacement of defective units in a certain Commercial and industrial building.
  • Responsible for the maintenance of the finish project for a period of time.

Electrician

MAG Contractor & Developer Inc.
01.1995 - 04.1996
  • Installer of wires and cables in a building and resort villas in Mimosa Leisure Resort.
  • Construction and termination of manual transfer switch of the standby generator rated 10 Kw.

Education

Bachelor of Science - Electrical Engineering

Holy Angel University
04.1998

High School - undefined

Santa Rita College
Santa Rita, Pampanga
04.1993

Elementary - undefined

V. de Castro Elementary School
Sta. Monica, Sta. Rita
04.1989

Skills

  • Computer Literate
  • MS Word
  • Excel

Certification

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

Personal Information

  • Age: 48
  • Place of Birth: Pampanga
  • Height: 5'5"
  • Weight: 155 lbs
  • Citizenship: Filipino
  • Emergency Contact: Mrs. Jessica V. Lascano, (046) 4890967
  • Date of Birth: 06/28/76
  • Gender: Male
  • Marital Status: Married
  • Religion: Roman Catholic

Timeline

QA/QC, Electrical Engineer

Ronmark Construction
01.2022 - 09.2022

Senior Electrical Engineer

JER Consult CORP.
06.2019 - 12.2021

Senior Electrical Engineer

I. A. Campbell and Associates Inc.
07.2016 - 12.2018

QA/QC – Project Electrical Engineer

Saudi Engineering Group International
07.2012 - 12.2015

Instrument Supervisor

Daewoo Engineering and Construction
11.2011 - 04.2012

Electrical Engineer

Tareg Al Jaafari Contracting Est.
07.2010 - 07.2011

QA/QC – Site Electrical Engineer

Anel Qatar & Electrosis Qatar Joint Venture
02.2009 - 12.2009

QA/QC-Electrical Supervisor

Contracting & Construction Ent. Ltd.
02.2007 - 06.2008

Electrical Site coordinator

Penta-Shimizu-Toa Joint Venture
01.2005 - 01.2007

Electrical Supervisor

J. L. Ong Construction
12.2003 - 12.2004

Technical Engineer

H. W. Electric Philippines
11.1998 - 05.2000

Field Engineer

MERALCO
06.1997 - 10.1998

Electrical Technician

ACCRO ENGINEERING
05.1996 - 05.1997

Electrician

MAG Contractor & Developer Inc.
01.1995 - 04.1996

High School - undefined

Santa Rita College

Elementary - undefined

V. de Castro Elementary School

Bachelor of Science - Electrical Engineering

Holy Angel University
JOSELITO C. VALENCIA