Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Interests
Watching movie
watching tagalog action movie english action
Timeline
Generic
Josefino                Santos Fulgencio

Josefino Santos Fulgencio

CIVIL / ELECTRICAL FOREMAN

Summary

1. Civil house expansion works

A- Carpentry form works

B- Steel columns, Beam Fabrication

C- Masonry hallow blocks installation and floor concerting works

D- Plumbingwater line and sewer line

E- Electrical piping lay out wiring installation

2. Finishing works

A- Kitchen cabinet

B- Dressing cabinet

C- Ceramic floor tiles

D- Painting inside/outside


All this skills by own actual experience

Supervising

Overview

33
33
years of professional experience
1
1
Certification
1
1
Language

Work History

Installer

  • Of Raised flooring, Electrical, Construction
  • Location
  • B-10L1-D Phase 4 buenmar Ave Corner Jasmine St.
  • Greenland Executive Village Cainta Rizal
  • Sub Contractors
  • Job Description: A
  • As a Project Site Supervisor I responsible for the safety PPE, workers
  • Tools, Equipment as per comply of Safety Rules by the Semiconductor company
  • B
  • As a Project Site Supervisor I responsible for giving Instruction to the installer of Raised floor, Aluminum, Steel cement panel based on drawing lay-out as per customer advised C, As a Project Technical Manager I am responsible for all kinds of jobs like steel works, carpentry, mason, Electromechanical, tiles installer and painting works as coordinated by civil/building Project Engineers and as per design drawing of Architect and Engineers 3

project supervisor

CIVIL/ BUILDING Construction
  • I am responsible for the safety Civil/building workers.Tools,Equipments as per comply of Safety Rules by Assad Said and Hyundai Safety B
  • As a Project Supervisor I am responsible for giving safety orientation to the workers for all kinds of jobs like steel works, carpentry, mason tiles installer and painting works as coordinated by civil/building Project Engineers and as per design drawing of Hyundai Architect and Engineers
  • Duration:

Project Coordinator

Department Fabrication Filter Dept
  • My responsibility the Safety of all Fabricators workers by the company rolls and regulations Of Safety PPE, Tools, Equipment's As Project Coordinator I responsible to the coordination to the Project site owners or Eng'r Architect and Safety Officers Managers
  • Before the start of the project
  • As Project coordinator I responsible to Approval of all kind Of necessary paper works drawing diagram site location Safety orientation before the installation of products or units.

General Foreman

  • I am responsible for the technical works, laborer and all construction works such as electrical, plumbing, masonry, steel works, coordinated by architect, civil engineer based on approved Municipal Engineering Plan.

project supervisor

Ghazan
Dammam
  • I am responsible for the safety of workers for all kind of jobs like steel works, carpentry, mason, electrical, tiles installer, and painting works as coordinated by
  • B
  • As a Project Supervisor I am responsible for the safety of workers for all kinds of jobs like steel works, carpentry, mason,electrical, tiles installer and painting works as coordinated by

Engineers and Consultant

ON CALL SERVICES
  • Engineer
  • C
  • As Project Supervisor I am responsible for the installation of mechanical works, like air conditioning pipes and plumbing works, SHORT TERMS (for 6 years)
  • Civil house expansion works
  • Carpentry form works
  • Steel columns, Beam Fabrication
  • Masonry hallow blocks installation and floor concerting works
  • Plumbing water line and sewer line
  • Electrical piping lay out wiring installation
  • Finishing works
  • Kitchen cabinet
  • Dressing cabinet
  • Ceramic floor tiles
  • Painting inside/outside
  • Driver Service 4Wheels Only

Project Site Supervisor

GUMIHO Trading and Construction Services
02.2017 - 03.2018

As technical project Supervisor the industry of Semiconductor

Company I supervising installation of Raised flooring and other

clean room requirements.

Civil site Foreman

BUILDERS Advance Engineering Contracting. CO WLL
10.2015 - 02.2017
  • I have been working for 30
  • Year(s)
  • Experience, DOHA QATAR RAF A3
  • Subcontractors of KRAM BURGER / ASSIONA / TTQA Main Contractor By
  • Owner of FICHNER REVERSE COSMOSIS PROJECT A
  • As a Site Foreman I responsible for the safety Civil/building workers.Tools,Equipments as per comply of Safety Rules by As BUILDERS and KRUM BURGER Safety
  • B
  • As a Site Foreman I responsible for giving safety orientation to the workers for all kinds of jobs like steel works, carpentry, mason tiles fins installer, painting works Underground water Tank Construction and Piping installations
  • Coordinated by civil/building Project Engineers and as per design drawing of Main contractor KRUM BERGER / ACCIONA / TTQA Approval by the owner of FIHTNER REVERSE OSMOSIS Project Architect and Engineers.

Project Site Supervisor

ANELEMIRATES, ANEL EMIRATE General Contracting LLC, Abu Dhabi International
ABU DHABI
01.2014 - 01.2015
  • Air Port
  • Midfield Terminal Building
  • Job Description: A
  • As an Site Electrical foreman I am responsible for the safety PPE, workers
  • Tools, Equipment as per comply of Safety Rules by the Construction Manager AECOM Main Contractors TAV Construction, CCC, and ARABTEC by comply safety rules and regulations of ANELEMARATES
  • B
  • As an Electrical Foreman I m responsible for the supervisions For the electrical works base on approve drawing plan
  • And as per advice of site Eng'r C
  • As an Electrical Foreman I am responsible also as follow 1
  • Lay outing of cable tray/ Track Low / Medium voltage's tray, 2
  • Lay outing of conduits, RSC pipe lighting and conve outlet, fire alarm 3
  • Cable fooling, wiring and commissioning
  • 4
  • Installation of all electrical equepment materials For the substation.

Site Project Supervisor

ASSAD SAID CONRTACTING CO.,LTD, Power Plant, Druma Electric Power Plant Riyad
11.2010 - 02.2012

. As a project supervisor I am responsible for the safety

Civil/building workers.Tools,Equipments as per comply of

Safety Rules by Assad Said and Hyundai Safety

B. As a Project Supervisor I am responsible for giving safety

orientation to the workers for all kinds of jobs like steel works,

carpentry, mason tiles installer and painting works as coordinated by

civil/building Project Engineers and as per design drawing of Hyundai

Architect and Engineers.

Safety Coordinator

DAKENSON INTERNATIONALE INC
07.1998 - 01.2000
  • Industry Air Filter Manufacture
  • Location Herrera compound Quirino High way NOVA Q.C

Electrical/ Civil Supervisor

Fulgencio Compound
Makati City
05.1997 - 08.1998

As General Foreman I Supervising all kind of skills.

also Safety first before start of works most be wearing PPE

All kind of work base on drawing plan by Approve by the Civil Eng'r

Site Project Supervisor

Ghusoon Al-Jazirah Establishment
04.1994 - 01.1996

A. As a project supervisor I am responsible for the safety of workers for all kind of jobs like steel works, carpentry, mason, electrical, tiles installer, and painting works as coordinated by

B. As a Project Supervisor I am responsible for the safety of
workers for all kinds of jobs like steel works, carpentry, mason,
electrical, tiles installer and painting works as coordinated by
Engineers and Consultant Engineer.

C. As Project Supervisor I am responsible for the installation of
mechanical works, like air conditioning pipes and plumbing works

Class A Electrician Foreman

Transphil Manpower Resources, Inc, ELECTRICAL MACHINERY ENTERPRISES, INC
Makati City
08.1991 - 11.1991
  • Electrical Machinery Enterprises Project in Kuwait, As Class "A" Electrician I am responsible for the supervision of the electrical works such as the installation of: Armored Cable Power Supply Wire cable falling from main station to main distribution panel
  • Responsible for workers to lay-out and installation of power panel and lighting panel
  • Responsible to terminate all wires of earth leakage paneling.

Electrical foreman

La Consolacion Cooperative Building, PARISH COUNVENT
San Juan
04.1989 - 08.1990
  • A .Responsible for the electrical installation for residential houses,building as contracted by the company based on plan and as percoordination to the Electrical Engineer
  • B
  • Responsible for the maintenance of the plant as well as the company equipment such as welding machines, generator and others
  • C
  • Trouble shooting/repair and installation of machinery's on various Industrial Plant which involve electrical trouble in accordance to its plan, brochure and other diagrams.

Electrical/foreman

Ken Gen Sen Builders Inc
04.1985 - 08.1988
  • Steel/ Stainless Fabrications and Construction, Responsible for the electrical installation for residential houses, buildings, as contracted by the company based on plan and as per coordination to the Electrical Engineer
  • B
  • Responsible for the maintenance of the plan as well as thecompany equipments, such as welding machine,generators andothers
  • C
  • Trouble shooting/repair and installation of machineries on variuosindustrial plants which involve electrical trouble in accordance to its plan, brochure and other diagrams.

Education

Bachelor science of Electrical Engineer under grad - Practical Electricity

Guzman Institute Of Technology
Quiapo Manila
06.1980 - 1981.03

Diploma - Vocational Diploma / Short Course Certificate Practical Electricity

Bachelor science of Electrical Engineer
Quiapo Manila
06.1980 - 1981.03

Electrical (Electronics Engineers - undefined

Guzman Institute Of Technology
06.1981 - 1982.05

Skills

Civil Supervising / Electrical Foreman

undefined

Accomplishments

  • Supervised team responsible for executing well on projects, leading to 95% increased revenue.

Certification

Safety awarding certificate

Interests

For my family and to going older to saving my self

Watching movie

Action movie like kung fu any

adventure movie

watching tagalog action movie english action

action movies like kung fu tagalog ation movies comedy movies and also praying to god to say thanks to all blessing very day Guinness

Timeline

Project Site Supervisor

GUMIHO Trading and Construction Services
02.2017 - 03.2018

Civil site Foreman

BUILDERS Advance Engineering Contracting. CO WLL
10.2015 - 02.2017

Project Site Supervisor

ANELEMIRATES, ANEL EMIRATE General Contracting LLC, Abu Dhabi International
01.2014 - 01.2015

Site Project Supervisor

ASSAD SAID CONRTACTING CO.,LTD, Power Plant, Druma Electric Power Plant Riyad
11.2010 - 02.2012

Safety Coordinator

DAKENSON INTERNATIONALE INC
07.1998 - 01.2000

Electrical/ Civil Supervisor

Fulgencio Compound
05.1997 - 08.1998

Site Project Supervisor

Ghusoon Al-Jazirah Establishment
04.1994 - 01.1996

Class A Electrician Foreman

Transphil Manpower Resources, Inc, ELECTRICAL MACHINERY ENTERPRISES, INC
08.1991 - 11.1991

Electrical foreman

La Consolacion Cooperative Building, PARISH COUNVENT
04.1989 - 08.1990

Electrical/foreman

Ken Gen Sen Builders Inc
04.1985 - 08.1988

Electrical (Electronics Engineers - undefined

Guzman Institute Of Technology
06.1981 - 1982.05

Bachelor science of Electrical Engineer under grad - Practical Electricity

Guzman Institute Of Technology
06.1980 - 1981.03

Diploma - Vocational Diploma / Short Course Certificate Practical Electricity

Bachelor science of Electrical Engineer
06.1980 - 1981.03

Installer

project supervisor

CIVIL/ BUILDING Construction

Project Coordinator

Department Fabrication Filter Dept

General Foreman

project supervisor

Ghazan

Engineers and Consultant

ON CALL SERVICES
Josefino Santos FulgencioCIVIL / ELECTRICAL FOREMAN