Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Projects Handled
Power Plant and Factory Acceptance Test Conducted
Timeline
Generic
JOHN KENNETH ALMAR  CARANDANG

JOHN KENNETH ALMAR CARANDANG

VILLACORTA STREET, BRGY. LAPNIT, SAN ILDEFONSO, BULACAN,PHILIPPINES

Summary

Detail-oriented and highly organized Electrical Engineer with over a decade of experience in the power utility sector, specializing in power system studies and grid operations and maintenance. Proven expertise in conducting technical analyses, system audits, and compliance assessments aligned with national and international standards, ensuring safe, reliable, and efficient transmission network performance.

Highly skilled in power system modeling, contingency analysis, and data-driven decision-making to optimize grid reliability and operational efficiency. Adept at leading cross-functional teams and managing complex projects, delivering measurable improvements in system stability, outage reduction, and regulatory compliance.

Recognized for strong leadership, strategic execution, and collaborative approach, committed to supporting organizational goals through technical excellence and continuous improvement in utility operations.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Senior Principal Engineer - System Operations

National Grid Corporation of the Philippines
Diliman, Quezon City, Philippines
05.2021 - Current

Operational Assessment and System Studies

  • Lead comprehensive simulation studies to identify and resolve grid constraints, develop protection schemes, and establish operational guidelines for system dispatchers.
  • Conduct research on emerging technologies, including HVDC systems, EMTP switching transients, and undervoltage load shedding, contributing to innovation in grid operations.

Generator Grid Compliance Testing

  • Lead compliance testing initiatives for Variable Renewable Energy (VRE) like Solar, Wind and Battery Energy Storage System (BESS) and emerging technologies like STATCOM/SVGs and Grid Forming Technolgies.
  • Ensure adherence to grid standards and operational reliability through rigorous validation and performance assessment.
  • Manages the Grid Compliance Tests (GCT) of new/existing generating power plants to conform with the requirements of the Philippine Grid Code.

System Impact Study (SIS) Review

  • Evaluate Operational Assessments in SIS reports to determine the impact of proposed customer network projects on grid reliability and the systems of other users.
  • Ensure alignment with operational standards and grid code requirements.

System Modeling & Model Management

  • Maintain and update the Luzon Grid Model, ensuring accuracy and consistency across operational scenarios.
  • Validate and integrate models from Planning and Engineering into the operational basecase using advanced simulation tools such as PSS®E, ASPEN, PSCAD, and MATLAB.

SIPS Operation Analysis

  • Perform in-depth analysis of System Integrity Protection Scheme (SIPS) operations through detailed assessment reports.
  • Ensure the reliability and security of installed schemes across the Luzon Grid.

Grid Security Guidelines

  • Develop and review operational guidelines related to grid security to support real-time decision-making by dispatchers or real time system operators.
  • Mitigate the impact of system disturbances, including SIPS activations and fault level issues, through proactive planning and documentation.
  • Prepares contingency plans during holidays and special events to ensure continuous and smooth operation of the Grid

Regulatory Representation

  • Represent Luzon System Operations in regulatory workshops and technical forums organized by Regulatory and Reliability Affairs (RRA).
  • Advocate for compliance with the Philippine Grid Code, ERC resolutions, and other statutory standards in generator and load customer connections.

Regional Planning and Project Monitoring Engineer

National Grid Corporation of the Philippines
Binan City, Laguna, Philippines
01.2020 - 05.2021

AOR: South Luzon Operations and Maintenance (SLOM)-NGCP

•Responsible for scheduling and monitoring of GOMP and Sub Transmission Line maintenance shutdown and non shutdown activities and prepares Planned Activity Notice (PAN) using TLDIS .

• Facilitate and monitor outages reclassification with our area of responsibility. Coordinates with concerned groups to establish/ ascertain readiness in the implementation of scheduled works, vis-a-vis, SO-approved schedule.

• Closely coordinates with the other concerned units to synchronize/harmonize the implementation of maintenance and/or project activities.

• Monitors the availability of tools, equipment, materials and other resources needed for the maintenance transmission lines and substation equipment.

• For planned activities involving power interruption, communicates with Field personnel on the progress of work which are relayed to, as agreed with Load customers (Distribution Utilities, Directly-connected Industrial Customers, among others)

AVP Head of SLOM Technical Staff

National Grid Corporation of the Philippines
Binan City, Laguna, Philippines
01.2019 - 01.2020
  • Introduced the used of Data Analytics and created various dashboard for regional operational statistics, Outages of Transmission Facilities, Transco Audit compliances,Projects implementation (HVE, Secondary, TL & Infrastructures Projects) through “MS Power BI” application which significantly enhanced the decisionmaking of the SLOM Management and hasten the implementation of the necessary action,which also regularly shares to other O&M offices outside the region
  • Monitors the measured parameters of online diagnostic devices installed in various power transformers that determine the operating condition of the most valuable asset in the substation.
  • Perform duty at the South Luzon Regional Command Center during O&M contingencies in time of emergencies, like typhoons, heavy rains & flooding and National Events like State Visit of foreign Presidents, Popes, APEC Meeting, National and Local Election, among others.

O&M Project Engineer/Budget Officer

National Grid Corporation of the Philippines
Binan City, Laguna, Philippines
01.2016 - 01.2019
  • Supervision/monitoring and inspection of projects for construction/rehabilitation/upgrading of Transmission Lines and Substation facilities; makes decision on construction issues in compliance with plans and specification and implementation schedules that are within the protocol of the Contractor's scope of work.
  • Ensures smooth implementation and quality of workmanship of the project; ensures compliance with IMS and Safety Standard at the project site; prepares accomplishment reports, site inspection reports and other reports relative to the assigned project.
  • Prepares economic Engineering Design such as Development Plans and Conceptual Designs for Substations and Transmission Lines structures and facilities and other related Infrastructure Projects; Prepares the Designs, Plans, Specifications, Cost Estimates, Schedules and other documents for the proposed Infrastructure Projects.
  • Reviewed monthly operations to assess compliance with budgets and determine necessary adjustments for future plans.
  • Evaluated procurement needs and projected expenditures.

Project Engineer-12.5MWp Kirahon Solar Power Plant

First Balfour, Inc.
Villanueva, Misamis Oriental, Philippines
05.2015 - 11.2015
  • Served as lead project engineer during construction and installation of solar panels and commissioning of the said power plant.
  • Set work schedules, coordinated site facilities and monitored progress.
  • Visited construction sites daily to evaluate work quality.

Engineer (Contractual)

National Grid Corporation of the Philippines
Binan, Laguna, Philippines
05.2014 - 12.2014
  • Responsible for the preparation of Bid Documents which includes preparation of plans/drawings, detailed engineering cost estimate and also for assisting in the monitoring of O&M Projects.
  • Inspected project sites to monitor progress and adherence to design specifications, safety protocols and local/international standards.

Education

Bachelor of Science - Electrical Engineering

Mapua Institute of Technology (MIT)
Intramuros, Manila City
2013

Skills

  • Power System Studies (PSSE, PSCAD)
  • Power System Analysis
  • Power System Planning
  • Grid System Operations and Maintenance
  • Grid Interconnection Studies
  • Project Management
  • Data Analytics (MS Power BI)
  • Construction Management
  • Licensed Transmission Line Drone Pilot
  • Computer-Aided Design: Autocad, ZWCad
  • Electrical Design

Certification

  • PSSE Customized Steady State & Dynamic Stability Training : Nov 2024
  • Power System Operations Training (PSOT) Program: Mar 2024
  • RPAS-152109 : Remotely Piloted Aircraft Controller Certificate by CAAP (Transmission Line Drone Pilot): Sep 2021
  • Completed Training Course for MS Power BI: Jun 2019
  • Enterprise Risk Management (ERM) Training by Environmental Compliance Consultants, Inc.: Aug 2019
  • Certificate of Completion of Construction Safety and Health Course for Site Safety Officers (40 Hours) by World Safety Organization: Feb 2019
  • Licensed Electrical Engineer - Profession Regulatory Commission: Mar 2014

Accomplishments

  • Leads various simulation studies with the success energization of critical projects like energization of Pabilao 500kV Substation, Hermosa- San Jose 500kV line (HSJ) backbone project and success implementation of Dona Imelda 230kV GIS comprehensive maintenance and study provide management overview of the impact of the entry of Large VRE generators like 2500MW Terra Solar, 550MWp 3BEC Solar ,Tanay Wind, Makban BESS (IRESS) and Luntal Lumabangan Solar and BESS (IRESS) etc.
  • Leads Grid Compliance Testings (GCT) for Variable Renewable Energy (VRE) projects, applying best practices to streamline and accelerate the release of test results and conducted extensive simulation studies to assess the impact of the 2500MW Terra Solar entry, evaluating various energization schemes, including scenarios with and without drawdown across components of the Marilao 500kV Substation, Taguig, and Navotas projects.
  • Leads the highly technical Electromagnetic Transients Program (EMTP) switching transient study, in preparation for the integration of 2500MW Terra Solar and other related switching studies.
  • Conducts and leads various simulation studies related to the new large generators and critical projects, especially in the Bataan Area and impose recommendation to expedite implementation of Dasmarinas 5th Bank Transformer to mitigate grid issues in Cavite Area.
  • Provide automation of various process improvements like automation of Energization Request Form/ Energization Request Permit processing and used of MS Power BI for Grid Assessment overview and Project Monitoring Dashboard for easy access and reference.
  • Pioneer the creation of Data Analytics Dashboard for Operation and Maintenance Management using MS Power BI for (Transmission Line Defects and Outage Monitoring, Performance and Compliance Monitoring and Budget Monitoring for CAPEX and OPEX)

Projects Handled

  • Western Luzon 500kV Backbone Project (Stage 2) Schedule I - Castillejos 500kV and Balsik 500kV Substation Portion and Castillejos 230kV Substation Portion
  • Hermosa-San Jose 500kV Backbone Project
  • Marilao EHV Substation Project
  • Tuy Substation Project
  • GIS Maintenance of San Jose 500kV SS and Dona Imelda 230kV GIS SS
  • Luzon Primary Equipment Substation Upgrading Project Calamba Portion
  • Uprating of Bay-Calamba 69kV TL
  • Tiwi A & C Substation Upgrading Project
  • South Luzon 69KV Wood Pole to Steel Pole Replacement Program
  • Refurbishment of Corroded OHGW Along Gumaca – Labo 230 KV TL (Phase 2)
  • Installation of New Neutral Tubular Bus at Tayabas 500KV Transformer
  • Upgrading of MTD-A Old Admin Building
  • Installation of New 150KVA Generator Set at Binan SS,Dasmarinas SS and Las Pinas SS
  • Installation of Fire Alarm System at Daraga SS
  • Rehabilitation of Water Supply System at Gumaca Substation • Installation of 5MVA Transformer , 69KV PCB & associated equipment at Pitogo SS
  • Calaca Substation Upgrading Project
  • 12.5MWp Solar Power Plant Project-Vilanueva Misamis Oriental

Power Plant and Factory Acceptance Test Conducted

Power Plant Tested:

  • 160MW Balaoi and Caunayan Power Project by Bayog Wind Power Corp (BWPC)
  • 70MW Caparispisan Wind 2 under ACEN - Amihan Renewable Energy Corp (AREC)
  • 46.658MWp/37.8MWac Armenia Solar Power Plant under Aboitiz RE Resources, Inc.
  • 59.814MWp/46.200MWac Sinocalan Solar Power Plant under ACEN
  • 75.214MWp Palauig Solar Power Project under Shizen Inc.
  • 113.829MWp Pinugay Solar Power Project under PH Renewables Inc.
  • 74.168MWp Calabanga Solar Plant under NEXIF - 1st Large Solar Plant in Bicol Region
  • 51MWac North Wind Power Plant 1 and 2 under ACEN

Laboratory Testing and Factory Acceptance Testing Attended:

  • FAT and VRE Laboratory Test of 26MVAR Static VAR Generator (SVG) for Tanay Wind Project - October 2025 at Sieyuan Qingnen Electric at Shanghai and Nanjing China
  • VRE Laboratory Test of Inverter For The 550MWp Bugallon Solar Power Plant Project of 3 Barracuda Energy Corp. (3BEC) - May 2025 at Huawei R&D in Guangdong and Shanghai, China
  • VRE Laboratory Test of Inverter For The 44.2MWac Sinocalan Solar Power Plant Project of ACEN - May 2023 at SUNGROW Research & Development Center in Hefei, China
  • Factory Acceptance Test of Super Thermal Alloy Conductor Invar Reinforced (STACIR) Power conductor for the Uprating of Bay-Calamba 69kV Line - Nov. 2019 at LS Cable Gyeongsangbuk-do, South Korea

Timeline

Senior Principal Engineer - System Operations

National Grid Corporation of the Philippines
05.2021 - Current

Regional Planning and Project Monitoring Engineer

National Grid Corporation of the Philippines
01.2020 - 05.2021

AVP Head of SLOM Technical Staff

National Grid Corporation of the Philippines
01.2019 - 01.2020

O&M Project Engineer/Budget Officer

National Grid Corporation of the Philippines
01.2016 - 01.2019

Project Engineer-12.5MWp Kirahon Solar Power Plant

First Balfour, Inc.
05.2015 - 11.2015

Engineer (Contractual)

National Grid Corporation of the Philippines
05.2014 - 12.2014

Bachelor of Science - Electrical Engineering

Mapua Institute of Technology (MIT)
JOHN KENNETH ALMAR CARANDANG