Summary
Overview
Work History
Education
Skills
Software
Certification
Timeline
Generic
John Brix Tumamao

John Brix Tumamao

Licensed Mechanical Engineer
Quezon City

Summary

Professional with strong background in leadership and team management. Proven track record in driving results and ensuring team collaboration. Skilled in strategic planning, problem-solving, and adapting to dynamic environments. Known for reliability, effective communication, and delivering high-quality outcomes.

Overview

2
2
Certifications
6
6
years of professional experience

Work History

Assistant Manager

Metro Pacific Water Solutions Inc.
10.2026 - Current
  • Led daily operations to ensure consistent service delivery and workflow coordination.
  • Monitored team performance and provided coaching to strengthen accountability and productivity.
  • Coordinated cross-functional tasks to support project execution and operational deadlines.
  • Reviewed reports and records to maintain accuracy in management decisions and compliance.
  • Improved process efficiency by identifying bottlenecks and implementing practical workflow adjustments.
  • Managed client and internal communications to resolve issues and maintain service continuity.
  • Supported budget tracking and resource allocation to control operational costs effectively.
  • Assisted in recruiting, interviewing, hiring, and onboarding of new employees to maintain adequate staffing levels.

Electro-Mechanical Supervisor

Metro Pacific Water Solutions
01.2024 - Current
  • Supervised electro-mechanical crews, assigning work orders and verifying safe completion of repair activities.
  • Inspected mechanical installations, ensuring compliance with safety procedures and engineering standards.
  • Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all mechanical needs.
  • Contributed to process improvement initiatives by offering valuable insights based on extensive field experience.
  • Reported on work progress to manager and incorporated feedback to maintain tight schedules.
  • Developed strong relationships with clients, vendors, and subcontractors to facilitate smooth project execution.
  • Conducted comprehensive risk assessments prior to commencing new work assignments, implementing appropriate mitigation strategies where required.
  • Spearheaded site supervision for advanced STP projects (SBR, BNR, and MBR), driving quality control and precision alignment with project specifications and design blueprints.
  • Monitored and motivated employees, tracking and documenting activities, correcting problems and implementing improvement plans to boost quality of mechanical work.
  • Prepared regular departmental reports detailing mechanical installation, maintenance and repair activities.

Closeout Supervisor

Metro Pacific Water Solutions Inc. (formerly Ecosystem Technologies International Inc.)
04.2023 - Current
  • Directed the closeout of Aging and Ongoing STP and water technology projects, achieving 100% compliance with regulatory and organizational standards.
  • Streamlined project documentation processes, improving accuracy and audit readiness
  • Conducted final inspections & QA/QC checks, ensuring zero major punch-list items during handover.
  • Managed financial closeout activities, reconciling budgets and reducing payment delays.
  • Implemented risk mitigation plans, preventing schedule slippages and minimizing closure delays.
  • Delivered comprehensive closeout reports and facilitated knowledge-transfer workshops, reducing repeat project errors.
  • Prepared and submitted O&M manuals and all project closeout documents, improving client operational readiness.
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.

Project In Charge

Enertech Systems Industries Inc.
07.2021 - 03.2023
  • Supervised the installation of multiple boiler and tank systems, including:
  • 50HP Oil-fired Boiler – VVS Cold Storage & Processing, Navotas (2020–2021)
  • Deaerator Tank - Franklin Baker, Laguna (2022)
  • 0HP Hot Water Boiler & LPG Tank - Concrete Ventures, Batangas (2022)
  • Methanol & H2 Buffer Tanks - Nippon Sanso Ingasco, Batangas (2022)
  • 3 x 100HP Steam Boilers (ASME Stamped) – Solaire North Project, Quezon City (2022–April 2023)
  • Ensured compliance with safety standards and ASME specifications, delivering projects on time and within budget.
  • Coordinated manpower, equipment, and site activities to ensure safe and efficient installations.
  • Conducted QA/QC checks and produced detailed progress and completion reports for clients.

Project Manager - Supply Chain (Boiler Industry)

Enertech Systems Industries Inc.
11.2020 - 08.2021
  • Managed procurement and logistics from technical specification review to supplier coordination.
  • Directed project schedules, milestones, and resource assignments to maintain execution consistency.
  • Project-managed the design, fabrication, and installation of:

50HP Steam Oil-fired Boiler – VVS Cold Storage & Processing, Navotas (2020–2021)

3 x 100HP ASME Stamped Boilers - Solaire North Project, Quezon City (2022-2023)

  • Reviewed project plans, technical requirements, and implementation risks to prevent delivery delays.
  • Negotiated with vendors and suppliers to reduce lead times and minimize procurement costs.
  • Monitored schedules, budgets, and quality standards, achieving 95% on-time material delivery.
  • Ensured all equipment and systems met ASME and regulatory compliance requirements.

Education

Bachelor of Science - Mechanical Engineering

Technological Institute of the Philippines
Quiapo Manila
10.2019

Highschool Diploma - undefined

Sergio Osmena Sr. Highschool
Quezon City
03.2013

Skills

Project Management

Lifecycle execution, contract administration, closeout supervision, documentation control

Technical Expertise

STP systems, ASME-stamped boilers, piping installation, QA/QC inspections

Project Dashboard and S-Curve

Software

MS Project

Primavera P6

Excel

AutoCad

Solidworks

Certification

Certified SO2 in Construction Safety and Health Seminar Forty (40)-hour Seminar

Timeline

Assistant Manager

Metro Pacific Water Solutions Inc.
10.2026 - Current

Electro-Mechanical Supervisor

Metro Pacific Water Solutions
01.2024 - Current

Closeout Supervisor

Metro Pacific Water Solutions Inc. (formerly Ecosystem Technologies International Inc.)
04.2023 - Current

Project In Charge

Enertech Systems Industries Inc.
07.2021 - 03.2023

Project Manager - Supply Chain (Boiler Industry)

Enertech Systems Industries Inc.
11.2020 - 08.2021

Highschool Diploma - undefined

Sergio Osmena Sr. Highschool

Bachelor of Science - Mechanical Engineering

Technological Institute of the Philippines
John Brix TumamaoLicensed Mechanical Engineer