A. Dredging Works
B. Reclamation Works
*Pre-Survey to Latest Update = Actual Volume on Site
*Actual volume to Design Surcharge Volume = Volume to be filled
*Volumes on Sand-Rehandling Works
*Volumes on Surcharge Removal Works
*Volumes Required for Construction Jetty 3 (CJ3)
*Cumulative Volume (Pre-Survey to Monthly Cut-Off Date)
*Volumes for Hydro Fill (from Andromeda V pumping works)
*Volumes for Dry Fill (from existing file of filling materials)
***Hydropro Navigation Survey Application
***Terramodel HDMS Software (Survey Data Processing)
***QINSy Data Processing (Multibeam Surveys)
***PDS2000 (Acquisition & Data Processing Software)
***Vectorgrafix Applications (Profiler, Barge Monitoring System)
***AutoCAD
***MS Office Applications
***Successfully passed the Geodetic Engineers Licensure Examination given by the Board of Geodetic Engineering of the Professional Regulation Commission in the City of Manila, Philippines dated 9-10 July 2001.
Mr. Heah Kean Beng (Rex)
HR Manager
MGB Construction Sdn. Bhd.
HP: +60.165152543
Email: heahkb@mgbgroup.com.my
Mr. Martin Q. Maligmat
Resident Technical Officer
Surbana Jurong
HP: +65.91542179
Email: martin.maligmat@surbanajurong.com
Ms. Jocelyn Tan Ang
Finance Analyst
Cummins Asia Pacific Pte. Ltd.
HP: +65.85159084