Summary
Overview
Work History
Education
Skills
Interests
Affiliations
Certification
LANGUAGES
Timeline
ADDITIONAL EXPERIENCE
Generic
JEANY BACTISMO

JEANY BACTISMO

Cebu City

Summary

Registered Electrical Engineer (REE) with over 6.5 years of experience in Shipbuilding design (Electrical part) with proven ability to interpret engineering data, design specifications and equipment connection diagram. Provide technical support to Senior Design Engineer and prompt response to feedbacks. Detail-oriented, proactive and organized professional with strong communication skills who collaborates effectively with internal teams.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Design Engineer 2

Tsuneishi Technical Services (Phils.), Inc.
10.2019 - 05.2026
  • Staff-in-charge for Electrical Diagram (ED) design for two (2) Bulk Carrier ship projects
  • Prepared single line diagram for ship's Internal Communication, Navigation and Radio System.
  • Prepared single line diagram for ship's Lighting System.
  • Checked connection drawings of makers including Main Control Console, Group Starter Panels, Main Switchboard as design input for single line diagram preparation.
  • Prepared detailed connection plan of electric equipment for cable termination.
  • Prepared scheme plan drawings for fire detecting system, general alarm & public address and antenna arrangement.
  • Organized and checked detailed drawings from the equipment's maker including Wheelhouse Group Panel, Bridge Control Stand, Lighting Distribution Panels, Junction Box and ship's Navigational equipment.
  • Prepared Purchase Order Specifications (POS) of electrical equipment for Internal Communication and Navigation as per ship's specifications.
  • Ensured efficient utilization of man-hours for drawing preparation and checking.
  • Electrical Outfitting (EO) Support Staff to Senior Design Engineer handling Limestone Carrier and Bulk Carrier ship projects
  • Ensured technical support and on time delivery of detailed drawings, cable purchase order, equipment order and 3D cable wiring of electrical equipment.
  • Arranged electrical equipment of ship both 2D and 3D model using in AutoCAD and CADMATIC Outfitting Software.
  • Provided support to Machinery team during the ship's sea trial through pressure and temperature readings in the engine room.
  • Staff-in-charge for EO design for three (3) Bulk Carrier ship projects
  • Prepared detailed EO design drawings as per ship's specifications, additional items, special items, application of feedback items from subsequent ships and Tsuneishi shipbuilding standards.
  • Communicated with Japanese staff-in-charge about the ship's new information, design confirmations, owner's request and yard's feedback.
  • Ensured on time delivery of drawings and prompt response to Japanese staff's revision requests and consultation drawings with other teams.

Education

Bachelor of Science - Electrical Engineering

Cebu Institute of Technology-University
Cebu City
03-2019

Skills

  • Detail-oriented
  • Time management
  • Proactive communication
  • Problem Solving
  • Engineering: ZWCAD, AutoCAD, 3D CADMATIC Outfitting
  • Documentation: MS Office (Excel, Word, Publisher), Wondershare PDFelement, Google Drive
  • Collaboration: Microsoft Teams, Microsoft Outlook, Zoom
  • 2D and 3D modeling
  • CAD software
  • Continuous improvement
  • Critical thinking
  • Design documentation
  • Cross-functional collaboration
  • Design verification

Interests

Hiking, Overnight Camping, Reading self-help books, Cooking

Affiliations

  • Member, Institute of Integrated Electrical Engineers of the Philippines, Inc
  • Cebu City Chapter Sep 2019 to Mar 2028

Certification

Registered Electrical Engineer (REE) Sep 2019 to Mar 2028

LANGUAGES

Japanese
English
Cebuano
Filipino

Timeline

Design Engineer 2

Tsuneishi Technical Services (Phils.), Inc.
10.2019 - 05.2026

Bachelor of Science - Electrical Engineering

Cebu Institute of Technology-University

ADDITIONAL EXPERIENCE

  • On the Job Trainee (Revenue Protection Department), Visayan Electric Company Apr 2018 to Jun 2018
  • Banilad, Cebu City
  • Assigned to create field orders to be dispatched field orders to VECO contractors performing the meter test and report any line side tampering.
  • Participated in field inspections and meter testing in three (3) establishments in Mabolo, Cebu City.
  • Participated in field inspection and observed three-phase meter installation for an establishment in City of Naga, Cebu.
  • Attended technical seminars conducted by the different Engineering departments of the company.
JEANY BACTISMO