Determined Project Manager with 14 years of experienced in Telecom industry adept at assigning tasks to team members based on individual strengths. Communicated with key project stakeholders to ascertain project requirements.
Overview
16
16
years of professional experience
1
1
Certification
Work History
Regional Project Manager
Aviat Networks Philippines
03.2016 - Current
Responsible for the planning, re-evaluation of the design and scheduled of the committed project.
Responsible for the development and monitoring of the implementation strategies and identify areas of improvement and make adjustment.
Responsible for the kick-off meetings or contractors project awarding to achieve the project deadlines.
Responsible for the approval of PO of the contractors including extreme hauling cost review.
Tracked project and team member performance closely to quickly intervene in mistakes or delays.
Responsible for the escalation of those sites with site access issue causing delays on the target build.
Managed client expectations with professional, considered approach to projects.
Responsible on the creation of power tapping MOP for the SO approval request for NSB and existing links.
Responsible for the creation of MOP for the SO approval of the change-out activity.
Responsible for the evaluation of the current circuit loading for the affected sites or services to be filed as primary requirement on the migration SO approval.
Responsible for the creation of the network topology to be used in the MOP as reference by the NOC, RSC and SICE during and after migration activity.
Responsible for the creation of the migration script to be used by NOC TRS in AN configuration including the DCN or management script for the NMS uploading.
Responsible for the monitoring of the activities of the contractors on site including the timely update of the activity to the client until all the affected circuits are restored.
Responsible for the checking of the installation of the contractors to ensure that all Globe Standard and company standard are being applied as part of the QA.
Responsible for the processing of the CFATA for the dismantled of the existing old equipment.
Responsible for the review and uploading of the PREPAT DOCS being submitted by the contractors as requirements on the PAT by GT TEO.
Responsible for the timely update of the internal tracker and Globe tracker.
Responsible for the weekly cadence meeting with the proponent to maintain the open communication by presenting regular updates on the project status to the customer.
Responsible for the meetings between project and stakeholder to discuss the deliverables, schedules and conflicts.
Responsible for the monitoring of the PAT, PAC and FAC of the projects.
Responsible for the immediate response on the escalated issues by GT Operations.
Responsible for the deployment of the teams during restoration of the escalated link.
Responsible for the reporting internally regarding the status of the project.
Transmission Engineer
Globe
01.2014 - 10.2015
Assist and supervised Vendors and subcontractors for the installation and troubleshooting, testing and PAT on site ( Indoor and Outdoor).
Assist and performed power tapping ,traffic migration and hot swap for in house urgent project.
Assist capacity upgrade for ALCALTEL,AVIAT and Huawei Equipments on Site.
Carried-out RFI, green field site survey (includes Line of Sight verification and site searching), and Technical Site Survey Report generation. Technical Site Survey Report generation.
Conducted STM-1 and E1 traffic migration .
Conducted in house 3rd Leg protection via OSN.
Performed installation of S series switch and ATN 950b as port expansion for Vindicator project.
Assist critical activities such as Huawei AG Card Insertion,Software and Patch Upgrade on MSC and Class A Sites.
Conduct inventory for vendor warehouses prior to mobilization and delivery of the equipments (Huawei, AVIAT, ALU and NEC).
Supervised and coordinated various subcontractors' installation and acceptance testing activities.
Performed and assist subcontractors for ALU MPR950 Software Upgrade for SLZ.
Performed technical site survey for LOS, location of the IDU and ODU antenna, power tapping point and grounding system.
Performed link connectivity via fiber and electrical needed for project solution.
Supervised, assist and performed installation, power tapping, power un-tapping, commissioning,integration, software, patch upgrade and dismantling of either indoor or outdoor equipments such as Huawei RTN Series from 620 to 900, Huawei CX600-X2&X8, OSN Series Mux(1500,2500,3500,7500 T16& T32). for Inner Core,NEC DMR 5000s,ALU EWY9400 Harris Stratex/Aviat Networks (PDH & IPPDH), ADX 100, ECI XDM Series (1000 to 3000).
Assist and conduct trouble shooting using BER, Power Meter,Optical Spectrum Analyzer, Frequency Analyzer, IP Ethernet Tester,Site Master, Light Source and Fiber Cut Connectivity Tester.
Supervised and assist subcontractors for eth AN insertion and traffic migration on site to ensure the success of the activities according to the MOP.
Conduct inventory for vendor warehouses prior to mobilization and delivery of the equipments (Huawei, AVIAT, ALU and NEC).
Supervised and supported various subcontractors' installation, acceptance testing, and troubleshooting activities.
Project Engineer
G.M.M.C.I
03.2009 - 12.2013
Attend pre-bid meeting and responsible for the rough estimate of the Telecom and Electrical.
Carried-out Radio Frequency Investigation (RFI), green field site survey (includes site searching, Line of Sight verification, and Path profile analysis), and Technical Site Survey Report generation.
Perform RFI Survey and Reports for Client Approval.Responsible and performed Path Loss and Cell Design (BTS1800,900,Wimax and 3G) for TSSR.
Prepare documents to be used in commissioning and integration of both Transmission and BTS side.
Responsible for the implementation of the of the FTK Projects ( installation of all electrical from source to PPBTS; installation and commissioning of therectifier; installation of the panel antenna,feeder cable, indoor and outdoor BTS equipments; installation of SDH/PDH microwave antenna,ODU, IF cables and IDU including all accessories).
Responsible for the commissioning and integration of the installed equipments .
Responsible and conduct series of testing for PAT/FAT for project turn over.
Perform hot swap of the antenna for traffic migration and BTS equipments for upgrade.
Perform troubleshooting on site such as link connectivity, upgrade malfunction, drive test and sectorized recognition of the panel antenna.
Manage and perform actual power tapping on site for permanent solution for both AC and DC.
Attend project site acceptance.
Prepare billing documents.
Perform power tapping and commissioning of Genset.
Perform set up of ACU and smoke sensors.
Prepare and manage the installation of the AMB (Antenna Mounting Bracket) for microwave and panel antenna.
Prepare and manage odu and genset pad installation including all accessories.
Education
Bachelor of Science - Electronics And Communication Engineer
Universirty of Nueva Caceres
Naga City
03.2006
Skills
Project Leadership and Management
Design Changes
Project Report Generation
Process flow familiarity
Planning and Implementation
Timely Project Completion
Kickoff Meetings
Customer Needs Assessments
Process Improvement Strategies
Project Records
Technical Expertise
Excellent attention to details
Accomplishments
Managed the remaining 194 links to complete the 714 links under Globe Vindicator Project in NCR and SLZ.
Managed to complete 495 links under Globe ZAP Project in NLZ, NCR and SLZ Regions.
Managed to complete 405 links under Globe BAU Project for NCR and SLZ Regions.
Managed to complete 141 links under Globe Genesis Project under SLZ Regions.
Managed to complete 35 links under Globe Baymax Project under SLZ Regions.
Managed to complete 95 links under Globe Colocs and Upgrade Project in NCR and SLZ Regions.
Managed to complete 26 links under Globe Common Infra Project in NCR and SLZ Regions.
Managed to complete 183 links under Globe Expansion Project in NCR and SLZ Regions.
Managed to complete 101 links under Globe I nterim MW Project under NCR and SLZ Regions.
Managed to complete 113 links under Globe New Site Build Project in NCR and SLZ Regions.
Managed to complete 8 links under Globe Broadband Project in NCR and SLZ Regions.
Managed to complete 11 links Under Globe IMC Project including the maintenance services in SLZ Region.
Managed to complete the 50 links Under Globe Managed Services Project including the maintenance services in NCR and SLZ.
Managed to complete the 92 links Under Globe Redeployment Project in NCR and SLZ.
Managed to complete the 101 high profile links Under Globe CAMAROQUE Project in SLZ.
Assisted vendors on their installations during Globe Tenure ( Huawei, Nokia, Alcatel, NEC and Aviat).
Managed to complete 50+ links for the installation of RBS600 and Mini Link as transport Equipment Under Ericson Smart Modernization Project.
Certification
Electronics Engineer License - 2006
CCNT, CISCO - 2015
Qualification
With 14 years of experienced in Telecom Industries.
Manage different Projects of Globe completing almost 1000 links.
Familiar with the process and flow of Globe Network.
With strong bond with Globe Proponents, TEO and Field Ops.
Familiar with the Globe network topology.
Strong leadership managing NCR and SLZ contractors.
Technical expertise in the RF side of MWR.
Technical analysis and suggest possible network solution.
Experienced on how to handle pressure with Globe.
Timeline
Regional Project Manager
Aviat Networks Philippines
03.2016 - Current
Transmission Engineer
Globe
01.2014 - 10.2015
Project Engineer
G.M.M.C.I
03.2009 - 12.2013
Bachelor of Science - Electronics And Communication Engineer
Universirty of Nueva Caceres
Similar Profiles
Marwan HanooshMarwan Hanoosh
Test Engineer at Aviat Networks (Redline Communications)Test Engineer at Aviat Networks (Redline Communications)