Seasoned Lineman with extensive experience in overhead line construction and electrical distribution systems, honed across employers like EESI and HEC. Excelled in emergency repairs and power line installation, leveraging skills in bucket truck operation and electrical safety. Proven leader in ensuring project success and safety, with a commitment to excellence and team collaboration.
Working as a lineman of CEBECO1Pinoy project electrification program as contracted by Centrade Sales Incorporated.
Working as a lineman (casual) distribution of CEBECO3 electric cooperative (under Pinoy Project Electrification Program)
Im working as a lineman of Visayan Electrec Company(VECO) under the supervision of X'former Incorporation (sub-contractor) of VECO.
Working as an electrician of MUG Department Lift l Dewatering Section .Installing of cable trays, controlpanels and lay-outing cables from substation down to underground at(minus 50 station location) substation control for the use of underground electrification.
Working as a lineman of some distribution line of NORSAMELCO Electrec coopirative in northern Samar
I was working as a lineman herein the Philippines with in 6 months and then we go to Malaysia for 2 months training and the part of training is how to use some equipments and procedures of installing OPGW at Live Line condition .And some safety precaution to adopt with the existing ACSR ground wire of TNB'sTransmssion line and then we proceed to Morroco for the job constructed by Three Arrows Inc. at the same position.
I was working as a lineman in the replacement of OHGW with OPGW to several existing transmission lines of Napocor under Tele-Communication System Upgrade and Expansion of NCC Project at Live line condition.
Working as a clearing crew of singlePhase Distribution line of cebeco3 in mountain barangay's in Toledo city
I was working as a lineman of 69kv line of NPC project of maasin so.Leyte to Baybay Leyte,, Abra de Ilog to Mamburao occ. Mindoro 69kv NPC project,,Santa Rosa to Talavera Nueva Ecija 69kv transmission line NPC project and working as electrician and wire terminator of some several substation project of NPC as the company contracted.In substation of Canamucan,Compostela and in Banilad Cebu and substation of Cruz na Daan,San Rafalel Bulacan project.And working as a rigger erector of antena tower in substation and erecting of alcatel telecommunications tower in Santiago,Isabela.