Summary
Overview
Work History
Education
Skills
References
TRAINING AND SEMINARS
VACCINATION ADMINISTERED
PERSONAL DATA
Timeline
Generic
HILARIO ENDIGADO AUDIJE

HILARIO ENDIGADO AUDIJE

Laguna

Summary

Achieved improved employee performance through effective welding training programs. Drove strategic initiatives that resulted in enhanced operational efficiency. Fostered an environment of innovation that supports ongoing company growth.

Overview

30
30
years of professional experience

Work History

TIG WELDER

Globetek Engineering Resource
Poland
09.2022 - 06.2023
  • Full weld of pipe tube 12 hours in a day, maintain a good working knowledge of welding, assist for fabricator, was assigned for fabricate a beam channel for support the panel. And use of oxi acetelyn to cut the plate and beam. Remove rough spot from work piece using grinder or hand pile and clean the work place before and after the work.
  • Poland

TIG WELDER

Daewoo Nigeria Limited
Nigeria
05.2021 - 03.2022
  • Full welding fabrication shop-carbon steel -10-12-20-36 Inc. Pipe spool. Root / hot pass Tig ER 70s- 6 with copping using 3.2/4 mm electrode. full welding of main pipe rock, carbon steel, spool elbow reducer, heavy wool pipe 10-12-24 Inc. Full welding of sub-rock stainless steel spool elbow reducer 4-8-10-20 inc. pipe with root pass filler ER316L ER308L ER304L, all Tig combination SMAW ESAB Electrode
  • Nigeria

TIG WELDER

Global IWI Arabia
Saudi Arabia
10.2016 - 12.2017
  • Full welding fabrication shop-carbon steel -10-12-20-36 Inc. Pipe spool. Root / hot pass Tig ER 70s- 6 with copping using 3.2/4 mm electrode. full welding of main pipe rock, carbon steel, spool elbow reducer, heavy wool pipe 10-12-24 Inc. Full welding of sub-rock stainless steel spool elbow reducer 4-8-10-20 inc. pipe with root pass filler ER316L ER308L ER304L, all Tig combination SMAW ESAB Electrode
  • Dubai Saudi Arabia

TIG WELDER

Shungchang Engineering & Const. Co. Ltd
Uzbekistan
04.2014 - 04.2015
  • Assign in fabrication shop welding of 2G, 5G, 6G full welding of 8” pipe and various pipe size at cooling system supply, fitting / welding of redesigned ramps and ladders. Full welding of carbon steel all size ½” 14 schedule 40-60 using filler metal ER70S5-6 for route pass to hot pass and E7016 for filling capping. Lay-out fabricates pipe support and install values and gasket, re-heat thick materials to required temperatures fits attachment connect hosses to gas wire to power source of equipment use welding operation.
  • Uzbekistan

TIG WELDER

IWI Global SDN.BHD
Malaysia
11.2011 - 08.2013
  • Full welding of stainless sch.40 from 1 to 4 dia. inching GTAW process all method are in WPS in highly. Full welding of small bore and big bore pipes through the process of GTAW SMAW in root pass, hot pass and capping. Repairing of small and big bore pipes joints welding of plate pipe support assist in fabrication and installation of pipe weld mapping
  • Malaysia

PIPE WELDER

Daewoo Engineering & Cons. CO.LTD
Alkhor, Qatar
10.2010 - 08.2011
  • Having the responsible of all technical query regarding piping work as full as built design and proposal of modification material take off and piping schedule shop fabrication. Erection and installation tie in preparation repair and fabrication of various pipe welding such as steel stainless, carbon st3l, which are compress air pipe, acetylene pipe, argon, carbon dioxide, liquefied petroleum gas, all main headers that supply in all of dry dock, nakilat ship yard repair, combine pump house, fire pump house 1, fire pump house 2, fabrication sea pier 1 and 2,3 & contaminated waste water plant, as per isometric drawing inter-connection of various process pipe welding Gtaw 1/2 diameter to 20 diameter sch. 40.
  • Alkhor Qatar

TIG WELDER

Hyundai Heavy Industries Chunjo Construction Co. Ltd.
Raslaffan
06.2009 - 06.2010
  • Assigned as Tig in Arc pipe welding for heavy wall fabrication shop specialized in carbon steel and stainless steel. Assigned as fabrication shop welding of pipe small bore and big bore also steel plate and tank joint depending on WPS of client suck stainless steel, carbon steel. using Gtaw Smaw process such 100% Radiographic test
  • Raslaffan

CODED WELDER

General Construction and Maintenance
South Africa
03.2008 - 09.2008
  • Working as Tig welder responsible for full welding carbon steel and stainless-steel big bore and small bore using GTAW SMAW. For stainless using filler 361L for root pass and 308E for filling capping, for carbon steel using 70s for root pass hot pass and 7018E for filling capping all position 2G,5G,6G, also welding dissimilar pipe using filler 309L all Tig and all Smaw process using 6010 root pass and 7018 for filling capping all process with 100% radiographic test.
  • South Africa

PIPE WELDER

AVB Rock Group KB
Buraidah
05.1993 - 02.2007
  • Full welding of precast plate I-Beam pressure vessel and water tank, assist of plate fitters tacks, full weld joint of plates, maintenance welding repair of equipment used in filling weld plates, dismantling, cutting of all pipe, lay-out installation and welding of pipes repaired was assigned in welding job grinding gas cutting steel preparation for welding. Assisting in lay-out.
  • Buraidah

Education

Secondary School - undefined

Kabulusan National High School
01-1985

Primary School - undefined

Kabulusan National High School
01-1980

Skills

Weld’s using filler rod stainless / carbon steel / alloy steel / mild steel

How to used cutting outfit

Driving Motor Vehicle

Team Building

Decision Making

References

  • Marlin, Szlander, +48512813690
  • Jacek, Klecebar, +48512249854
  • Mary Jane A., Rayosa, B.S.Agriculture, 09302949760

TRAINING AND SEMINARS

  • Authorized Gas Testing CBT Course Date : Oct. 31 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Mechanical Joint Integrity CBT Course Date : Oct. 26 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Managing Pressure & Leak Testing CBT Course Date: Oct. 13 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Working at Height CBT Course Date: Sept. 27 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Hazard Identification CBT Course Date: Sept. 27 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Hand Safety & Manual Handling CBT Course Date: Sept. 26 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Defensive Driving Refresher CBT Course Date: Oct. 11 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • None-Destructive Examination CBT Course Date: Oct. 7 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Hydrogen Sulphide Awareness CBT Course Date: Oct. 4 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Emergency Response CBT Course Date: Oct 3 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Lifting and Rigging Awareness CBT Course Date: Septm 28 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Confined Space Entry CBT Course Date: Sept. 29 2009 Place : Pearl Village Training Centre Ras Laffan, Qatar
  • Abrasive Wheels Date: Sept. 12 2018 Place : Idess Maritime Centre ( Subic ) inc
  • 5906 – Tropical Basic Offshore Safety Induction and Emergency Training with Breathing System and Travel Safety by Boat Date: Sept. 9 2018 - Sept. 11 2018 Place : Idess Maritime Centre (Subic) inc
  • Asbestos Awareness Date: Sept. 3 2018 Place: Atlas Engage
  • Opito Date: Sept. 30 2018 Place: International Minimum Industry Safety Training

VACCINATION ADMINISTERED

Vaccine Brand: Oxford AstraZeneca First Shot Date: May 27 2021 Second Shot Date: June 30 301 Booster Date: Jan 6 2022 Pfizer

PERSONAL DATA

  • Date of Birth : Jan. 14, 1968
  • Marital Status : Married
  • Nationality : Filipino
  • Height : 164 63 cm
  • Weight : 65 kg
  • Religion : Roman Catholic
  • Language : English / Tagalog

Timeline

TIG WELDER

Globetek Engineering Resource
09.2022 - 06.2023

TIG WELDER

Daewoo Nigeria Limited
05.2021 - 03.2022

TIG WELDER

Global IWI Arabia
10.2016 - 12.2017

TIG WELDER

Shungchang Engineering & Const. Co. Ltd
04.2014 - 04.2015

TIG WELDER

IWI Global SDN.BHD
11.2011 - 08.2013

PIPE WELDER

Daewoo Engineering & Cons. CO.LTD
10.2010 - 08.2011

TIG WELDER

Hyundai Heavy Industries Chunjo Construction Co. Ltd.
06.2009 - 06.2010

CODED WELDER

General Construction and Maintenance
03.2008 - 09.2008

PIPE WELDER

AVB Rock Group KB
05.1993 - 02.2007

Primary School - undefined

Kabulusan National High School

Secondary School - undefined

Kabulusan National High School
HILARIO ENDIGADO AUDIJE