Summary
Overview
Work History
Education
Skills
Timeline
Generic
Hermio Jr. Cortezano

Hermio Jr. Cortezano

Engineering
Paranaque City

Summary

Goal-oriented business development and project leader with expertise in managing the full project development lifecycle, networking and generating revenue. In-depth technical knowledge, conceptual understanding and compliance experience. Strong communicator, planner and analytical thinker. Demonstrated achievements in bringing in new projects, streamlining processes and cutting costs. Forward-thinking and focused with a persistent and tenacious nature. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level any Job position. Ready to help team achieve company goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

17
17
years of professional experience
9
9
years of post-secondary education
1
1
Language

Work History

Project Development Officer

Department of Social Welfare and Development
Muntinlupa City
09.2010 - Current
  • Led key projects while managing timelines and meeting deadlines within budgetary limits.
  • Optimized business and management practices to improve all facets of project development and execution.
  • Developed and implemented project plans and budgets to ensure successful execution.
  • Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Reported regularly to managers on project budget, progress and technical problems.
  • Analyzed project performance data to identify areas of improvement.
  • Monitored project progress, identified risks and took corrective action as needed.

Air Conditioning Technician

FCI Citimall Shopping Center
Tuguegarao City
06.2009 - 03.2010
  • Communicated with supervisors to gather system malfunctions symptoms and locations for diagnosis and correction.
  • Tested capacitors, transistors and transformers for proper continuity and resistance.
  • Maintained orderly stock of replacement components with 8 inventory units.
  • Replaced dirty filters throughout system of air handlers every 1 month following routine maintenance schedule.
  • Soldered and rewired internal electrical components of air handlers and condensers.
  • Diagnosed faults in electrical and mechanical components to return units to full operating capacity within 24 hours of maintenance request.
  • Cleaned sheet metal ducts, evaporator coils, drip pans, axial and centrifugal fans and capacitor-start and resistance-start motors.
  • Increased longevity of HVAC systems by performing preventive maintenance.
  • Utilized pressure gauges and soap-and-water solutions to test pipe and tubing joints for leaks.
  • Maintained environmental conditions by rebuilding and replacing faulty components.
  • Responded to emergency HVAC service requests promptly, finding swift resolutions.

Production Engineer

Rohm Electronics Philippines Inc.
Carmona
03.2006 - 09.2008
  • Created engineering documentation for manufacturing processes, equipment specifications and change notices.
  • Decreased in-house production issues by establishing and coordinating sub-contracting and outsourcing requirements and processes.
  • Supervised entire production process and prepared proper documentation for dispatch.
  • Maximized productivity by 100% by developing and implementing innovative production processes for new and existing products.
  • Investigated and proposed corrective actions for quality issues.
  • Inspected all machines and equipment and provided necessary repairs.
  • Analyzed product and process and provided actionable solutions for changes to processes, products or quality standards.
  • Communicated with other team members to enhance process and performance.
  • Identified risk mitigation actions to reduce injuries, accidents and hazards in production environment.

Education

Associate of Applied Science - Air Conditioning, And Refrigeration Installation And Repair

TESDA
Tuguegarao City, Cagayan
10.2008 - 02.2009

Bachelor of Science - Electronics And Communications Engineering

University of Saint Louis Tuguegarao
Tuguegarao City, Cagayan
06.2000 - 03.2005

High School Diploma -

Cagayan National High School
Tuguegarao City, Cagayan
06.1996 - 03.2000

Skills

    Data Entry

undefined

Timeline

Project Development Officer

Department of Social Welfare and Development
09.2010 - Current

Air Conditioning Technician

FCI Citimall Shopping Center
06.2009 - 03.2010

Associate of Applied Science - Air Conditioning, And Refrigeration Installation And Repair

TESDA
10.2008 - 02.2009

Production Engineer

Rohm Electronics Philippines Inc.
03.2006 - 09.2008

Bachelor of Science - Electronics And Communications Engineering

University of Saint Louis Tuguegarao
06.2000 - 03.2005

High School Diploma -

Cagayan National High School
06.1996 - 03.2000
Hermio Jr. CortezanoEngineering