Summary
Overview
Work History
Education
Skills
Affiliations
Certification
COUNTRY OF EXPERIENCE
Timeline
Generic
Henry Haro Tan

Henry Haro Tan

Architect
Iloilo City

Summary

Architectural professional equipped with strong background in design, project management, and sustainable building practices. Adept at leading collaborative teams to deliver innovative solutions that meet client needs and adapt to project demands. Skilled in AutoCAD, Revit, and BIM software, with keen eye for detail and passion for creating functional, aesthetically pleasing spaces. Known for reliability, adaptability, and results-driven approach.

Total Years of Experience: 23 Years Design and Consultancy specialized in High Rise Condominium, Hotel, Commercial Establishment, Housing Projects, and Government Projects.

- Well verse in Coordinating with the Designer, Owner and Contractor during construction.

- Managing documents for ISO Approval.

- Capable of sequencing work to maintain existing operations.

- Can cope and give solutions in site discrepancy during construction. - Planning and Evaluator of local ordinances in National Building Code and Plumbing Design.

- With experience in Design, Plan and Construction of General Hospitals.

- Specialist in Interior Fit out work, modular system cabinetry in wardrobe and kitchen.

- With experience in Urban and Regional Development Planning and Research.

- Planning and Evaluator of Land Use and Zoning.

Overview

18
18
years of professional experience
4
4
Certifications

Work History

Architect, Environmental Planner & Plumbing Designer

Local Government Unit of Oton
03.2022 - Current

Work Projects:

1. Three-Storey Emergency Response Building at Brgy. Poblacion, Oton, Iloilo

2. Two-Storey Oton Public Market at Brgy. Poblacion, Oton, Iloilo

3. Four-Storey Oton Municipal Building at Brgy. Poblacion Oton, Iloilo

4. Oton Super Health Center at San Antonio, Oton, Iloilo

5. Two-Storey Oton Municipal Health Unit Facility at Brgy. Poblacion, Oton Iloilo

Scope of Works: Design & Plan of Building, Preparation of Detailed Architectural and Engineering Drawings, Preparation of Bill of Materials and Program of Works, and Supervision during Construction Phase.

  • Attended team meetings to resolve technical and project issues and review project schedules.
  • Coordinated and adhered to project deadlines, schedule coordination and operating budgets.
  • Coordinated with government agencies to obtain necessary permits while ensuring compliance with applicable guidelines and regulations.
  • Drew maps, designs and other representations of construction plans to scale by hand or using AutoCad, Lumion, & Sketch Up.
  • Applied creative problem-solving skills to address unique challenges in the architectural design process.
  • Managed multiple projects simultaneously while maintaining strict deadlines and quality control standards for deliverables.
  • Facilitated stakeholder meetings for open communication regarding environmental concerns and project goals, fostering collaborative decision-making processes.

Personal Projects:

1. Two-Storey Commercial Building at Brgy. Poblacion West, Oton, Iloilo

2. Four-Storey Commercial Building at Brgy. Abilay Norte, Oton, Iloilo

3. Two Bedroom Residential Building at Brgy. 18 Santillian St., Poblacion Ilaya, Passi City

4. Two Bedroom Residential Building with Swimming Pool at Sitio Lungaw, Brgy Imbang Grande, Passi City

5. Two Bedroom Residential Building with Swimming Pool at Sitio Lungaw, Brgy Imbang Grande, Passi City

6. Two-Storey Residential Building with Swimming Pool at Brgy. Buray, Oton, Iloilo

7. Two-Storey Residential Building at Monte Rosa Subdivision, Mandurriao, Iloilo City

Scope of Works: Design & Plan of Building, Preparation of Detailed Architectural and Engineering Drawings, Preparation of Bill of Materials and Program of Works, and Supervision during Construction Phase.

  • Maintained strong communication with clients throughout the design process to ensure alignment between their vision and the final product.
  • Coordinated with local authorities to ensure compliance with zoning laws and building codes.
  • Enhanced client satisfaction by delivering personalized design solutions that met specific needs and preferences.
  • Developed detailed architectural models to provide clients with clear visualizations of proposed projects.
  • Integrated green building practices into designs, contributing to creation of energy-efficient and environmentally friendly structures.

Project Architect, Area Supervisor

F. Gurrea Construction Incorporated
11.2019 - 12.2021

Projects:

1. Six-Storey Heart-Lung Specialty Building at Mandurriao, Iloilo City

2. Four-Storey I-CARE Building at Mandurriao, Iloilo City

3. Four-Storey 8 Classroom School Building at Mandurriao, Iloilo City

Scope of Works: Design & Supervision of Building, Preparation of Detailed Construction Drawings, and Program of Works.

  • Managed multidisciplinary teams to successfully complete complex projects within tight deadlines.
  • Maintained up-to-date knowledge of building codes and regulations, ensuring compliance in all projects.
  • Conducted site visits to monitor progress, identify potential issues, and recommend corrective actions when necessary.

Technical Architect, Site Architect

Bluu Qatar
03.2017 - 10.2019

Projects:

1. Al Baker Hotel (53-Storey) Tower 1 Novotel @ Doha, Qatar

2. Al Baker Hotel (53-Storey) Tower 2 Sofitel @ Doha, Qatar

Scope: Interior Fit-out Work of 53 Storey Hotel, Preparation of Construction Detailed Drawings of Interior Design, Bill of materials and Program of Works, Supervision during Interior fit-out Work Installation.

  • Presented design proposals persuasively during client meetings, fostering trust in our firm''s capabilities.
  • Collaborated with clients to determine project specifications and scope.
  • Collaborated with cross-functional teams to design and implement effective software solutions, resulting in increased customer satisfaction.
  • Managed subcontractors effectively to maintain high-quality workmanship throughout the project lifecycle.
  • Coordinated with multidisciplinary teams to ensure seamless integration of architectural, structural, and MEP systems.
  • Attended team meetings to resolve technical and project issues and review project schedules.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Designed custom furniture adapted to floor plans, working closely with multiple furniture vendors.

Documentation Head/Architectural Coordinator, Space Planner

Kitchen Culture / KHL Marketing Asia Pacific PTE Ltd.
04.2010 - 08.2016

Projects:

  • Under Far East Organization Centre PTE LTD

1. Alba Condominium (20-Storey) at Cairnhill Rise

2. Boulevard Vue Residences (32-Storey) @ Orchard Boulevard

  • Under Maki and Associates & DP Architects PTE LTD

1. 33-Storey Condominium - Skyline Orchard

Scope: Interior Fit-out Work of the Building, Preparation of Construction Detailed Drawings of Interior Design, Bill of materials and Program of Works, and Supervision during Interior fit out work installation.

  • Supported successful project completion with thorough quality control assessments and timely issue resolution.
  • Reduced errors during construction by proactively addressing potential issues identified during design coordination meetings.
  • Collaborated with clients to develop customized architectural solutions that met their unique needs and preferences.

Associate Architect

TM Architects
01.2008 - 02.2010

Projects:

1. Seven-Storey Condominium, Iloilo City Philippines

2. Two-Storey Pension House and In-land Resort Phase II, Iloilo, Philippines

3. Residential Building with Basement, Iloilo, Philippines

4. Two-Storey Commercial Building, Iloilo, Philippines

5. Two-Storey Residential Building, Iloilo, Philippines

Scope of Works:

  • Associate Designer and Head of project Implementation
  • Site supervision and coordinate according to drawing
  • Implementation of drawings as per site measurements
  • Design and Preparation of Drawings and Estimates
  • Collaborate with other professionals and coordination with Clients
  • MEP Coordination
  • Preparing Shop drawings

Education

Diploma - Urban And Regional Planning

University of The Philippines Visayas
General Luna St., Iloilo City
04.2001 -

Bachelor of Science - Architecture

University of San Agustine
General Luna St., Iloilo City
04.2001 -

Skills

AutoCAD expertise

Interior design

Project planning

Project management

Space planning

Building code compliance

Technical architecture design

Sustainable design

Land use planning

Freehand sketching

Urban planning

Value engineering

Cost estimation

Microsoft office expert

Green building

Accessibility design

Bidding procedures

Bid proposals

GIS, arcview, and arcinfo

Architectural design

Community planning

Revit proficiency

Site and environmental analysis

SketchUp

Building codes compliance

Attention to detail

Problem-solving

Multitasking

Adaptability

Professionalism

Decision-making

Analytical thinking

Affiliations

  • United Architects of the Philippines
  • National Master Plumber Association of the Philippines
  • Office of the Building Officials

Certification

Architect (Prof. Lic. 0018874)

COUNTRY OF EXPERIENCE

  • Philippines
  • Singapore
  • Qatar

Timeline

Architect, Environmental Planner & Plumbing Designer

Local Government Unit of Oton
03.2022 - Current

Project Architect, Area Supervisor

F. Gurrea Construction Incorporated
11.2019 - 12.2021

Technical Architect, Site Architect

Bluu Qatar
03.2017 - 10.2019

Documentation Head/Architectural Coordinator, Space Planner

Kitchen Culture / KHL Marketing Asia Pacific PTE Ltd.
04.2010 - 08.2016

Associate Architect

TM Architects
01.2008 - 02.2010

Diploma - Urban And Regional Planning

University of The Philippines Visayas
04.2001 -

Bachelor of Science - Architecture

University of San Agustine
04.2001 -
Henry Haro TanArchitect