Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Griffin J. Suarez

Griffin J. Suarez

Field Service Technician / Mechanical Millwright Supervisor / Mechanical Maintenance
City of Naga, Cebu

Summary

To widen my experience and to be utilized in a competent company with the different job/skills related to my field of specialization, specifically in Thermal Power Plant, Geothermal Power Plant, Cement Plant and Desalination Plant Construction Projects and Operation and Maintenance. Determined to deliver the works on schedule with Safety, Quality and Competency. Versatile and skillful in troubleshooting with top-notch repair knowledge and technical expertise. Accustomed to reviewing highly technical documentation to assess scope and develop repair strategy. Focused, reliable and results-driven with good safety records and attention to detail.

Overview

31
31
years of professional experience

Work History

Field Service Technician / Technical Advisor

BABCOCK and WILCOX APAC (Present)
07.2024 - 8 2024
  • (ESP) UNIT #1 SHUT-DOWN WORKS
  • Responsible for inspection and to provide records to Client prior to execute corrective works.
  • Doing inspections of ESP’s mechanical components such as; Gas Distribution screen, Collecting and Discharge Electrodes, Rapping-system, Insulators, Hoppers and Baffles, Heating elements, Discharge piping prior to execute corrective works.
  • Gathering of operation data from 25% ~ 100% load as per designed operation parameters for further understanding of the Root cause of failures most likely of its Electrical filtration components and Gas flow dynamic.
  • Doing analysis, evaluating, troubleshoots and implementing recommendations.
  • Give Technical Advice and Recommendations for mechanical Corrective works to be implemented for the purpose of improving the life span of the aging ESP.
  • Give Technical Advice and Recommendations for the Corrective adjustment of the system’s operation for the purpose of improving the efficiency of the ESP as per design parameters.
  • Assisting on Narrative procedure meeting to ensure that the work sequences with the provided Checklist will be followed and executed safely.
  • Site monitoring of works and ensure proper execution and quality of the work and up-to target schedule.
  • Conduct ESP’s Static and Dynamic tests such as Airlock / Air load test.
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters.
  • Increased customer satisfaction by providing prompt and efficient on-site support for technical issues.
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs.

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
04.2024 - 06.2024
  • B&W 89-G COAL, 41, 42 & 43 RETROFITTING PROJECT & COMMISSIONING
  • POSCO PLANTEC POHANG STEEL OUTAGE WORK FOR BLAST FURNACE 41, 42 & 43
  • Assigned to provide Technical Advice to Client for the Vertical Rolling Mills (VRM) Re-construction / Retrofitting works up to Commissioning phase of the project.
  • Technical Advising and recommending works for the purpose of improving the project especially in mechanical construction systematic works, detailed sequence, critical path identification on schedules and drawing interpretations
  • Assisting on Narrative procedure meeting to ensure that the work sequences with the provided Checklist will be followed, executed safely and as per design drawings and target schedule.
  • Checked the procedures prepared by the Third-party contractor
  • Window of information for the Site and Design matters.
  • Coordinated to Design section for some Design Queries.
  • Supportive work to ensure Quality output and progress.
  • Site monitoring of works and ensured the work was up to target schedule.
  • Hands-on site control of re-construction / retrofitting activities as a Lead person.
  • Prepare Commissioning parameters and schedule for site activities especially Static- test data collection prior to Dynamic test (Load-test), Line-up valves as per P&ID.
  • Coordination of PTWs, manpower arrangements and Equipment inspection prior to testing.
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters.
  • Enhanced system performance by conducting thorough technical assessments and providing expert recommendations.
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs.

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
02.2024 - 03.2024
  • CHINA-BEPG ZGM80G-III COAL Mill #A~#B OVERHAULING WORKS OF ROLLERS.
  • GN POWER KAUSWAGAN UNIT #4
  • KAUSWAGAN, LANAO DEL NORTE, Responsible for providing Technical Advice to the Client for the overhauling of the Roll wheels.
  • Preparing procedures for the Roll-wheel overhauling works.
  • Assisting on Narrative procedure meeting to ensure that the work sequences with the provided Checklist will be followed / executed safely and as per design drawings and O&M manual and in-line with the target schedule
  • Hands-on site control for the overhauling / re-construction of Roll-wheels and acting as a Lead person
  • Inspect and confirm that all design clearances and torques had been met as per design to ensure quality of the works
  • Giving Technical Advice and recommendation specifically for the Bearing insertion and Roller tire proper insertion methods and sequence
  • Conduct Site Acceptance Test as per Roll-wheel ITPs with the Client
  • Making Final-report as per Check-off items and submit to the Client
  • Coordinated to Design section for some Design Queries / discrepancies
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs.

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
01.2024 - 02.2024


  • MHPS-MVM28F COAL, #A~#E SHUT-DOWN WORK + COMMISSIONING
  • TEAM ENERGY, PAGBILAO POWER STATION UNIT #3
  • IBABANG POLO, PAGBILAO, QUEZON PROVINCE, PHILIPPINES, Assigned for the Inspection and Technical-recommendations prior to proceed
  • Corrective works for the Mill’s Classifier assembly, Coal air fuel Outlet valves
  • Grinding-mechanisms, Loading-unit, Lube-oil unit, Oil cooler, Pyrite reject system, and Drive unit’s precision alignment to Main motor
  • Gathering Operation data of the Mill’s 25% ~ 100% load for analyzation, evaluation, troubleshoots and recommendation for operational adjustments
  • Checked the procedures prepared by the Third-party contractor for corrective works
  • Support and monitor the works to ensure Quality output, progress, also ensuring that the work was up to a target schedule
  • Hands-on site control of the corrective works / activities as a Lead person
  • Prepare Commissioning parameters and schedule and site activities specifically
  • Static-test data collection prior to Dynamic test (Load-test), Line-up valves as per
  • P&ID, Manpower arrangements, Equipment inspection prior to Testing, Coordination of permit to work
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters mostly of the Coal fineness and Air flow dynamic
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs.

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
08.2023 - 09.2023


  • BW89G+ ROTATING CLASIFFIER COAL, #A ~ #F SHUT DOWN WORKS
  • Assigned for the Inspection and Technical-recommendations prior to proceed corrective works for the Mill’s Classifier assembly, Coal air fuel Outlet valves Grinding-mechanisms, Loading-unit, Lube-oil and Hydraulic oil unit, Oil cooler, Pyrite reject system, and Drive unit’s precision alignment to Main motor
  • Gathering Operation data of the Mill’s 25% ~ 100% load for analyzation, evaluation, troubleshoots and recommendation for operational adjustments
  • Checked the procedures prepared by the Third-party contractor for corrective works
  • Support and monitor the works to ensure Quality output, progress, also ensuring that the work was up to a target schedule
  • Hands-on site control of the corrective works / activities as a Lead person
  • Prepare Commissioning parameters and schedule and site activities specifically
  • Static-test data collection prior to Dynamic test (Load-test), Line-up valves as per
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters mostly of the Coal fineness and Ari low dynamic
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs.

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
07.2023 - 08.2023
  • Responsible to provide Inspection record to Client prior to execute corrective works
  • Doing inspections of ESP’s mechanical components such as; Gas Distribution screen, Collecting and Discharge Electrodes, Rapping-system, Insulators, Hoppers and Baffles, Heating elements, Discharge piping prior to execute corrective works
  • Gathering of operation data from 25% ~ 100% load as per designed operation parameters for further understanding of the Root cause of failures most likely of its
  • Electrical filtration components and Gas flow dynamic
  • Doing analysis, evaluating, troubleshoots and implementing recommendations
  • Give Technical Advice and Recommendations for mechanical Corrective works to be implemented for the purpose of improving the life span of the aging ESP
  • Give Technical Advice and Recommendations for the Corrective adjustment of the system’s operation for the purpose of improving the efficiency of the ESP as per design parameters
  • Assisting on Narrative procedure meeting to ensure that the work sequences with the provided Checklist will be followed and executed safely
  • Site monitoring of works and ensure proper execution and quality of the work and up-to target schedule
  • Conduct ESP’s Static and Dynamic tests such as Airlock / Air load test
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs
  • PHOTO, Responsible to provide Inspection record to Client prior to execute corrective works
  • Doing inspections of ESP’s mechanical components such as; Gas Distribution screen, Collecting and Discharge Electrodes, Rapping-system, Insulators, Hoppers and Baffles, Heating elements, Discharge piping prior to execute corrective works
  • Gathering of operation data from 25% ~ 100% load as per designed operation parameters for further understanding of the Root cause of failures most likely of its
  • Electrical filtration components and Gas flow dynamic
  • Doing analysis, evaluating, troubleshoots and implementing recommendations
  • Give Technical Advice and Recommendations for mechanical Corrective works to be implemented for the purpose of improving the life span of the aging ESP
  • Give Technical Advice and Recommendations for the Corrective adjustment of the system’s operation for the purpose of improving the efficiency of the ESP as per design parameters
  • Assisting on Narrative procedure meeting to ensure that the work sequences with the provided Checklist will be followed and executed safely
  • Site monitoring of works and ensure proper execution and quality of the work and up-to target schedule
  • Conduct ESP’s Static and Dynamic tests such as Airlock / Air load test
  • Ensuring and confirming that the Machine operates efficiently as per O&M manual and by its parameters
  • Submit final reports to the Client, promoting and marketing BWA parts and equipment as a replacement for the OEMs., ENGINEERING CORPORATION PHILIPPINES
  • MAK-BAN 4 x 55MW GEOTHERMAL POWER PLANT REHAB-PROJECT PHASE-2

Mechanical Technical Advisor / Mechanical Commissioning

MITSUBISHI HITACHI POWER SYSTEM / MITSUBISHI POWER LIMITED
08.2019 - 05.2023
  • CIREBON-2, 1 x 1000MW-CFPP PROJECT, ULTRA-SUPER CRITICAL BOILER
  • PT CIREBON ENERGI PRISARANA
  • Assigned to provide Technical Advice to the Consortium partner for the Construction up to Commissioning Phase of the project
  • Assigned in the construction of Boiler Main Structure up to the Lifting and alignment of Super Main Girders
  • Assigned in the construction and Site Acceptance Test of Maintenance Hoist packages such as Pulverizer Hoist, Burner Hoist, APH Hoist, Boiler Hatch Hoist and Fans Hoist
  • Assigned in the construction of Air and Gas System Packages such as Regenerative Air Preheaters, Fans, Pumps and Blowers, Ducting and Dampers and Sub-piping
  • Assigned in the construction of Combustion System Packages such as Coal Silos, Coal Feeders and Gates, Coal Pulverizers, Coal and Fuel Burners, Coal and Fuel piping and Boiler Clean-up devices (Soot blowers and Bottom ash SSC conveyor)
  • Technical Advising and recommending works for the purpose of improving the project especially in mechanical construction systematic works, detailed sequence, critical path identification on schedules and drawing interpretations
  • Assisted on Narrative procedure meeting to ensure that the work sequences provided by the consortium partner will be executed safely and as per target schedule
  • Checked the procedures prepared by the Consortium partner
  • Window of information for the Site and Design matters
  • Coordinated to Design section for some Design Queries
  • Supportive work to ensure Quality output and progress
  • Site monitoring works and ensured the work was up to target schedule
  • Hands-on site control of all related activities for erection and installation Procedures
  • Progress Measurement Procedures, NCR, MCC, Punchlist, etc
  • Preparation for Commissioning site activities especially for Oil flushing, Air flushing, Motor Solo-run Test, Equipment No-load and Load Test, manpower arrangements, equipment inspection and coordination of Permit to Work prior to testing and Start-up operation
  • Assigned on the As-built drawing preparation for Civil, Mechanical, and E & I drawings, and officially submitted to Client
  • Doing construction side work for FGD package such of Boost-up fan, Gas Preheater and Ball Mill System
  • Responsible for the Plant’s maintenance works, Corrective, Preventive and On-line requested actions during operation troubles.

Mechanical Maintenance Technician Foreman

BRY-51 Construction & Manpower Supply
11.2017 - 01.2019
  • 51 CONSTRUCTION AND MANPOWER SUPPLY
  • APO CEMEX CEMENT PLANT / CEMEX PHILIPPINES
  • Assigned to a various Preventive and Corrective Action works (Plant-wide) on Conveying systems such as Belt Conveyors, Pan and Bucket Conveyors, Drag chain conveyors, Air slide box, Bridge reclaimer and Boom Stocker / Reclaimer
  • Responsible to a various Overhauling works for Gear box, Fans, Coal mills, Raw mills, Ball mills and various types of pumps
  • Doing various Fabrication works such as Ball mill Partition screens, Slide gates, Slide box, Hoppers and Chutes and impellers fabrications for Fans and Blowers
  • Doing a Daily maintenance (preventive and corrective maintenance and on-line actions) task as per work orders in Plant-wide
  • Responsible for Critical task execution such as Bearing replacement, Impeller replacement, various Coupling precision alignments, Belt and Chain drives alignment, Overhauling of Hydraulic and Pneumatic cylinders, Pressure block, Compressors, Oil-separators and Purifiers
  • Take reading and records for Rotating-equipment Vibrations and Gear box Roots and Back-lush and Bearing clearances as per Bearing classifications
  • Daily routine Work-patrol as Plant-wide.

Mechanical Supervisor

Korean Trading and Industries, KTI-Philippines Inc
08.2016 - 09.2017
  • PHILIPPINES INCORPORATION
  • ABOITIZ THERMA VISAYAS, 2 x 170MW CFPP PROJECT
  • BATO, Assigned in the construction and installation of Boiler Air and Gas System Packages such as Regenerative Air Preheaters, Gas Recirculation Fans, Force Draft Fans
  • Induce Draft Fans, lube Oil Units and Oil-Coolers, Burners and Soot Blowers
  • Site supervising and hands-on, work monitoring, especially equipment erection and installation
  • Checked the drawings, made some modifications in reference to the approved standards due to site conditions and submitted report to design section for the drawing changes
  • Submittal of work schedule for sub-contractor’s reference
  • Prepared material tracking status for the above system especially equipment, piping materials, and structures, and relayed the information to the sub-contractors
  • Coordination to vendors regarding material shortages, drawing modification requests, to prevent delays in construction and handover to operation
  • Prepared site inspection report on the areas that were handed over by Civil
  • Department, prior to start Mechanical works, and ensure all the affected dimensions were as per latest revision drawing
  • Site walkthrough, inspection in accordance in Erection Completion Activities, coordination to client with respect to the knowledge of the systems involved
  • Site clearing on punch items that has been commented on by the client.

Mechanical Supervisor

MITSUBISHI HEAVY INDUSTRIES, NAGSAKI, JAPAN
09.2015 - 12.2015
  • PAITON-3 FINAL WARRANTY WORKS
  • Assigned in the field supervision for the Piping installation works, testing and restoration of the completed test packages for piping, Replacement of failed Hydraulic Pipe supports.
  • Scheduling and planning for the priorities for testing based on Commissioning section’s target schedule.
  • Checking / Approving Test Packages for Engineering Review
  • Hands-on site control of all related activities for erection and installation Procedures
  • Progress Measurement Procedures, NCR, MCC, Punchlist, etc
  • Coordination to subcontractor’s Engineering Department for revisions of the packages and other engineering matters, codes, and procedures
  • Coordination to Design Section for Field Change Notices due to site conditions
  • Coordination to Construction Group regarding installation set-up with regards to the
  • Test Package requirements
  • Conduct close monitoring and finalize Observation Reports during operation conditions.

Mechanical / Millwright Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
05.2014 - 11.2014
  • RABIGH IWSPP-2 PROJECT, 2 x 100MW AND RO/DESALINATION PLANT
  • Assigned in the RO/Desal field Supervision for the Erection and Installation package such as HVAC System, Sea Water Feed Pumps, Back-wash Pumps, ERT Multistage Pumps, 1st and 2nd Pass Pumps, Micron Filters, RO Trains Pressure Vessels, Dual Media Filter, Brine Pumps and Chemical Dosing Pumps
  • Hands-on for all precision alignment, Centering and leveling of equipment
  • Technical Advising and recommending works for the purpose of improving the project especially in mechanical construction systematic works, detailed sequence, critical path identification on schedules and drawing interpretations
  • Assisted on Narrative procedure meeting to ensure that the work sequences provided by the consortium partner will be executed safely and as per target schedule
  • Checked the procedures prepared by the Contractors
  • Window of information for the Site and Design matters
  • Coordinated to Design section for some Design Queries
  • Supportive work to ensure Quality output and progress
  • Site monitoring works and ensured the work is up to target schedule
  • Hands-on site control of all related activities for erection and installation Procedures
  • Progress Measurement Procedures

Millwright Supervisor / Commissioning Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
01.2011 - 04.2012
  • PAITON-3, 1 x 860MW SUPER CRITICAL BOILER
  • Assigned in Boiler Auxiliaries on field Supervision for the Erection and Installation package such as MVM250-Coal Pulverizer unit #A ~ #F, Coal Feeders and Coal Gates, Pyrite Reject Hoppers, Lube-oil units and Hydraulic units, Oil coolers and Pumps, Seal air fans, Soot Blowers and sluggers.
  • Doing side-works for the erection and installation of Arvos Regenerative Air Preheater and Air and Gas Fans and Burners.
  • Technical Advising and recommending works for the purpose of improving the project especially in mechanical construction systematic works, detailed sequence, critical path identification on schedules and drawing interpretations
  • Checked the procedures prepared by the Contractors
  • Coordinated to Design section for some Design Queries
  • Supportive work to ensure Quality output and progress
  • Site monitoring works and ensured the work is up to target schedule
  • Hands-on site control of all related activities for erection and installation Procedures
  • Safety and Progress
  • Assit Commissioning parameters and schedule and site activities specifically Static- test data collection prior to Dynamic test (Load-test), Line-up valves as per P&ID
  • Manpower arrangements, Equipment inspection prior to Testing, Coordination of permit to work
  • Assigned for the task as a Maintenance Supervisor during plant operation.

Millwright Supervisor / Commissioning Maintenance Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
09.2009 - 12.2010
  • SHUQAIQ-2 IWPP PROJECT, 3 x 280MW AND RO/DESALINATION PLANT
  • Plant-wide assignment designated as Mechanical Commissioning Maintenance
  • Supervisor during Commissioning stage assigned to perform Oil Flushing, Water Flushing, Air blowing and Steam blowing
  • Engaged to a multiple Tank cleanings and Chemical handlings
  • Hands-on site control of all related mechanical commissioning activities at site following the Standard Procedures, PTWs and Safety during testing
  • Prepare commissioning parameters and schedule for site activities specifically Static-test data collection prior to Dynamic test (Load-test), Line-up valves as per
  • P&ID, Manpower arrangements, Equipment inspection prior to Testing, Coordination of permit to work
  • Assigned as a Mechanical Maintenance Supervisor during Commissioning Period up to Plant operation and engaged to a various equipment testing and system’s Start- up, also doing the task of a Local Operator
  • Hands-on of various Troubleshooting and equipment overhauling such for Pumps, Fans, Blowers, Ro/Desal-Pressure Vessel Trains, Micron and DMF Filters, RO- Seawater pumps and Plant Cooling Water Pumps, CCCW Pumps, Condensate Pumps, Boiler Clean-up devices, Burners, ESP and Fly Ash system, Pneumatics and
  • Hydraulics and Intake area Traveling Van-screen and responsible for Precision alignment.

Millwright Supervisor / Commissioning Maintenance Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
05.2007 - 06.2009
  • RABIGH IWSPP PROJECT, 2 x 100MW AND RO/DESALINATION PLANT
  • Assigned in the Boiler Unit #1 up to Unit #9 and Flue Gas Desulfurization Plant (FGD) Supervising for the Erection and Installation packages such as for Force Draft Fans, Howden Horizontal-flow Regenerative Air Preheaters, Burners, Soot blowers and various water and oil pumps
  • Supervising the Erection and Installation packages for FGD such as Ball mills, Belt and Bucket Conveyors, Emergency Tank, Receiving Hoppers, Vibrating Screens, Gypsum Vacuum drums, Absorber, Pumps and Compressors
  • Hands-on for all Precision alignment and Centering and leveling of equipment
  • Technical Advising and recommending works for the purpose of improving the project especially in mechanical construction systematic works, detailed sequence, critical path identification on schedules and drawing interpretations
  • Checked the procedures prepared by the Contractors
  • Coordinated to Design section for some Design Queries
  • Supportive work to ensure Quality output and progress
  • Site monitoring works and ensured the work is up to target schedule
  • Hands-on site control of all related activities for erection and installation Procedures and design tolerances
  • Prepare commissioning parameters and schedule for site activities specifically
  • Static-test data collection prior to Dynamic test (Load-test), Line-up valves as per
  • P&ID, Manpower arrangements, Equipment inspection prior to Testing, Coordination of permit to work
  • Assigned as a Mechanical Maintenance Supervisor during Commissioning Period up to Plant operation and engaged to a various equipment testing and system’s Start- up, also doing the task of a Local Operator
  • Hands-on of various Troubleshooting and equipment overhauling such for Pumps, Fans, Blowers, Ro/Desal Pressure Vessel Trains, Micron and DMF Filters, RO-Seawater pumps and Plant Cooling Water Pumps, CCCW Pumps, Condensate Pumps, Boiler Clean-up devices, Burners, ESP and Fly Ash system, Pneumatics and Hydraulics and Intake area Traveling Van-screen and responsible for Precision alignment
  • Responsible for Plant’s Preventive and Corrective Maintenance Actions.

Millwright Leadman

TDK- Taihei Alltech Construction Philippines
02.2006 - 08.2006


  • PNOC-EDC 1 x 40MW GEOTHERMAL POWER PLANT PROJECT, PATAAN, MAILUM, BAGO CITY, NEGROS OCCIDENTAL, PHILIPPINES,
  • Hands-on responsibilities for the Erection and Installation of Steam Turbine, Generator, Condenser, Hot well pumps, Main Oil Tank, Oil Separator, Turning oil pump, Emergency oil pump, Auxiliary oil pump and Main oil pump
  • Responsible for establishing and conforming of Machine Center line / Grid lines, Elevation, Levelness and Centers
  • Responsible for Concrete chippings to Packer plating (dry pack) and installation of Sub-sole plates
  • Responsible for the Grout pouring activities as per grout specs and volume
  • Responsible for the Precision alignments of coupling trains such as Steam Turbine- to-Generator-to-Exciter and various Pumps Coupling alignments
  • Responsible for the full Construction of the Steam Turbine and Generator.

Millwright Leadman

Ambit Engineering Corporation, Philippines
05.2005 - 11.2005
  • Hands-on responsibilities for the Overhauling of Steam Turbine, Turning oil pump
  • Emergency oil pump, Auxiliary oil pump, Main oil pump, Oil-Separator and Coolers
  • Responsible for Turbine dismantling such as Upper casing, Ring blades, Rotor blades, Journal bearings and Main Steam Valves
  • Responsible for establishing Machine match-markings, Center line / Grid lines
  • Elevation, Levelness and Centers
  • Responsible for the re-assembly of Steam Turbines, MSVs and various water and oil pumps with respect to its desired clearances, gaps and torques
  • Responsible and Hands-on for the Precision alignments of coupling trains such as Steam Turbine-to-Generator-to-Exciter and various Coupling alignments
  • Commissioning assists, responsible for the Oil flushing, Water flushing, Steam blowing and doing works as a Local operator during operation.

Millwright / Mechanical Maintenance

F-17 Construction Corporation Philippines
01.2001 - 01.2005
  • Assigned to various corrective works (Plant-wide) on Conveying systems such as Belt Conveyors, Pan and Bucket Conveyors, Drag chain conveyors, Air slide box, Bridge reclaimer and Boom Stocker / Reclaimer
  • Responsible to a various Overhauling works for Gear box, Fans, Coal mills, Raw mills and Ball mills, Oil-Separators and various types of pumps
  • Doing various Fabrication works such as Ball mill Partition screens, Fans and blower impellers, Slide gates, Slide box, Hoppers and Chutes and Impellers fabrications for Fans and Blowers
  • Doing overhauling works for Hydraulic and Pneumatic cylinders, Hydraulic pumps, Pressure blocks and compressors
  • Doing a Daily maintenance (preventive and corrective and on-line actions) task as per work orders in Plant-wide
  • Responsible for Critical task execution such as Bearing replacement, Impeller replacement, various Coupling precision alignments and Belt and Chain drives alignment
  • Take reading and records for Rotating-equipment Vibrations and Gear box Roots and Back-lush and Bearing clearance as per Bearing classifications
  • Daily routine Work-patrol as Plant-wide.

Marine Apprentice Engineer

Pablo Ko and Sons Shipping / PKS-Shipping Corp.
7 1999 - 10.2000
  • PERFORMING DUTIES AT ENGINE ROOM OF:
  • 1500 BHP 2 Stroke 8-Cylinders Mitsubishi Linear Marine Diesel Engine. Operation and Maintenance such as Pumps, Winches, Auxiliary engines, Boiler and Day tank and Pumps.
  • Perform ENGINE WATCH KEEPING during Navigation: Monitoring of Pressures, Temperatures, Flow rate of LFO and HFO, Charging air, Lube-oil, Exhaust, Steam, Cooling water and Main engine RPM and Tank sounding.
  • Maintenance and Troubleshooting works such as: Replacement of Failed Pistons, Oil rings, Compression rings, Connecting rods, Cam and Cam follower, Fuel pump, Fuel injection nozzles, Oil-Separators and Purifiers, Atomizing recalibration of Fuel nozzles.
  • Overhauling of Air Super charger.
  • Doing Piping works and welding.
  • Demonstrated strong analytical skills by assessing complex problems and developing feasible solutions under supervision of senior engineers.
  • Gained hands-on experience with various tools, machinery, and software systems through extensive training and practice.
  • Developed effective communication skills by presenting findings to colleagues during team meetings or progress reports.

Millwright

National Power Corporation Philippines
07.1993 - 06.1994
  • Hands-on for the Overhauling of Steam Turbine, Turning oil pump, Emergency oil pump, Auxiliary oil pump and Main oil pump
  • Hands-on for Turbine dismantling such as Upper casing, Ring blades, Rotor blades, Journal bearings and Main Steam Valves
  • Establishing Machine match-markings, Center line / Grid lines, Elevation, Levelness and Centers
  • Hands-on for the re-assembly of Steam Turbines, MSVs and various water and oil pumps with respect to its desired clearances, gaps and torques
  • Hands-on for the Overhauling of Hydraulic and Pneumatic cylinders
  • Hands-on for the Precision alignments of coupling trains such as Steam Turbine-to-Generator-to-Exciter and various Pumps Coupling alignments
  • Hands-on for the Dis-assembly and re-assembly of Coal mills, Turbine Oil pumps, Oil-Separators and Purifiers, and Plant cooling water pumps
  • Commissioning assists, responsible for the various Tank cleaning, Oil flushing, Water flushing, Steam blowing and lubrications of equipment prior to testing and Start-up.

Education

Bachelor of Science - Mechanical Engineering

University of Cebu Main Campus
Sanciangko Street, Cebu City, Philippines 6000
07.2023

Bachelor of Science - Marine Engineering

University of Cebu Maritime Education
Mambaling, Cebu City, Philippines 6000
03.1999

Skills

SKILLS / ABILITIES

Languages

English
Advanced (C1)
Indonesian
Upper intermediate (B2)
Malaysian
Upper intermediate (B2)
Japanese
Intermediate (B1)

Timeline

Field Service Technician / Technical Advisor

BABCOCK and WILCOX APAC (Present)
07.2024 - 8 2024

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
04.2024 - 06.2024

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
02.2024 - 03.2024

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
01.2024 - 02.2024

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
08.2023 - 09.2023

Field Service Engineering / Technical Advisor

BABCOCK and WILCOX APAC
07.2023 - 08.2023

Mechanical Technical Advisor / Mechanical Commissioning

MITSUBISHI HITACHI POWER SYSTEM / MITSUBISHI POWER LIMITED
08.2019 - 05.2023

Mechanical Maintenance Technician Foreman

BRY-51 Construction & Manpower Supply
11.2017 - 01.2019

Mechanical Supervisor

Korean Trading and Industries, KTI-Philippines Inc
08.2016 - 09.2017

Mechanical Supervisor

MITSUBISHI HEAVY INDUSTRIES, NAGSAKI, JAPAN
09.2015 - 12.2015

Mechanical / Millwright Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
05.2014 - 11.2014

Millwright Supervisor / Commissioning Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
01.2011 - 04.2012

Millwright Supervisor / Commissioning Maintenance Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
09.2009 - 12.2010

Millwright Supervisor / Commissioning Maintenance Supervisor

Mitsubishi Heavy Industries, Nagasaki, Japan
05.2007 - 06.2009

Millwright Leadman

TDK- Taihei Alltech Construction Philippines
02.2006 - 08.2006

Millwright Leadman

Ambit Engineering Corporation, Philippines
05.2005 - 11.2005

Millwright / Mechanical Maintenance

F-17 Construction Corporation Philippines
01.2001 - 01.2005

Millwright

National Power Corporation Philippines
07.1993 - 06.1994

Marine Apprentice Engineer

Pablo Ko and Sons Shipping / PKS-Shipping Corp.
7 1999 - 10.2000

Bachelor of Science - Mechanical Engineering

University of Cebu Main Campus

Bachelor of Science - Marine Engineering

University of Cebu Maritime Education
Griffin J. SuarezField Service Technician / Mechanical Millwright Supervisor / Mechanical Maintenance