Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Engr. Marco Uy

Civil Engineer
Taguig, Metro Manila

Summary

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

11
11
years of professional experience
2
2
Certifications

Work History

Project In Charge

Megabon Construction and Development Corp.
07.2023 - Current
  • Develop comprehensive project plans including deliverables, requirements, and timelines
  • Review of final construction drawing and material specifications prior executions.
  • Implement day to day operations target, scope of works and deliverables on site.
  • Preparation of Material Request (MR) and monitoring of Material Deliverables
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
  • Identified and resolved potential architectural issues.
  • Acted as contact for client's communication with field personnel.
  • Prepare detailed reports updating head office on project status, issues and proposed resolutions.
  • Facilitates weekly project meetings on site within all vendors, subcontractors, and stakeholders to ensure effective communications and alignment.
  • Prepares Minutes of the Meeting every week and coordination meeting to ensure all discussion are being noted.
  • Oversee project close-out procedures including turnover and documentation preparations.
  • Prepare Operation and Manual and collate all As-Built for submission to client and recording.

Accomplished Projects as to date:

  • Korean Visa Application Center at 9th floor and 10th floor Brittany Hotel BGC, Taguig
  • EXL 2nd Floor Recruitment Hub at One Ecom, Mall of Asia Complex, Pasay City
  • EXL 6th Floor HR Office Fit Out at One Ecom, Mall of Asia Complex, Pasay City
  • EXL 6th Floor Pantry Area Fit Out at One Ecom, Mall of Asia Complex, Pasay City
  • EXL 16th Floor Office Refresh at One Ecom, Mall of Asia Complex, Pasay City
  • Megabon New Office at Chatham House, Makati City



Project Supervisor

R.S. Carson General Construction
10.2021 - 06.2023
  • Provided status updates for projects, delivering information to all stakeholders.
  • Prepared all supplies and equipment needed for daily transport to job site.
  • Maintained high safety standards by following policies, procedures and protocols outlined by company.
  • Defined manpower, equipment and resource needs for field projects.
  • Supervised work of team members.
  • Weekly and Monthly accomplishment Report
  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.

Accomplished Projects:

  • The Seasons Residences Hallway and Lift Lobby ( Tower A and B ) at Uptown BGC, Taguig City
  • Mitsukushi Mall BGC at Uptown BGC, Taguig City
  • The Seasons Residence Lobby (Tower A and B) at Uptown BGC, Taguig City

Project In Charge

E.A. Vista Builders Corp. (FIT-OUT)
01.2019 - 10.2021
  • Over all in charge of common areas of Megaworld Condominiums.
  • Interprets and executes fit-out plans and specification.
  • Weekly & monthly Meeting with the developer and Subcontractors.
  • Coordinates with the project designer regarding actual condition of the projects.
  • Coordinates with the project designer regarding the approval of materials samples.
  • Ensures the safety protocols are being implemented in each sites.
  • Weekly progress report submission.
  • Submit technical drawings for clarifications and for approval of the head designers.
  • Coordinates and monitors the subcontractor works on proper execution and compliance in quality plans.
  • Material quantification and control.
  • As Built drawings

Accomplished Projects:

  • Suntrust Asmara Tower 2 hallway Fit out works (27 floors) at E.Rodriguez Quezon City.
  • Suntrust Asmara Tower 3 Ground Floor Main lobby at E.Rodriguez Quezon City.
  • Eastwood Global Plaza Hallway Fit out (40 floors) at Eastwood City Q.C.
  • Eastwood Global Plaza 18th floor Amenities at Eastwood City Q.C.
  • Uptown Bonifacio Global City World Commerce Place Renovation works at Bonifacio Global City.
  • Uptwon Park Suites Tower 2 Hallway Fit out works (40 Floors) at Bonifacio Global City.

Project Engineer

MGS Construction (WATER WORKS)
01.2018 - 12.2018
  • Main water line works at Bicol areas.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Materials procurement.
  • Road restorations works.
  • Coordination with the LGU regarding with the project implementations details and schedules.
  • Coordinates and monitors the subcontractor works on proper execution and compliance in quality plans.
  • Weekly progress report, billing for subcontractors and monthly accomplishment reports.
  • Traffic Management plans with the LGU.
  • Checked technical designs and drawings for adherence to standards.


Accomplished Projects:

  • Construction of 800 cubic meter earth mounted tank at Banader Daraga Albay.
  • Proposed 50mmØ HDPE pipeline Expansion at Daraga Albay.
  • Replacement of 360 Lm at Brgy. 5 Daet Camarines Norte.
  • Proposed 942 Lm x 75mmØ and 1527 Lm x 50mmØ uPVC pipe extention line at Brgy Kilicao, Daraga, Albay.
  • District Meter Assembly Installation at Brgy. Busay, Daraga, Albay.

Testing/Site Coordinator

Concrete Masters Inc.
02.2013 - 12.2013
  • Makes Concrete samples during concrete pouring.
  • Monitor the schedules of the samples for 7,14 and 28 days.
  • Calculate approximated volume of concrete for batchings.
  • Testing of cements samples.
  • Lab technician.
  • Checker.
  • Quality control of materials.

Education

Bachelor of Science - Civil Engineering

Technological University of The Philippines Taguig
Taguig, Metro Manila, Philippines
04.2001 -

Technology - Civil Engineering Technology

Technological University of The Philippines Taguig
Taguig, Metro Manila, Philippines
04.2001 -

Skills

    AutoCAD

    Drawing review

    Construction Site Management

    2D and 3D modeling

    Microsoft Office

    Problem-Solving

    Time Management

    Flexible and Adaptable

    Construction documentation

Certification

Building Information Modeling Revit Architecture Fundamentals (16hrs) -XStructures

Timeline

Building Information Modeling Revit Architecture Fundamentals (16hrs) -XStructures

06-2024

Project In Charge

Megabon Construction and Development Corp.
07.2023 - Current

Planswift and Primavera Application (16hrs)- MSTConnect

05-2023

Project Supervisor

R.S. Carson General Construction
10.2021 - 06.2023

Project In Charge

E.A. Vista Builders Corp. (FIT-OUT)
01.2019 - 10.2021

Project Engineer

MGS Construction (WATER WORKS)
01.2018 - 12.2018

Testing/Site Coordinator

Concrete Masters Inc.
02.2013 - 12.2013

Bachelor of Science - Civil Engineering

Technological University of The Philippines Taguig
04.2001 -

Technology - Civil Engineering Technology

Technological University of The Philippines Taguig
04.2001 -
Engr. Marco UyCivil Engineer