Experienced Quality Control Supervisor with expertise in team training, management, and monitoring. Committed to optimizing quality and reducing errors through enhancing system procedures and controls. Meticulous observer with a keen eye for detail, dedicated to monitoring and improving production activities.
Overview
12
12
years of professional experience
Work History
Quality Control Group Supervisor
EEI Corporation
The Estate Makati Project
03.2022 - Current
Review of Quality Control Inspection Plan and ensure proper implementation at site
Review and familiarize method statements, project specifications and applicable codes
Review of approved for construction drawings, shop drawings and material submittals
Conduct and evaluate site and laboratory test for quality purposes;
Soil/Backfilling materials:
Field Density Test (Moisture/Sand Cone Method / Nuclear Density Gauge)
Concrete /Concrete aggregates:
Sampling
Slump test and concrete temperature
Yield test and Air content determination
Concrete Compressive Strength Test
Concrete Flexural Strength Test
Reinforcing Steel Bars:
Sampling
Mechanical Test
Inspection of rebar and formworks prior to concrete pouring of the following structures;
Pile Cap
Column
Shearwall
Slab
Parapet wall
Evaluation of concrete testing, rebar testing, and other construction materials
Inspection of all incoming materials to ensure compliance with the project specifications, approved submittals and generate material receiving report
Conducts orientation and toolbox to workers on proper work procedures
Collate data prior to preparation of QC monthly reports
Coordinate with client’s representative on all activities prior to inspection
Prepare and issue Quality Control Inspection Report (QCIR) and Non-Conformity Report (NCR) on works not conforming to the approved for construction drawing and project specification
Ensure that all QC documents like Request for Inspection (RFI) and Inspection Work Request (IWR) are completely signed prior to filing
Updating of all QC documents and monitoring logs
Quality Control Supervisor
EEI Corporation
IMET BPO TOWER 2, 3 & 4 WITH PODIUM AND BASEMENT
11.2020 - 03.2022
Review of Quality Control Inspection Plan and ensure proper implementation at site
Review and familiarize method statements, project specifications and applicable codes
Review of approved for construction drawings, shop drawings and material submittals
Conduct and evaluate site and laboratory test for quality purposes;
Soil/Backfilling materials:
Field Density Test (Moisture/Sand Cone Method / Nuclear Density Gauge)
Concrete /Concrete aggregates:
Sampling
Slump test and concrete temperature
Yield test and Air content determination
Concrete Compressive Strength Test
Concrete Flexural Strength Test
Reinforcing Steel Bars:
Sampling
Mechanical Test
Inspection of rebar and formworks prior to concrete pouring of the following structures;
Pile Cap
Column
Shearwall
Slab
Parapet wall
Evaluation of concrete testing, rebar testing, and other construction materials
Inspection of all incoming materials to ensure compliance with the project specifications, approved submittals and generate material receiving report
Conducts orientation and toolbox to workers on proper work procedures
Collate data prior to preparation of QC monthly reports
Coordinate with client’s representative on all activities prior to inspection
Prepare and issue Quality Control Inspection Report (QCIR) and Non-Conformity Report (NCR) on works not conforming to the approved for construction drawing and project specification
Ensure that all QC documents like Request for Inspection (RFI) and Inspection Work Request (IWR) are completely signed prior to filing
Updating of all QC documents and monitoring logs
Quality Control Supervisor
EEI Corporation
Torre Lorenzo Malate
02.2018 - 11.2020
Review of Quality Control Inspection Plan and ensure proper implementation at site
Review and familiarize method statements, project specifications and applicable codes
Review of approved for construction drawings, shop drawings and material submittals
Conduct and evaluate site and laboratory test for quality purposes;
Soil/Backfilling materials:
Field Density Test (Moisture/Sand Cone Method / Nuclear Density Gauge)
Concrete /Concrete aggregates:
Sampling
Slump test and concrete temperature
Yield test and Air content determination
Concrete Compressive Strength Test
Reinforcing Steel Bars:
Sampling
Mechanical Test
Inspection of rebar and formworks prior to concrete pouring of the following structures;
Pile Cap
Column
Shearwall
Slab
Parapet wall
Evaluation of concrete testing, rebar testing, and other construction materials
Inspection of all incoming materials to ensure compliance with the project specifications, approved submittals and generate material receiving report
Conducts orientation and toolbox to workers on proper work procedures
Collate data prior to preparation of QC monthly reports
Coordinate with client’s representative on all activities prior to inspection
Prepare and issue Quality Control Inspection Report (QCIR) and Non-Conformity Report (NCR) on works not conforming to the approved for construction drawing and project specification
Ensure that all QC documents like Request for Inspection (RFI) and Inspection Work Request (IWR) are completely signed prior to filing
Updating of all QC documents and monitoring logs
Quality Control Supervisor
EEI Corporation
Air Residences Project
09.2015 - 02.2018
Review of Quality Control Inspection Plan and ensure proper implementation at site
Review and familiarize method statements, project specifications and applicable codes
Review of approved for construction drawings, shop drawings and material submittals
Conduct and evaluate site and laboratory test for quality purposes;
Soil/Backfilling materials:
Field Density Test (Moisture/Sand Cone Method / Nuclear Density Gauge)
Concrete /Concrete aggregates:
Sampling
Slump test and concrete temperature
Yield test and Air content determination
Concrete Compressive Strength Test
Reinforcing Steel Bars:
Sampling
Mechanical Test
Inspection of rebar and formworks prior to concrete pouring of the following structures;
Pile Cap
Column
Shearwall
Slab
Parapet wall
Inspection of Structural Steel box Girders and Precast concrete structures (Girder, slab & parapet)
Evaluation of concrete testing, rebar testing, and other construction materials
Inspection of all incoming materials to ensure compliance with the project specifications, approved submittals and generate material receiving report
Conducts orientation and toolbox to workers on proper work procedures
Collate data prior to preparation of QC monthly reports
Coordinate with client’s representative on all activities prior to inspection
Prepare and issue Quality Control Inspection Report (QCIR) and Non-Conformity Report (NCR) on works not conforming to the approved for construction drawing and project specification
Ensure that all QC documents like Request for Inspection (RFI) and Inspection Work Request (IWR) are completely signed prior to filing
Updating of all QC documents and monitoring logs
Quality Control Engineer 2
EEI Corporation
Green Residences Project
01.2013 - 09.2015
Review of Quality Control Inspection Plan and ensure proper implementation at site
Review and familiarize method statements, project specifications and applicable codes
Review of approved for construction drawings, shop drawings and material submittals
Conduct and evaluate site and laboratory test for quality purposes;
Soil/Backfilling materials:
Field Density Test (Moisture/Sand Cone Method / Nuclear Density Gauge)
Concrete /Concrete aggregates:
Sampling
Slump test and concrete temperature
Yield test and Air content determination
Concrete Compressive Strength Test
Reinforcing Steel Bars:
Sampling
Mechanical Test
Inspection of rebar and formworks prior to concrete pouring of the following structures;
Pile Cap
Column
Shearwall
Slab
Parapet wall
Inspection of Structural Steel box Girders and Precast concrete structures (Girder, slab & parapet)
Evaluation of concrete testing, rebar testing, and other construction materials
Inspection of all incoming materials to ensure compliance with the project specifications, approved submittals and generate material receiving report
Conducts orientation and toolbox to workers on proper work procedures
Collate data prior to preparation of QC monthly reports
Coordinate with client’s representative on all activities prior to inspection
Prepare and issue Quality Control Inspection Report (QCIR) and Non-Conformity Report (NCR) on works not conforming to the approved for construction drawing and project specification
Ensure that all QC documents like Request for Inspection (RFI) and Inspection Work Request (IWR) are completely signed prior to filing
Updating of all QC documents and monitoring logs
Education
Bachelor of Science - Civil Engineering
Nueva Ecija University of Science And Technology
General Tinio, Cabanatuan City
01.2011
High School -
Juan R. Liwag Memorial High School
Bayanihan, Gapan City
01.2006
Elementary -
San Isidro Central School
San Isidro, Nueva Ecija
01.2002
Skills
Quality training
Quality tools
Standard operating procedures
Microsoft office
Documentation control
Project management
Estimate
Quality control planning
QC inspections
Material testing