Summary
Overview
Work History
Education
Skills
Certification
Inductions
References
Timeline
Generic
Dylan Kirchler

Dylan Kirchler

7 Thooler Vista Trinity Park

Summary

Skill development and job stability with a group who operates construction related industries within Australia's mining, oil & gas, civil, telecommunications and renewable energies.

Overview

16
16
Certifications

Work History

Advanced Rigger/Crane Operator (Nov-2023)

M2P Engineering
  • Operations of Slew cranes (80t Lieber, 100t Tadano, 25 & 22t Franna).
  • Transport of construction, mechanical and plant machinery using tilt tray truck from surface to underground
  • Reading of plans to deliver rigging of structural, mechanical & piping components on the project
  • Installation of crushers, transfer silos and shafts
  • Was nominated as Health & Safety representative on site and actively involved in safety meetings and improving conditions around site.

Advanced Rigger (Jun 2022-Nov 2023)

McConnell Dowell

Demobilisation and Construction Of Berth 2 Coal Ship Loading Facility

  • Demobilisation of Ship Loader using cranes from 60T to 300T
  • Dogging and Rigging from bumb barges and tugboats, dealing with tides and swells movements
  • Involved as a HSR representative, talking with workers and management to overcome health and safety issues in a professional manner
  • Working together with rigging and crane crew on heavy lift ship, lifting 2000T modules into position for new berth
  • Performing rigging duties on Jack-Up Barges (IB 914 & SANTA FE)
  • Assisting in Drilling, Piling and Grouting
  • Helping with Barge moves, working in with tugboats, using mooring lines


Advanced Rigger (Feb 2021-Jun 2022)

Laing O'Rourke

Construction of Iron Ore Processing plant

  • Install of Structural steel, mechanical components and piping
  • Involved in technical lifts using equalising sheaves and following as per lift study
  • (50 to 150t)
  • Worked together as a crew to get the job done in a safely manner
  • Structural plan reading, good set up of work area's
  • VOC's of all plant and equipment

Advanced Rigger (Jun 2020-Feb 2021)

GR Engineering Service

Design, construction and commissioning of the Lakeway Potash Project

  • Install of structural steel, mechanical components and piping
  • Dogging and Rigging of all size cranes from Franna to 350t cranes
  • On site first aider, continued training and dummy exercise drills

Advanced Rigger/Franna Operator(Dec 2019-Jun 2020)

Kaefer (KLH)

Maintenance / Structural Integrity Project for the processing plant

  • Rigging of beams, braces, girders, columns and other parts of the plant which need replacing
  • Dogging, operating and rigging of slew cranes and franna
  • Trained and Working under work permits and isolations
  • Involved in toolbox and safety meetings to keep a safe work environment

Advanced Rigger / Franna Operator(Nov2019-Dec2019)

Freo Group

Shutdown works Primary Crusher, Benefication plant, Shaker Screens

  • Operating of 20T franna for all general lifts around site
  • Dogging and Rigging 220t, 300t Liebher slew cranes
  • Driving trucks, forklifts, telehandler and operating of EWP

Advanced Rigger/Crane Operator(Apr2019-Nov2019)

UGL

Construction of 2 Coal Wash Plants

  • Stick build and modular structural steel erection works
  • Installation of all mechanical components (motors, pumps, valves, screens, shakers, hoppers, etc)
  • Dogging and Rigging from 20T Franna to 350T Crawler
  • Operating of 20/25T Franna, 80T Tadano slew crane
  • Mobilise and Demobilise of Liebherr Crawler cranes from 100 to 1350T
  • Installation of piping from small to big bore pipe
  • Operations of EWP, telehandler and forklift



Advanced Rigger (Jan 2019-Apr 2019)

Downer Group

Upgrading and maintenance of CHPP

  • Replacement of valves, pump and motors assisting fitters
  • Removal of redundant flanged pipes and replacement with new ones
  • Structural steel rigging and dogging of 25T Franna to 400T Slew Crane
  • Operations of forklift, EWP, truck and 25T Franna
  • Safe work practices and general shutdown duties
  • Working under work permits, isolations for commissioning duties
  • Structural plan reading, safe work practices and general construction duties

Advanced Rigger(Nov 2018-Jan 2019)

Monadelphous

Rebuild and maintenance of a Dragline Crane (DRE 20)

  • Dogging and rigging 20T Franna's, 80 & 150T Crawler's
  • Setting up rigging gear to transfer from crane
  • Install pinions, drive motors, gears, boom sections, wire ropes, valves and pumps
  • Work together and liaise with BMA staff
  • Operations of telehandler & EWP
  • Working under work permits, isolations and conducting safe work practices

Advanced Rigger (May 2018-Nov 2018)

Goodline

Construction of a stacker, reclaimer and conveyor systems

  • Dogging 100, 250, 400T cranes and rigging of loads up to 100T
  • Operations of EWP, Telehandler and forklift
  • Contribute to team planning and safe execution of tasks
  • Obtaining work permits and isolations if needed for the task
  • Reading of structural plans

Advanced Rigger & Pile Rig Operator

UGL (May2017-May2018)

Construction of 50MW Solar Farms at Kidston & Collinsville

  • Loading and unloading of containers, sorting of panels, torque tubes and everything logistical
  • Operation of Pauselli 1200 & 900 Pile Driver and installation of over 200,000 piles
  • Dogging and Rigging of solar arrays with 60T slew crane

Advanced Rigger/Dogman (Nov 2016-May 2017)

Century Cranes
  • Dogging and rigging of franna's, tower cranes and slew cranes from 20T to 220T
  • Loading and unloading of trucks with forklift or telehandler
  • Contribute to team planning and execution of task safely
  • Maintenance of cranes and rigging gear quarterly inspections
  • Liaise with client in a professional manner to get the job done efficiently and safely

Advanced Rigger/Crane Operator (Nov 2014-Nov 2016)

CB&I / Kentz

Scope

  • Construction of a new LNG facility
  • All SMP (Steel, Mechanical and Piping) works for propane compressor

Role

  • Large and small bore pipe installations on gas train and pipe racks (up to approx
  • 20 tonne and 33 metre lengths)
  • Aligning and fitting pipe risers to compressors, spool movements for pipe fitters to complete line fit ups (lines up to 1800mm diameter)
  • Dual crane lifts, dual lifts using cranes and chain blocks and load transfers from cranes to manual rigging gear
  • Chain block and mechanical aid rigging movements of pipes and vessels
  • Dogging 200T to 1200T crawlers, 70T roughies, 20T / 25T Franna
  • Contribute to team planning and safe execution of tasks
  • EWP operations (Up to 135ft) & Working @ Heights
  • Confined space and restricted access work under permit
  • ISO plan reading, safe work practices and general construction duties

Advanced Rigger (Oct 2013- Nov 2014)

Thiess

Scope

  • Construction of a new LNG Facility
  • Piping crew responsible for all movements, install and fit up of large and small-bore pipe

Role

  • Stick build and modular steel erection works
  • Plan reading
  • Dog 250T and 500T cranes
  • Rigging and movement of pipes, blinds, steel, spades, actuators, valves, heads etc
  • Completion and management and JHA's
  • Other construction duties as required

Advanced Rigger-Forge Group (Jul 2013-Oct 2013)

Fortescue Metals Group (FMG)

Scope

  • Expansion of Iron One Processing facility

Role

  • Shutdown work on existing plant
  • Modular and stick build steel erection, pipe installation, vessel installation, grid mesh installs and general crane dogging from 60T Mobile to 350T with super lift
  • Gantry installations and flying fox constructions for tight space installs with no crane access
  • Modify scaffolding for rigging installs and erection of scaffold access
  • EWP operation (Up to 135T)
  • Setting up and executing working @ heights tasks

Advanced Rigger (Jan 2013-Jul 2013)

Monadelphous

Scope

  • Construction of transfer stations, conveyor lines and train load out facility

Role

  • Modular transfer station installation (160T), drive motors (32T), belt reels, GTU's and conveyor lines
  • Dogging 20T crawler, 70T and 80T roughies, 20T Franna and dual lifts of trestle legs
  • Steel erection, installations of components, pipe and manual rigging practices
  • Contribute to team planning and execution of tasks
  • EWP operations (Up to 135ft) & Working @ Heights
  • Structural plan reading
  • Safe work practices and general construction duties

Advanced Rigger (Mar 2012-Jan 2013)

Karridale Group

Scope

  • Construction of Iron Ore Processing Plant

Role

  • Stick build erection, pipe & mechanical installations
  • Install of wear plates on Ball Mills
  • Operate EWP's (Up to 135FT)
  • Structural plan reading
  • Working @heights and confined space work
  • Dogging 250T Crawler, 80T Slew crane & 20/25T Franna

Advanced Rigger / Crane Operator(Feb 2011-Mar2012)

UGL

Scope

  • Maintenance, repairs & upgrades on existing plant

Role

  • Rigging and movements of pipe, blinds, bundles, bundle pullers, spades, actuators, valves, heads etc
  • Working @heights and confined Space work
  • Operation of EWP's, Telehandler & 80T Slew Crane
  • Site first Aider
  • Inspection & Tagging & Maintenance of rigging gear
  • Completion & Management of permits & JHA'S

Advanced Rigger (Jun 2010- Feb 2011)

AGC

Scope

  • Construction of Handling plant, conveyor systems & transportation of modules ranging from 100T to 300T

Role

  • Stick build and modular steel erection works
  • Installation of gridmesh, apron feeders & shakers
  • Working @Heights and confined space work
  • Operation of EWP's (Up to 135FT)

Education

Pre-Apprenticeship Carpentry & Joinery
Godsford TAFE
01-1994

Year 12 High School Certificate
Corpus Christ College
01-1993

Skills

    Strong work ethic

    Quick learner

    Self motivated

    10 yrs FIFO construction and ridging work

    Team member

    Safe setup and task completion

    Clear communicator

    Reliable worker

    Good organization skills

    Workload management

    Computer literacy

    SAP

    Microsoft Office

    Packages(Project,Word,Excel,Access,Outlook)

Certification

License to perform High Risk Work

Inductions

  • BHP
  • RIO TINTO
  • FMG
  • BMA
  • CHEVRON
  • QGC
  • CITIC PACIFIC MINING

References

  • Robert Ninnness, Rigging & Crane Superintendent, McConnell Dowell, 0417 616 388
  • Stephen Green, Rigging & Crane Supervisor, Goodline, 0428 749 596
  • Darryl Wilson, Rigging & Piling Supervisor, UGL, 0428 452 914
  • Jeff Gutierrez, Rigging Supervisor, CBI/Kentz (Barrow Island), 0429 235 842
  • Bob Ausic, Supervisor, Thiess (Bellevue & Wolleebee Creek), 0417 283 215

Timeline

Advanced Rigger/Crane Operator (Nov-2023)

M2P Engineering

Advanced Rigger (Jun 2022-Nov 2023)

McConnell Dowell

Advanced Rigger (Feb 2021-Jun 2022)

Laing O'Rourke

Advanced Rigger (Jun 2020-Feb 2021)

GR Engineering Service

Advanced Rigger/Franna Operator(Dec 2019-Jun 2020)

Kaefer (KLH)

Advanced Rigger / Franna Operator(Nov2019-Dec2019)

Freo Group

Advanced Rigger/Crane Operator(Apr2019-Nov2019)

UGL

Advanced Rigger (Jan 2019-Apr 2019)

Downer Group

Advanced Rigger(Nov 2018-Jan 2019)

Monadelphous

Advanced Rigger (May 2018-Nov 2018)

Goodline

Advanced Rigger & Pile Rig Operator

UGL (May2017-May2018)

Advanced Rigger/Dogman (Nov 2016-May 2017)

Century Cranes

Advanced Rigger/Crane Operator (Nov 2014-Nov 2016)

CB&I / Kentz

Advanced Rigger (Oct 2013- Nov 2014)

Thiess

Advanced Rigger-Forge Group (Jul 2013-Oct 2013)

Fortescue Metals Group (FMG)

Advanced Rigger (Jan 2013-Jul 2013)

Monadelphous

Advanced Rigger (Mar 2012-Jan 2013)

Karridale Group

Advanced Rigger / Crane Operator(Feb 2011-Mar2012)

UGL

Advanced Rigger (Jun 2010- Feb 2011)

AGC

Pre-Apprenticeship Carpentry & Joinery

Year 12 High School Certificate
Dylan Kirchler