Electrical Engineer (BS EE) with over 3 years of hands-on experience in electrical installation, testing & commissioning, preventive maintenance, and troubleshooting of mechanical and electrical systems. Proven ability to supervise site projects, prepare budgets and shop drawings, coordinate contractors and suppliers, and enforce safety and quality standards during installation and turnover. Strong practical skills in electrical planning, equipment calibration, and fault diagnosis, focused on delivering projects on time and ensuring reliable system performance.
Overview
16
16
years of professional experience
Work History
Electrical Project Engineer
MJRL LANDSOURCE REALTY AND DEVELOPMENT COPRORATION
11.2020 - Current
Conduct property inspection assisted by top management for land acquisition
Conduct ground survey with colleagues and geodetic engineer to establish the coordinates point and boundaries of the property
Coordinate with adjoining property owner to make sure there is no conflict on property to survey
Follow up with geodetic engineer for the final topographic survey
Prepared subdivision plan scheme with colleagues for future marketing of the property
Prepare estimate and costing for site development plan including facilities and drainage plan lay out
Prepare for subdivision Electrical plan submission for approval of electrical power provider
Prepare for the house design with colleagues
Prepare electrical house design and schedule of load including sanitary
Acquired necessary permits for site development plan from government agencies
Apply certification from electric provider needed for requirement for application of licensees of the project
Application for approval of land title from government agencies
Prepare estimate for site construction materials and manpower for project implementation
Conduct toolbox meeting for the manpower for safety precautions and delivering the task on foreman and lead teams
Prepare weekly report for the progress of site to top management
Maintenance Engineer( RE EMPLOYED)
GOMECO METAL CORPORATION
02.2015 - 02.2020
Prepared lay out plan details for installation of electrical equipment and coordinate with management facility engineer for power supply capacity needed for the equipment
Conduct inspection on site for installation of equipment such as centralized ACU, FCU, COLD rooms and HVAC equipment
Coordinate with involved trade contractors for supply of water treatment needed for AHU aND FCUs
Supervised electrical technician, Rachtec technician, installers, welders and plumbers on every equipment installation on site
Supervised manpower to have safety environment with zero accident record
Conduct traverse testing of equipment to make sure the equipment is calibrated based on manufacturer standard
Conduct final testing and commissioning with the TNC team accredited by the engineering facility
Conduct inspection on equipment rooms and control room to check the conditions of machine to make sure it run properly
Prepare daily routine for the technician to make sure all mechanical and electrical equipment monitored timely
Performed root cause failure analysis on critical equipment leading to more effective preventative measures
Prepared and request materials for scheduled PMS and CMS after equipment has turn over to the Facility Team
Coordinate with facility engineer of MEPFS engineer for line up of PMS and CMS
Coordinates with Facility engineer and collaboration for PMS and CMS
Report weekly to MEPFS Engineer for the flow of PMS
Document maintenance activity and compliance with relevant regulations
Established maintenance schedules to ensure timely completion of all required tasks while minimizing disruptions to operations
Project Coordinator
UNIFAB METALS INDUSTRIES INCORPORATED
09.2014 - 02.2015
Managed the project assigned by the Manager, report site conditions
Prepare Budget allocation for technical team
Monitor work progress to meet the deadline on date
Coordinate on management if there is any changes or additional order of equipment by the client
Assist mobilization and delivery of equipment on site and securing permits
Prepared documentation and turn over properly the project to the client.
Project Coordinator
MERIT STAINLESS STEEL
02.2014 - 07.2014
Responsible to tract on going project status on every project assigned
Coordinate with the supplier for the availability of electrical equipment for deliveries on site
Check and ocular site inspection for utilities needed for the equipment
Coordinate with contractors for necessary permits for workers on site
Coordinate with safety management to conduct safety seminar of the workers before proceeding of installation
Prepare budget allocation for Technician and installer and workers for installation
Prepared daily task of technician and installer to ensure the project is deliver timely
Evaluation quality of work on site to ensure no more back job leave
Conduct punch-listing on site assisted by contractor for validation
Provide documentation for proper turn over of the Project
Project Engineer
GOMECO METAL CORPORATION
10.2012 - 02.2014
Supervised every project assigned by Project Manager as well as monitoring the status of project on site construction and installation.
Prepare budget allocation for materials needed on site and budget allocation for Installers, Technician and workers.
Prepare shop drawings for installation of electrical equipment
Coordinate with General contractors for utilities needed on site
Prepare necessary working permit for workers on site
Coordination with contractors engineer for standard requirement on installation of electrical equipment
Request an assistance to the contractor for verification of standard installation of electrical equipment
Conduct inspection during working hours to ensure standard safety precautions is mandated properly
Attend weekly contractors meeting for reporting work progress on site
Provide Testing and commissioning to the General contractor to ensure functionality of the electrical equipment installed
Prepare documentation for proper turn over upon completion of installation on site
Electrical Technician
SEEHOK CONSTRUCTION
02.2010 - 02.2012
Prepare budget allocation for material needed for installation on site
Coordinate to the office for budget preparation for purchasing construction materials
Prepare rough in layout on site for implementation and installation
Hands on installation electrical component and lighting
Testing wiring and other system parts for functionality
Calibrate equipment or machine together with the supplier for accurate functionality
Performed preventive maintenance on all electrical equipment on plant or site
Document on all maintenance and repair work for comprehensive records that facilitated future troubleshooting
Report on office for proper documentation and information of the top management
Education
Bachelor of Science - Electrical Engineering
Eastern Visayas State University
Tacloban City, Province Of Leyte, Philippines
04.2001 -
Skills
Scheduling and planning
Training and mentoring
Problem-solving
Team leadership
Analytical thinking
Project management
Timeline
Electrical Project Engineer
MJRL LANDSOURCE REALTY AND DEVELOPMENT COPRORATION
Electrical Project Engineer at Da Afghanistan Breshna Sherkat (DABS) - World Bank Funded ProjectsElectrical Project Engineer at Da Afghanistan Breshna Sherkat (DABS) - World Bank Funded Projects