Summary
Overview
Work History
Education
Skills
Knowledge And Skills
Highest Educational Attainment
Prc Number
Personal Information
Cycling
Timeline
CHRISTIAN GRACE SALES

CHRISTIAN GRACE SALES

CIVIL ENGINEER

Summary

Project Management, Project planning, work scheduling, quantity/cost estimation, quality and cost control, and supervision of civil, structural, and architectural works. Proficient in various civil engineering software applications.

Overview

20
20
years of professional experience
2003
2003
years of post-secondary education

Work History

Project Manager, PMO

INTERNATIONAL CONTAINER TERMINAL SERVICES, INC.
10.2015 - Current

Led cross-functional teams to deliver projects on time, within scope, and under budget.

Defined project plans and resource requirements to achieve goals and objectives.

Implemented risk mitigation strategies to minimize potential issues and ensure seamless project progression.

Projects Handled:

  • Bauan International Port, Inc. - Philippines (Present): 400m wharf, two trestles, and one mooring dolphin.
  • East Java Multipurpose Terminal - Indonesia (August 2022 - December 2024): 300m wharf and 1.5 ha container yard.
  • Small Terminal Projects - Global (April 2021 - July 2022): Included mooring dolphin construction, hangar renovation, various terminal repairs, project progress monitoring, and contractor claim delay analysis.

Planning/Submittal Engineer

_
07.2008 - 09.2015

Developed project schedules using Primavera (P3.1/P6), incorporating S-curves and critical path analysis. Created progress management systems and monitoring tools, alongside work breakdown schedules. Prepared comprehensive daily, weekly, and monthly progress reports, as well as look-ahead schedules. Generated management information system reports for management and various disciplines. Reviewed subcontractor schedules and verified their daily progress. Monitored subcontractor daily productivity, controlling and recording day-to-day site activities.

Companies:

1. DDT Konstract, Inc. (November 2009 - September 2015)

  • Construction of Okada Manila, Philippines
  • Construction of Globe Telecom Tower, BGC, Philippines
  • Reconstruction and Renovation of Ayuntamiento Building, Manila

2. Dharma Philippines Services Inc. (July 2008 - November 2009)

3. SKI Construction Group, Inc. (May 2005 - July 2008)

  • Construction of The Residences at Greenbelt, Manila Tower, Makati City, Philippines
  • Construction of Trinoma Mall, Quezon City, Philippines


Production Line /Process Engineer

ROVI Multi-Products, Inc.
10.2004 - 05.2005
  • Working on the production line manufacturing solid wood and engineered floorings, developing most economic and effective methods, establishing both production and finishing line procedures
  • Implementing quality control measures to ensure product consistency and durability
  • Supervising the supply and installation of laminate floorings
  • Organize and schedule manpower, materials, tools and equipment needed to implement the installation methodology
  • Prepare daily report and acquire necessary work permit, overtime, etc

Education

Bachelor of Science - Civil Engineering

Technological University of The Philippines, Manila, Metro Manila, Philippines
10-2003

Skills

Project scheduling

Knowledge And Skills

  • MS Office 2010 (Word, Excel Worksheet Formulation, PowerPoint, MS Project)
  • AUTOCAD 2000 ~ 2012
  • Primavera 3.10, P6
  • Internet Surfing/Technical Research
  • PC System and minor hardware troubleshooting / Minor Networking (LAN)

Highest Educational Attainment

Bachelor of Science in Civil Engineering, 2003, Technological University of the Philippines, Ermita, Manila

Prc Number

0099251

Personal Information

  • Planning
  • Work scheduling
  • Quantity/cost estimating
  • Quality and cost control
  • Supervision of various civil/structural and architectural works
  • Computer literate
  • Equipped with various Civil Engineering computer applications

Cycling

My passion is endurance cycling. I am fond of joining Audax rides, because I relish the challenge of pushing my physical and mental limits. The long distances and varying terrains test my resilience, and the camaraderie among fellow riders creates a unique and rewarding experience. I find the sense of accomplishment after completing a demanding Audax incredibly fulfilling, fueling my desire to continue exploring new routes and conquering new challenges.

Timeline

Project Manager, PMO - INTERNATIONAL CONTAINER TERMINAL SERVICES, INC.
10.2015 - Current
Planning/Submittal Engineer - _
07.2008 - 09.2015
Production Line /Process Engineer - ROVI Multi-Products, Inc.
10.2004 - 05.2005
Technological University of The Philippines - Bachelor of Science, Civil Engineering
CHRISTIAN GRACE SALESCIVIL ENGINEER