Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.
Overview
3
3
years of professional experience
3
3
Certifications
Work History
Quantity Surveyor
Makati Development Corporation
03.2024 - Current
Assigned to projects Miravera Land Development and Altaraza Spine Road Extension Phase 1
Prepare/obtain Quantity take-off for the Architectural Works based on the schematic plan and Quantity take-off for the Structural Works based on the elemental parameters
Prepare BQ and cost all the quantities therein for the approval of Unit Head
Input all the evaluated & acceptable cost of the corresponding items with quantities in the Bill
Prepare/identify plans for photocopy for pick-up of subcons/suppliers
Prepare letter for request of quotation from subcons/suppliers for different items for costings
Identify queries, qualifications made during the course of quantity take-off
Preparation of Abstract of Bid/analysis for approval of the unit head & endorsement to Bidcom
Evaluate and reconciliation of Variation (Change Orders)
Assist in processing billings of Legal retainers including insurance & bonding companies
Prepare and issue a) Affidavit; b) Quit Claims; c) Proj Undertakings; based on the requests made by all MDC projects for their progress billings, retentions, bonds etc.
Check completeness of the attachment being request for approval Operating Budget, to wit
Assistant Quantity Surveyor
Makati Developent Corporation
10.2022 - 03.2024
Assigned to Avida Towers Cloverleaf Tower 2 project
Prepare BQ and cost all the quantities therein for the approval of Unit Head
Maintain, monitor and update Cost Data Bank thru; Regularly input awarded cost taken from the QER in the data bank in the server
Obtain accurate Quantity take-off for the following scope of works as per assignment
Identify queries, qualifications made during the course of quantity take-off
Input quantities in the Bill of Quantities prepared by the Project Lead
Evaluate subcon/s proposal for the said scope of work
Reconciled quantity with Quantity Surveyor
Prepare site measurement and % accomplishment
Monitors Subcon billing status per project
Office Engineer
Metro Stonerich Corporation
06.2021 - 01.2022
Assigned to The Grid – Ten Storey Dormitel project
Inspect work site and prepare weekly and monthly reports, billings, and cost report for the project
Establish and maintain shop drawings, working drawings and submittals
Review, track, post, and distribute RFI’s, RFA’s, and change orders
Maintain organized and detailed construction files, projects records and logs
Monitor and evaluate materials and manpower needed for the project