Carlos Jr. Nautan

Batasan Hills, Quezon

Summary

Motivated professional experienced in leading teams to success. Possesses exceptional communication and problem- solving skills, as well as a strong ability to build relationships and motivate team members. Proven track record of developing successful teams and achieving organizational objectives.

Overview

23
23
years of professional experience
4
4
years of post-secondary education
3
3
Certifications
1
1
Language

Work History

Piping Team Leader

Saudi Arabian Kentz Co. Ltd
Yanbu
08.2023 - 11.2023
  • Preparation of blind as per blind list and drawing
  • Preparation of fire, steam, air, water hoses including manifolds and shift to its location
  • Constant monitor contractors during execution and make sure they follow safety and work procedure
  • Provide assistance as there go to Leader and decision making
  • Giving advice to workers on how to work safe and efficient way
  • Attend progress report meeting and giving feedback to Block Leader / Turnaround Manager updated report during our shift
  • Attend Daily Safety Meeting
  • Motivated team to achieve optimal results through effective communication and interpersonal skills.
  • Collaborated with other departments to ensure successful completion of projects.
  • Demonstrated excellent problem-solving and decision-making skills in resolving conflicts between team members.
  • Mentored and guided employees to foster proper completion of assigned duties.
  • Built strong relationships with customers through positive attitude and attentive response.
  • Supervised team members to confirm compliance with set procedures and quality requirements.

PIPE FITTER

PEC Ltd
Singapore
06.2019 - 03.2020
  • Cut out damaged piping lines and pipe supports from the pipe rack using a gas cutter and grinder
  • Manual lifting using a chain block to place the cut-out pipe spools on the ground
  • Fabricate and install piping spools and valves as per the drawing and specification
  • Remove, clean, and reinstall the process zone valve
  • Manual torqueing of bolts and nuts as per procedure
  • Remove, clean, and reinstall 100-mm bolts and nuts from the heat exchanger
  • Attend the safety toolbox meeting before starting the work.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated piping pieces and components in line with design specifications for each system.
  • Filled pipe systems with water and air to determine location of leaks.

MECHANICAL SUPERVISOR

SNC Lavalin /Saudi Arabian Kentz Co. Ltd, Saudi Aramco
Yanbu
02.2018 - 06.2018
  • Hot Bolting and blinding of columns, heaters, heat exchangers, reactors, and piping lines as per the markup drawing
  • Removal of pipe spools and fittings of pumps and equipment prior to the installation of temporary pipes, hoses, and gaskets for chemical cleaning
  • Cutting removal of pipe spools, removal valves pipe fittings that severely damage as per mark up drawing
  • Make certain that newly fabricated pipe spools, valves, fittings, and gaskets are installed correctly according to the drawing
  • Oversee hydro testing, air blowing, bolt torqueing, and flange re-facing prior to boxing up the pipe lines and equipment
  • Attend meeting and directly report to superior and, update progress of the project, before turnover to other shift
  • Attend the contractor's daily safety toolbox meeting and make sure they comply with company safety work plans and procedures
  • Assist unit operators prior to the startup of the unit.
  • Supervised installation of different types of mechanical equipment, keeping work in line with drawings and specifications.
  • Protected workers and general public by enforcing strict safety practices.
  • Reported on work progress to manager and incorporated feedback to maintain tight schedules.

Craftsman Pipefitter

Sraco
Yanbu
10.2013 - 06.2017
  • Participate in pre-commissioning and commissioning prior to starting up a new refinery plant
  • Perform inspections of pipe lines and other static equipment during construction and put the results in the punch list items
  • On-site routine maintenance and repair activities are performed on all static equipment (e.g., tanks, vessels, boilers, heat exchangers, pipe lines, and metal structures)
  • Follow-up on the personnel's adherence to routine maintenance policies and procedures
  • Conduct regular site visits to follow up on the work progress and inspect the maintenance equipment and tools
  • Confirm and review the technical scope of work for contracting maintenance work
  • Study and interpret engineering drawings and blueprints to determine materials requirements and task sequences
  • Oversaw contractors for cleaning, removal of damaged HDPE lining, and installation of new HDPE lining in the waste water pond area
  • Participate in boiler shutdown activities such as blinding pipelines and equipment, cleaning of boiler fire walls, economizer, mud drum, and steam drum, and so on
  • Removal and replacement of damaged super heater drain valves; removal of boiler PZV for calibration; assistance from NDT personnel for boiler tube testing; and preparation of the manifold for hydrostatic testing of the boiler before boxing it up
  • Involve in the Crude Distillation Unit (CDU) shut down; oversee contractor work as per the turnaround schedule, such as the blinding of the vacuum, the atmospheric column, the heaters, and the heat exchangers as per the mark
  • P&ID drawing
  • Opening of shell man ways, installation of blowers and lights Opening and manual cleaning of tray man ways, nozzles, spray distributors, and Spurger pipes; removal of coke, sludge, and debris at the bottom section of the column
  • Assist third-party inspectors for final inspection of shell nozzles, trays, and internals prior to de-blinding and boxing up of vacuum, atmospheric column, heaters, and heat exchangers, and make sure all jobs are safely executed as per the company's work safety plan and policy.

Pipefitter

Daewoo Engineering And Construction
12.2011 - 12.2012
  • Cutting, beveling, fitting up, and aligning 42-inch stainless steel pipes for the flare lines
  • Fit-up of low-temperature, double-extra-strong pipes, both small-bore and big-bore pipes, at the pipe rack area

Pipefitter

Daewoo Engineering & Construction
07.2010 - 07.2011
  • Alignment of boiler sidewalls, main header pipes, and steam drum
  • Installation of boiler tubes, main header, and down comer pipes
  • Fit-up fabricates and erects carbon steel and alloy steel pipes for the gas and steam lines of the boiler
  • Installation of valves and bolt tightening in accordance with drawings and specifications.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Fabricated piping pieces and components in line with design specifications for each system.

PIPE FITTER

Samsung Engineering
Jubail
03.2009 - 03.2010
  • Lay-out, cutting, fabricating, and installing pipe supports according to drawings and specifications
  • Fit-up, installation, and alignment of small bore, big bore, carbon steel, and stainless steel pipes
  • Construction Company
  • Country: Iran
  • Address: GS Yeokjeon Tower, 537, Namdaemun, Ro 5-ga Joong-gu, Seoul, 100-722 Korea
  • Project: South Pars Phases 9 and 10 Gas Pant

PIPE FITTER

GS Engineering & Construction
05.2008 - 12.2008
  • Fit-up and alignment of tie-in joints from 2-inch-diameter up to 10-inch-diameter carbon steel and stainless steel pipes
  • Installation of valves, bolts & gaskets as per drawing and specification
  • Line checking, punch listing, and reinstatement work
  • Assign leak testing and pipe line air blowing around the reactor.

Pipefitter

Jicon International Company
12.2007 - 05.2008
  • Fit-up align and install carbon, stainless, alloy small and big bore pipes at pin fan coolers, reactor & vessels
  • Installation of valves, bolts & gaskets according to drawing and specification.

PIPE FITTER

ARCC/EEI Corporation,
10.2006 - 11.2007
  • Manual lifting using a chain block and chain puller in the pipe rack to place the pipe spool into the correct position and location as per the drawing
  • Pipe spools are cut and beveled with a gas cutter and grinder prior to installation
  • Installation of valves, bolts, and gaskets as per the drawing and specification

Pipefitter

ARCC/EEI Corporation
01.2006 - 06.2006
  • Cutting of 42” pipe using cold cutting equipment
  • Manual lifting of pipe spools using a chain block and chain puller into position as per coordinates
  • Installation and fit-up of new pipe lines around the pipe rack
  • Attend the toolbox meeting before starting the work
  • Housekeeping before and after work

Pipefitter

ARCC/EEI Corporation
08.2003 - 04.2004
  • Manual erection of pipe spools using a chain block and chain puller for alignment of small pipe spools prior to fitting up along the furnace area
  • Installation of valves, bolts, and gaskets as per the drawing and specification
  • Manual torqueing of bolts and nuts as per procedure

PIPE FITTER

ARCC/EEI Corporation
10.2002 - 08.2003
  • Fit-up and alignment of small, big bore carbon and stainless steel pipes
  • Installation of valves, bolts and gaskets according to drawing and specification
  • Assigned in bolt tightening and hydro testing works.

Pipefitter

ARCC/EEI Corporation
12.2000 - 09.2002
  • Cutting, beveling, fit-up small, big bore carbon and stainless steel pipes around turbine generator area
  • Erection of pipe spools and valves
  • Installation of valves ,bolts, gaskets according to specification
  • Assign in oil flushing and steam blowing works.

Education

Diatagon Catholic High School
Diatagon Lianga Surigao Del Sur
03.1990 - 05.1994

Skills

Basic computer literate Teamwork Profound experience in Piping construction and its field executionundefined

Certification

NCII Pipe Fitting ( Metallic )

Timeline

Piping Team Leader

Saudi Arabian Kentz Co. Ltd
08.2023 - 11.2023

NCII Pipe Fitting ( Metallic )

01-2023

PIPE FITTER

PEC Ltd
06.2019 - 03.2020

MECHANICAL SUPERVISOR

SNC Lavalin /Saudi Arabian Kentz Co. Ltd, Saudi Aramco
02.2018 - 06.2018

Craftsman Pipefitter

Sraco
10.2013 - 06.2017

Pipefitter

Daewoo Engineering And Construction
12.2011 - 12.2012

Pipefitter

Daewoo Engineering & Construction
07.2010 - 07.2011

PIPE FITTER

Samsung Engineering
03.2009 - 03.2010

PIPE FITTER

GS Engineering & Construction
05.2008 - 12.2008

Pipefitter

Jicon International Company
12.2007 - 05.2008

PIPE FITTER

ARCC/EEI Corporation,
10.2006 - 11.2007

Pipefitter

ARCC/EEI Corporation
01.2006 - 06.2006

Pipefitter

ARCC/EEI Corporation
08.2003 - 04.2004

PIPE FITTER

ARCC/EEI Corporation
10.2002 - 08.2003

Pipefitter

ARCC/EEI Corporation
12.2000 - 09.2002

Diatagon Catholic High School
03.1990 - 05.1994
Carlos Jr. Nautan