Motivated professional experienced in leading teams to success. Possesses exceptional communication and problem- solving skills, as well as a strong ability to build relationships and motivate team members. Proven track record of developing successful teams and achieving organizational objectives.
Overview
23
23
years of professional experience
4
4
years of post-secondary education
3
3
Certifications
1
1
Language
Work History
Piping Team Leader
Saudi Arabian Kentz Co. Ltd
Yanbu
08.2023 - 11.2023
Preparation of blind as per blind list and drawing
Preparation of fire, steam, air, water hoses including manifolds and shift to its location
Constant monitor contractors during execution and make sure they follow safety and work procedure
Provide assistance as there go to Leader and decision making
Giving advice to workers on how to work safe and efficient way
Attend progress report meeting and giving feedback to Block Leader / Turnaround Manager updated report during our shift
Attend Daily Safety Meeting
Motivated team to achieve optimal results through effective communication and interpersonal skills.
Collaborated with other departments to ensure successful completion of projects.
Demonstrated excellent problem-solving and decision-making skills in resolving conflicts between team members.
Mentored and guided employees to foster proper completion of assigned duties.
Built strong relationships with customers through positive attitude and attentive response.
Supervised team members to confirm compliance with set procedures and quality requirements.
PIPE FITTER
PEC Ltd
Singapore
06.2019 - 03.2020
Cut out damaged piping lines and pipe supports from the pipe rack using a gas cutter and grinder
Manual lifting using a chain block to place the cut-out pipe spools on the ground
Fabricate and install piping spools and valves as per the drawing and specification
Remove, clean, and reinstall the process zone valve
Manual torqueing of bolts and nuts as per procedure
Remove, clean, and reinstall 100-mm bolts and nuts from the heat exchanger
Attend the safety toolbox meeting before starting the work.
Followed safe work practices, which included fall protection and personal protective equipment.
Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Fabricated piping pieces and components in line with design specifications for each system.
Filled pipe systems with water and air to determine location of leaks.
MECHANICAL SUPERVISOR
SNC Lavalin /Saudi Arabian Kentz Co. Ltd, Saudi Aramco
Yanbu
02.2018 - 06.2018
Hot Bolting and blinding of columns, heaters, heat exchangers, reactors, and piping lines as per the markup drawing
Removal of pipe spools and fittings of pumps and equipment prior to the installation of temporary pipes, hoses, and gaskets for chemical cleaning
Cutting removal of pipe spools, removal valves pipe fittings that severely damage as per mark up drawing
Make certain that newly fabricated pipe spools, valves, fittings, and gaskets are installed correctly according to the drawing
Oversee hydro testing, air blowing, bolt torqueing, and flange re-facing prior to boxing up the pipe lines and equipment
Attend meeting and directly report to superior and, update progress of the project, before turnover to other shift
Attend the contractor's daily safety toolbox meeting and make sure they comply with company safety work plans and procedures
Assist unit operators prior to the startup of the unit.
Supervised installation of different types of mechanical equipment, keeping work in line with drawings and specifications.
Protected workers and general public by enforcing strict safety practices.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.
Craftsman Pipefitter
Sraco
Yanbu
10.2013 - 06.2017
Participate in pre-commissioning and commissioning prior to starting up a new refinery plant
Perform inspections of pipe lines and other static equipment during construction and put the results in the punch list items
On-site routine maintenance and repair activities are performed on all static equipment (e.g., tanks, vessels, boilers, heat exchangers, pipe lines, and metal structures)
Follow-up on the personnel's adherence to routine maintenance policies and procedures
Conduct regular site visits to follow up on the work progress and inspect the maintenance equipment and tools
Confirm and review the technical scope of work for contracting maintenance work
Study and interpret engineering drawings and blueprints to determine materials requirements and task sequences
Oversaw contractors for cleaning, removal of damaged HDPE lining, and installation of new HDPE lining in the waste water pond area
Participate in boiler shutdown activities such as blinding pipelines and equipment, cleaning of boiler fire walls, economizer, mud drum, and steam drum, and so on
Removal and replacement of damaged super heater drain valves; removal of boiler PZV for calibration; assistance from NDT personnel for boiler tube testing; and preparation of the manifold for hydrostatic testing of the boiler before boxing it up
Involve in the Crude Distillation Unit (CDU) shut down; oversee contractor work as per the turnaround schedule, such as the blinding of the vacuum, the atmospheric column, the heaters, and the heat exchangers as per the mark
P&ID drawing
Opening of shell man ways, installation of blowers and lights Opening and manual cleaning of tray man ways, nozzles, spray distributors, and Spurger pipes; removal of coke, sludge, and debris at the bottom section of the column
Assist third-party inspectors for final inspection of shell nozzles, trays, and internals prior to de-blinding and boxing up of vacuum, atmospheric column, heaters, and heat exchangers, and make sure all jobs are safely executed as per the company's work safety plan and policy.
Pipefitter
Daewoo Engineering And Construction
12.2011 - 12.2012
Cutting, beveling, fitting up, and aligning 42-inch stainless steel pipes for the flare lines
Fit-up of low-temperature, double-extra-strong pipes, both small-bore and big-bore pipes, at the pipe rack area
Pipefitter
Daewoo Engineering & Construction
07.2010 - 07.2011
Alignment of boiler sidewalls, main header pipes, and steam drum
Installation of boiler tubes, main header, and down comer pipes
Fit-up fabricates and erects carbon steel and alloy steel pipes for the gas and steam lines of the boiler
Installation of valves and bolt tightening in accordance with drawings and specifications.
Eliminated risks by correctly identifying potential safety hazards.
Fabricated piping pieces and components in line with design specifications for each system.
PIPE FITTER
Samsung Engineering
Jubail
03.2009 - 03.2010
Lay-out, cutting, fabricating, and installing pipe supports according to drawings and specifications
Fit-up, installation, and alignment of small bore, big bore, carbon steel, and stainless steel pipes