To pursue a challenging career in the field of construction, commissioning and maintenance so that I can utilize my knowledge and skill of electrical and Instrumentation effectively and efficiently in a practical manner in my professional approach.
A dedicated Electrical & Instrumentation Supervisor and Foreman with over 15 years of international experience in construction, power plants, refineries, oil & gas, and industrial projects across the Middle East, Southeast Asia, and the Philippines. Skilled in supervising electrical installations, instrumentation works, troubleshooting, and preventive maintenance, while also capable of hands-on work as a foreman when required. Proven ability to lead and train multinational teams, coordinate with engineers and project managers, and ensure compliance with international safety standards. Certified in Electrical Safety, PTW Authorization, Confined Space, LOTO, and Work at Height, with a strong track record of delivering projects safely, efficiently, and on schedule.
⦁ Installation of earthing matt/ tape grounding system for substation connected to structural support and Equipment
⦁ lifting assembly structural support for High Voltage disconnector/isolator
⦁ intallation of main core substation high voltage transformer,HV current transformer,surge/lighting arrester ,isolator,circuit breaker and power transformer
⦁ Layout markings and centering for main foundation pad for high voltage power transformer
⦁ installation and fabricate of cable tray and cable ladder
⦁ cable laying and pulling of control cable,power cable and termination to switch gear and control panel
⦁ cable pulling of bare wire cable for fencing area and earthing rod installation.
⦁ Lifting ,Assembly parts of GSUT- SIEMENS Energy high voltage transformer (645MVA) & UAT-HYOSUNG (85MVA) transformer main body parts bolt torquing HV &LV turret, concervator,breather installation,radiator ,cable connection,installation of safety device and charging with dry air and leak test
⦁ IPB pipe lifting fit-up alignment cutting ,grinding conductor,enclosure and ensure distance good alignment transformer bushing and IPB terminal in specific drawing for busbar link
⦁ Conduct pre-testing meggering conductor,enclosure of IPB pipe
⦁ Assist vendor installation for HV bushing for transformer monitoring device(TMS)
⦁ Assist vendor for (OLTC )overload tap changer setup and functional test UAT & GSUT
⦁ GCB, Air pressurization panel,air line tubing,accessories rubber bellow installation,
⦁ Isolated Phase Busduct air pressurization panel leak test for time interval according to specific standard to the client
⦁ Responsible for preparation Extension bus bar,flexible link installation bolt torquing and markings to GSUT,UAT,GCB, steam turbine Generator & transformer,
⦁ High voltage circuit breaker assist with the vendor for charging with SF6 gas for arc quincher and excellent electrical insulator
⦁ Assist vendor for oil sampling & properties GSUT,UAT,and transformer excitation
⦁ Assist vendor MITSUBISHI POWER generator for AC/DC ring busduct high Voltage insulation wrapping,neutral phase star connection flexiblelink busbar installation,alignment
⦁ gravel filling around the substation for safety purposes of personnel touch and step high resistivity insulation