Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

ANTHONY HOFFMAN

Cebu City, Province Of Cebu

Summary

I possess 49yrs of experience in the Construction Industry. I take a sensible “Can Do” approach to my work and thrive on challenges that others think are too hard. Over the years I have successfully diversified my career to encompass Petrochemical, Mechanical Installation, Civil Construction, Earthworks, Marine, Offshore Pipelines, Tunnels, ABWF, EWS, Building , Hotel Fit Out , Welding Inspection, Coatings application and inspection i have worked throughout various locations in South East Asia , The Middle East and Australia I am a lateral thinker and can carry out all multi discipline projects successfully and Turn Key . I place a high emphasis on Health and Safety and its implementation.

Overview

51
51
years of professional experience
1
1
Certification

Work History

Senior Construction / Completions Manager

QDVC
05.2022 - Current

Responsible for Construction completion , Closing of NCRs , Snags and SORs , Site inspections with End users and handovers

Senior Construction Manager

SNC Lavalin Salalah Liquified Ammonia Plant Oman
01.2020 - 01.2022
  • Responsible for Civil Works, EVA, Cooling Tower Erection, Underground Piping, Steel Erection, Rotating Equipment, Above Ground Piping Systems, Assist in Plant Start up

Senior Construction Manager

Arabtec / CCC Consolidated contractors Limited Abu Dhabi Plaza
01.2019 - 04.2020
  • Responsible for project delivery of Sheraton Hotel, Sheraton Serviced Apartments, 3 x Commercial Residential Towers, Shopping Mall. 76 Story Mega Commercial Residential Tower; External Finishing’s, Basements and Car Parks.

Construction Manager China Light and Power

Leighton Contractors Asia Limited
01.2019 - 01.2020
  • Turbine enclosure civil installation, installation Turbine enclosure Facade system , preparation and Installation of Turbine Cooling Water System construction of Mini TBM launching shafts , Installation of modification of existing seawater intake structure and installation of new seawater intake culverts

Site Manager 810A High Speed Rail Terminus

Leighton Contractors Asia Limited
01.2015 - 07.2019
  • North Top Down Responsible for Earthworks, Concrete Slabs, Structures, Diaphragm wall Strutting, Top Down excavation sequence from Ground floor to Basement level 5, Erection of station Main entry Atrium structure by counter lever main trusses, secondary, tertiary steel installation and façade systems, Birdcage and suspended scaffolding systems

Site Manager Sludge Treatment Facility

Leighton Contractors Asia Limited / Veolia JV
01.2014 - 03.2015
  • Responsible for all Construction Site activities

Site Manager Aviation Fuel Facility

Leighton Contractors Asia Limited
01.2010 - 03.2012
  • Responsible for Onshore Civil, Mechanical Piping and erection of 9 Aviation Fuel Storage Tanks, Offshore Jetty piling and Top Side installation, Construction of Shallow Water Pipe Lay Barge Leighton Faulkner Pipe Lay Installation of Twin 20” Shallow Water Pipelines Pre pipe lay trenching by dredging barge across Urmstan rd Fairway Whilst maintaining access for all marine traffic closely liaise daily with Hong Kong Marine Department for dredging, pipe lay and armor rock placement operations, barge lay of 64mm dia cables within trench for beach pull of pipelines Driving of 1.2m dia jetty piles by barge with protective air curtain for reduction of underwater noise transmission for protection of Chinese Pink Dolphins

Client Rep Pipelay Barge / Crane Barge

Leighton Contractors Asia Limited
01.2009 - 12.2009
  • Member of Design, procurement, Construction team lead to construct commission sea trial Leighton Crane Barge Mynx And Leighton Shallow Water Pipe Lay Barge Stealth

Construction Manager

Leighton Contractors Asia Limited
01.2007
  • Shell Refinery Bukom Island to Pasir Panjang twin 10” Offshore Shallow Water Pipelines, Fit out Shallow Water Pipe lay Barge Construction manage Shallow Water Pipe lay operations including Beach Pulls, Challenging project undertaken. In Singapore’s main shipping channel anchor patterns severely restricted, Due to excessive marine traffic extra length pendent bouy wires were used to bring anchor pendant buoys back to within approved Restricted distance from barge closely liaise pipelay operations with Singapore port authority.

Construction Manager

Leighton Contractors Asia Limited
01.2005
  • Town Gas Pipe Line Project Construction Manager Fit out of Offshore Shallow Water Pipeline lay barge to twin pipe lay configuration. Lay twin 20” pipelines simultaneously from Dapeng PRC across Mirs Bay and through Tolo Harbour, pipes were laid through Marine Police boom gates at the Tolo Harbour entry,marine park sensitive areas and local fish farms in Tai Mei Tuk, Pipelines buried by post trenching machine to achieve 3m Armor Rock cover placed by Derrick Lighter and Rock Placement Hopper barge, pipe crossings constructed by marine piles with restricted anchor patterns caused by anchor crossings of existing services including the use of mid line anchor buoys to ensure anchor wires not to come into contact with existing underwater services.

Section Manager

Leighton Contractors Asia Limited
01.2004
  • North Luzon Expressway. Responsible for Earthworks, Structures, Bridge widening, Bore piling, Widening of existing 80khm dual carriageway highway under live traffic conditions, Construction of Toll Plazas, Roundabouts, interchanges and Viaducts, Novaleches Fly over and Bridge Seismic Retrofitting.

Client Rep and Erection Manager

Leighton Contractors Asia Limited
01.2003
  • Light Rail Responsible for the fabrication of composite bridge beam and bridge diaphragms and permanent formwork in King Hang fabrication yard, Nightshift Installation of Suspended Bridge beams, diaphragms and precast decking during Rail Network Nightly Shutdown, concrete casting of decks, parapet installation

General Superintendent

Leighton Contractors Asia Limited
01.2003
  • Westrail Responsible for the Installation of FST, LVT Track Systems and track infill concreting including collision up stands and coping slabs throughout TBM Tunnels and Stations along West rail line.

General Superintendent

Leighton Contractors Asia Limited
01.2002
  • Mulawagela Pipeline and SPM Project Responsible for Pipe Lay barge fit out and production work for pipe lay and SPM Installation. Directional drilling under shallow reef for beach pulling operation then lay away and abandon pipe line, Sink and pile Marine Plem, measure fabricate and fit underwater tie in spool, positioning of plem mooring system and cross tensioning and anchorage system, beach assembly of SPM pick up floating hose installation of floating pick up hose, Flood, gauge pig and hydrostatic testing and SPM System.

General Superintendent

Leighton Contractors Asia Limited
01.2001
  • Cabot Chemical Plant Offshore 18” Shallow water Pipe Line and SPM. Responsible for Lay barge Fit out and all production activities For Pipe Lay, Beach Pull 18” pipeline to shore and lay away pipe in pre dredged trench and Pipe Laydown, Position of subsea Plem measure fabricate and fit underwater tie in Spool, positioning of plem mooring system and cross tensioning, beach assembly float off and installation of floating pick up hose to Plem system, Flood, gauge pig and hydrostatic Testing of SPM system.

General Superintendent

Leighton Contractors Asia Limited
01.2001
  • HKIA North: Cargo Apron Works Responsible for Fabrication and installation of 18” Aviation Fuel Bunkering Systems including internal coatings to Aviation Cargo Stands Associated civil work and pavements, tie ins to existing Hydrant System, testing and commissioning of Hydrant System.

Fabrication and Installation Manager

Leighton Contractors Asia Limited
01.2000 - 01.1999
  • Tai Po to Butterfly Valley Aquaducts Fabrication Installation Tai Po to Butterfly Valley WSD Aqua Ducts, Fabricate 2.7m dia steel liners in PRC, Installation of 13Km of 2.7dia Steel liner through TBM Bored Tunnels and Shafts VIA Pipe Transporter, Fit and weld Pipe Liners by Bugo semi-automatic welding system on 2 open work faces, installation of 6m diameter 60m high carbon steel surge relief shafts. In situ placement of cement mortar lining, Hydrostatic testing of Aquaducts

Superintendent

Leighton Contractors Asia Limited
01.1998
  • Sual Power Station. Responsible for topside concrete casting of jetty slabs fit out of 300m long Coal Loading Jetty.

Mechanical Superintendent

Leighton Contractors Asia Limited
01.1997 - 01.1996
  • HKIA Aviation Fuel Facility. Responsible for Mechanical Piping Erection, Rotating equipment installation, Stringing fit up of 8Khm of twin 20”Onshore Pipelines including internal and external coatings, Pigging Gauging and Hydrostatic testing of onshore pipelines, Erection 9 Aviation Fuel storage tanks and all above ground process piping systems.

Superintendent

Leighton Contractors Asia Limited
01.1996 - 01.1995
  • Butterworth to Penang Twin 44” Bottom Pull Pipeline Construction of Twin Pipeline launch way and winch Platform structure, Lay of pulling cables for the bottom pull of Pipelines across, Penang marine channel, fit up welding NDT and coatings of twin bottom pull 44” lines, Installation of Flotation tanks to enable greater negative buoyancy, Installation of Armor rock above pipelines, Pigging Gauging and Hydrostatic testing of pipelines.

Superintendent

Leighton Contractors Asia Limited
01.1995
  • Tai Lum Chung to Lantau Island WSD 82” Bottom Pull Pipeline Construction of Marine Launch way opposite Tuen Mun Hiway and winch platform at Lantau Island Lay of pulling cables for the bottom pull of pipeline across Lantau island channel, Position 55T Pipe segments to launch way and align fit up welding NDT and coatings, bottom pull of 82” pipeline, Installation of Flotation tanks to enable greater negative buoyancy, Launch string and float of 2 x 200m Pipe strings from launch way

Client Rep / Erection Manager

Leighton Contractors Asia Limited
01.1994
  • CLP Black Point Power Station. Structural Fabrication and erection of 6m dia Chimney flues, Helical Staircases and flue support steel and refractory lining, stationed in Shatin PRC to manage the fabrication of Chimney Flues and associated steelworks including all quality records, barge all steel work back to Black Point Power Station and manage all site erection works inside Waste Heat Chimneys.

Superintendent

Leighton Contractors Asia Limited
01.1992 - 01.1994
  • Mobil Refinery Mechanical erection of 3 x 600T Entec Naphtha charge heaters, Installation of radiant coils and associated waste heat ducting steel work and platforms, Erection of Fin Fan Coolers above Piperacks, Installation of piping systems throughout pipe racks, Testing and Commissioning of Piping Systems

Piping Supervisor

EPT – Fochi JV
01.1992
  • North West Shelf LNG Train 3 Responsible for Propane Compressor enclosure Installation of Suction Discharge piping, Lube oil and seal oil systems and Compressor enclosure associated piping systems. Balancing and final alignment of compressor piping to compressor suction and discharge flanges, Testing and Commissioning of LNG Train 3

Installation Supervisor

Saipem WA
01.1990
  • Cooljarloo Mineral Sands. Responsible for the Mechanical Piping Erection, Rotating Equipment Installation of Pigmentation plant, Installation of tanks and agitators, hoppers, vertical bucket conveyors, Fibreglass process piping, Testing and commissioning of Systems and Plant Startup.

Installation Supervisor

Saipem WA
01.1989
  • Fremantle Port Authority Warf Bunkering System Expansion Project Installation of additional 20”bunkering line to multi berth Cargo loading and re fueling Port, Fabricate pipe strings temporary Cap, float strings into position and hoist to Final location for fit up and welding, Coordinated NDT and Coatings Testing and Commissioning

Foreman

Eglo Engineering
01.1990
  • Australian Ship Building Industries Project: State Ships. Fabrication and Installation of Piping Systems throughout Engine room and Hull double bottoms of 3 Number 82m Cargo Ships.

Piping Foreman

Eglo Engineering
01.1990
  • North West Shelf LNG Train 2. Responsible for piping installation to Nuove Pignone Propane Compressor Enclosures, Piping Installation of compressor Suction Discharge piping Lube Seal oil and associated Process Piping systems and waste heat recovery units. Testing and Commissioning of LNG Train 2

Piping Foreman

Eglo Engineering
01.1989
  • Shell sulphur recovery unit. Responsible for Piping Installation to Pipe racks.

Piping Foreman

Eglo Engineering
01.1988
  • Linde Gas Project Mechanical Piping Installation, Responsible for fabrication and erection of piping to process Columns and pipe racks, LPG Bullets and Tanker Loading Docks.

Piping Foreman

Eglo Engineering
01.1987
  • ICI Ethylene Expansion Ethylene Compressors Enclosure, Mechanical Piping Installation Suction Discharge process piping.

Piping Foreman

Eglo Engineering
01.1986
  • ICI Olefins 2 Project Mechanical Piping Installation to piperacks.

Piping Foreman

Eglo Engineering
01.1984
  • Project: Nabalco Bauxite Plant Rehabilitation Mechanical Piping Installation for Bauxite Plant revamp

Piping Foreman

Eglo Engineering
01.1984
  • Project: Kidston Gold Mine. Mechanical Piping Installation Gold processing Plant installation of leaching tank Agitators and aeration systems, installation of ABS Piping systems

Piping Foreman

Eglo Engineering
01.1982
  • Cooper Basin Liquids Project Moomba Gas Fields. Responsible for Gas Compressor Enclosure Piping installation, Waste heat recovery unit. Piping, Pipe Racks onsite Piping pre Spooling installation and balancing of Compressor Suction Discharge piping and associated process and Utility Piping

Pipefitter

Eglo Engineering
01.1980
  • Ranger Uranium Project Acid Plant tasked with onsite fabrication of process piping and erection throughout Acid Plant Also tasked with pipe string preparation for twin 12” onshore pipeline to tailings ponds to maintain pipeline progress to onshore welding crews.

Pipefitter

Eglo Engineering
01.1980 - 01.1976
  • Undertook Numerous Shutdown work which were carried out at Caltex, Shell, and ICI Refineries working on CCR, CCU Sulpher Recovery units Waste Heat Recovery Units, Process Columns as well as ICI Olefins and Catoluem plants, time was spent in main workshop carrying out pipe spooling fabrication for various shutdown works for Caltex and Shell Refineries, workshop fabrication for launching legs of Cobia and Fortesque Bass Straight Oil Production Platforms

Apprentice Boilermaker Pipefitter

Eglo Engineering
01.1974 - 01.1976
  • Indentured Apprentice assigned to German Master Tradesman and Technical College attendance where taught to read and interpret General arrangement and Isometric drawings and the trade of Boilermaking Welding and Piping Fabrication.

Education

High School Diploma -

Homebush Boys
Sydney
12-1975

Skills

  • Construction management
  • Site management
  • Construction safety
  • Project scheduling
  • Team building and leadership
  • Scope management
  • Safety compliance
  • Subcontractor management
  • Site safety
  • Organized and detail oriented
  • Excellent customer relations
  • Management
  • Interpreting blueprints
  • New construction
  • OSHA compliance
  • Reading blueprints
  • Operations oversight
  • Codes compliance
  • Subcontractor oversight
  • Specifications review
  • Best building practices
  • Job site development
  • Building, demolition, and renovation
  • Project schedule adherence
  • Project budgeting
  • Heavy labor
  • Construction administration
  • Value engineering
  • Inspection principles
  • Scaffolding
  • Demolition
  • Manual dexterity
  • Critical thinking
  • Team collaboration
  • Health and safety compliance
  • Risk assessment
  • Team leadership
  • Decision-making
  • Verbal and written communication
  • Goal setting
  • Workforce management
  • Positive attitude
  • Attention to detail
  • Problem-solving
  • Multitasking Abilities

Certification

Qualifications Boilermaker / Pipefitter, CSWIP Welding Inspector 3.2

Timeline

Senior Construction / Completions Manager

QDVC
05.2022 - Current

Senior Construction Manager

SNC Lavalin Salalah Liquified Ammonia Plant Oman
01.2020 - 01.2022

Senior Construction Manager

Arabtec / CCC Consolidated contractors Limited Abu Dhabi Plaza
01.2019 - 04.2020

Construction Manager China Light and Power

Leighton Contractors Asia Limited
01.2019 - 01.2020

Site Manager 810A High Speed Rail Terminus

Leighton Contractors Asia Limited
01.2015 - 07.2019

Site Manager Sludge Treatment Facility

Leighton Contractors Asia Limited / Veolia JV
01.2014 - 03.2015

Site Manager Aviation Fuel Facility

Leighton Contractors Asia Limited
01.2010 - 03.2012

Client Rep Pipelay Barge / Crane Barge

Leighton Contractors Asia Limited
01.2009 - 12.2009

Construction Manager

Leighton Contractors Asia Limited
01.2007

Construction Manager

Leighton Contractors Asia Limited
01.2005

Section Manager

Leighton Contractors Asia Limited
01.2004

Client Rep and Erection Manager

Leighton Contractors Asia Limited
01.2003

General Superintendent

Leighton Contractors Asia Limited
01.2003

General Superintendent

Leighton Contractors Asia Limited
01.2002

General Superintendent

Leighton Contractors Asia Limited
01.2001

General Superintendent

Leighton Contractors Asia Limited
01.2001

Fabrication and Installation Manager

Leighton Contractors Asia Limited
01.2000 - 01.1999

Superintendent

Leighton Contractors Asia Limited
01.1998

Mechanical Superintendent

Leighton Contractors Asia Limited
01.1997 - 01.1996

Superintendent

Leighton Contractors Asia Limited
01.1996 - 01.1995

Superintendent

Leighton Contractors Asia Limited
01.1995

Client Rep / Erection Manager

Leighton Contractors Asia Limited
01.1994

Superintendent

Leighton Contractors Asia Limited
01.1992 - 01.1994

Piping Supervisor

EPT – Fochi JV
01.1992

Installation Supervisor

Saipem WA
01.1990

Foreman

Eglo Engineering
01.1990

Piping Foreman

Eglo Engineering
01.1990

Installation Supervisor

Saipem WA
01.1989

Piping Foreman

Eglo Engineering
01.1989

Piping Foreman

Eglo Engineering
01.1988

Piping Foreman

Eglo Engineering
01.1987

Piping Foreman

Eglo Engineering
01.1986

Piping Foreman

Eglo Engineering
01.1984

Piping Foreman

Eglo Engineering
01.1984

Piping Foreman

Eglo Engineering
01.1982

Pipefitter

Eglo Engineering
01.1980

Pipefitter

Eglo Engineering
01.1980 - 01.1976

Apprentice Boilermaker Pipefitter

Eglo Engineering
01.1974 - 01.1976

High School Diploma -

Homebush Boys
ANTHONY HOFFMAN